Loading...
Suggested Materials for TAC - incl draft final FS Workplan with RAO ...FW_ D1712508 Item 10.1 Feasibility Study WorkplanFrom:Sachi Itagaki To:Ivo Bergsohn Cc:Sachi Itagaki Subject:Suggested Materials for TAC - incl draft final FS Workplan with RAO ...FW: D1712508 Item 10.1 Feasibility StudyWorkplan Date:Friday, October 19, 2018 6:07:05 PM Hi Ivo – Per your draft agenda – I’ve suggested some handouts (I couldn’t get to Handout C): MOU Update (T. Carter) FS Work Plan (KJC submit to Grant Manager) – see draft final attached (Handout A) RAO discussion – how to address DFA comments would be helpful – see below Remedial Scenario Definition Update (KJC/DRI) PCE Contour comparison Draft 2016-2018 field data (handout B) vs GW model PCE (handout C) Draft Alternatives matrix (handout D – pdf of alts table only – updated to reflect accurate reference to model layers) Draft Replacement well map (Handout E) and DRI cross section (Handout F) LBWC 4 replacement? Draft Pumping for Capture LBWC 5/Replacement LBWC 4/TKWC 2 Max pumping rates for capture and water usage Approach to Modeling Remediation Refer to PCE contour, discuss vertical integration and scale challenges Propose mass based approach Status of other items Baseline Human Health Risk Assessment – under preparation Public Meeting 3 (11/7/2018 – tentative) Other? I’m out of the office Mon am (I am on cell til 9 am, in a meeting til about 11:30, then likely available after 1 or so- We can discuss first thing Mon am- Have a good weekend! Sachi ____________________________________________________ Sachi Itagaki, P.E., QSD | Principal, One Water Practice Kennedy/Jenks Consultants Direct: 650.852.2817 | Cell: 415.350.7803 From: Carter, Tricia@Waterboards <Tricia.Carter@Waterboards.ca.gov> Sent: Wednesday, October 03, 2018 1:23 PM To: ibergsohn@stpud.dst.ca.us; Grey, Brian@Waterboards <brian.grey@waterboards.ca.gov>; Jason Burke <jburke@cityofslt.us>; Jennifer Lukins (jennifer@lukinswater.com) <jennifer@lukinswater.com>; Kirk Wooldridge (kwooldridge@tahoekeyspoa.org) <kwooldridge@tahoekeyspoa.org>; Reeves, Robert@Waterboards <Robert.Reeves@waterboards.ca.gov>; Rezvani, Ali@Waterboards <Ali.Rezvani@waterboards.ca.gov>; Richard Robillard (RRobillard@tahoekeyspoa.org) <RRobillard@tahoekeyspoa.org>; Turrubiartes, Salvador@Waterboards <Salvador.Turrubiartes@waterboards.ca.gov> Cc: Sachi Itagaki <SachiItagaki@kennedyjenks.com>; Lynn Nolan <lnolan@stpud.dst.ca.us>; Heidi Baugh <hbaugh@stpud.dst.ca.us> Subject: RE: D1712508 Item 10.1 Feasibility Study Workplan Hello Ivo, The Division of Financial Assistance (DFA) has reviewed the Feasibility Study (FS) Work Plan, submitted on 13 September 2018, for the South Tahoe Public Utility District’s Planning Project (D1712508). DFA has the following comments on the draft FS Work Plan. DFA staff has comments on the Remedial Action Objectives and the data necessary to evaluate potential cleanup alternatives. 1. Page 1, Feasibility Study Steps – Step 1, Data Review with Feasibility Study Kick-off Meeting – Item B lists a number of recent reports that will be reviewed/considered when preparing the Feasibility Study. Please include the report that summarizes the groundwater analytical data from the Tahoe Keys Property Owners Association well profiling event conducted in September 2018, if completed. Item D identifies recent monitoring events conducted by other entities. Please list the entities and monitoring event dates for which groundwater analytical data will be reviewed/considered when preparing the Feasibility Study. 2. Page 6, Remedial Action Objectives (RAO) Table – RAO 5 (Cleanup Level); RAO 6 (Area of Attainment); and RAO 7 (Restoration Time Frame) RAO number five is specific to a cleanup level/objective. Please determine which Proposition 1 metric of success (e.g., contaminant reduction, mass removed, etc.) could l be achieved to satisfy this this RAO. RAO number six is specific to an area of attainment. Please identify the project area that will be addressed as part of the Project. RAO number seven is specific to a restoration timeframe. Please identify an estimated timeframe in which the metric of success in RAO number five could be achieved. Other South Y Specific Objectives Other objectives are listed in the table and can be deleted as they will be satisfied by other tasks identified in the grant agreement and/or as part of implementing the recommended alternative (e.g., preserve ability to recover response costs, preference for beneficial use of any extracted groundwater resource, reduce costs for groundwater remedial wellhead treatment to retail customers, perform community outreach). Thank you, Tricia Carter Water Resource Control Engineer Division of Financial Assistance Groundwater Grant Unit, Bonds Section State Water Resources Control Board P: 916.319-8259 F: 916.449-5655 Tricia.Carter@Waterboards.ca.gov From: Ivo Bergsohn <Ibergsohn@stpud.dst.ca.us> Sent: Thursday, September 13, 2018 4:10 PM To: Grey, Brian@Waterboards <brian.grey@waterboards.ca.gov>; Jason Burke <jburke@cityofslt.us>; Jennifer Lukins (jennifer@lukinswater.com) <jennifer@lukinswater.com>; Kirk Wooldridge (kwooldridge@tahoekeyspoa.org) <kwooldridge@tahoekeyspoa.org>; Reeves, Robert@Waterboards <Robert.Reeves@waterboards.ca.gov>; Rezvani, Ali@Waterboards <Ali.Rezvani@waterboards.ca.gov>; Richard Robillard (RRobillard@tahoekeyspoa.org) <RRobillard@tahoekeyspoa.org>; Turrubiartes, Salvador@Waterboards <Salvador.Turrubiartes@waterboards.ca.gov>; Carter, Tricia@Waterboards <Tricia.Carter@Waterboards.ca.gov> Cc: Sachi Itagaki <SachiItagaki@kennedyjenks.com>; Lynn Nolan <lnolan@stpud.dst.ca.us>; Heidi Baugh <hbaugh@stpud.dst.ca.us> Subject: D1712508 Item 10.1 Feasibility Study Workplan Hi All- Attached is a copy of the draft Feasibility Study Work Plan prepared by Kennedy Jenks Consultants for the Feasibility Study of Remedial Alternatives to Mitigate Tetrachloroethylene Contamination in South Lake Tahoe, CA (D1712508). As a member of the Technical Advisory Committee ( TAC), a draft copy of this workplan is provided for your review and comment. Please send your comments by email or embed them directly into the attached workplan, using track changes. In order to keep this project moving, I ask that send your review comments to me by no later than Wednesday, October 3rd, 2018. Thank you again for your time and participation on the TAC. Ivo Bergsohn, PG, HG Hydrogeologist South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 (530)543-6204 This email message has been delivered safely and archived online by Mimecast. This email message has been delivered safely and archived online by Mimecast.