Loading...
20210624_Addendum1_KellerPh2_PB_upload1 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR Keller-Heavenly Water System Improvements Project Phase 2 South Tahoe Public Utility District South Lake Tahoe, California June 24, 2021 2 GENERAL NOTES: This addendum updates prevailing wage requirements to reflect updated David Bacon Wages, makes modifications to the roof design (clarifying that the roof shall not be column supported), and adds a floor testing requirement. This addendum also includes responses to questions received during the bid period. THE FOLLOWING CHANGES ARE TO BE MADE TO THE SPECIFICATIONS: 1. Section 00 75 00 Davis Bacon Wage Attachments General Decisions REPLACE: General Decision Number: CA20210007 5/7/2021 (44 pages) General Decision Number: CA20210007 6/18/2021 (44 pages) WITH: General Decision Number: CA20210019 5/7/2021 (48 pages - Attached) General Decision Number: CA20210019 6/18/2021 (48 pages – attached. 2. Section 01 50 00, Temporary Facilities and Controls, Part 2 Execution, 2.05 Dust and Emissions Control ADD: Following item F., add: “G. The contractor shall submit a listing of engine driven equipment for review and approval by the El Dorado Air Quality Management District prior to use of the equipment onsite. The listing shall include equipment proposed for use by the contractor and any subcontractors, including both owned and rented equipment.” 3. Section 33 16 23 – Factory Powder Coated Bolted Steel Tank, Subpart 2.04 - Accessories, Paragraph D.1 ADD: Following the second sentence, add: “Prior to manufacture of pipe connections, the Contractor shall verify the location and elevation of the inlet nozzle and outlet nozzle flanges that were installed in the previous phase by others. The locations shown on the Drawings are approximate for bidding purposes and require verification.” 4. Section 33 16 23 – Factory Powder Coated Bolted Steel Tank, Subpart 3.03 – Testing and Inspection ADD: Add the following prior to the first paragraph of item C. Leak Test: “Testing and disinfection shall occur after storage tank erection. Tank interior shall be clean and free from direct, foreign substance, and debris. Seams of the tank floor plates shall be tested by observation for any bubbles in an NSF-61 soap solution coating with a glass top metal testing box connected to equipment that produces a vacuum of at least 2 psi. Deficient seams shall be corrected.” 5. Section 43 41 26 – Aluminum Roof, Pages 5 and 6 REPLACE: In the footer, “Section 01 36 40” WITH: “Section 43 41 26” 3 6.Section 43 41 26 – Aluminum Roof, Subpart 2.01 – Design Requirements, Paragraph A.1 DELETE: from the first sentence, “column-supported” 7.Section 43 41 26 – Aluminum Roof, Subpart 2.01 – Design Requirements, Paragraph E.1 DELETE: the following from the roof component table: QUESTIONS AND ANSWERS: 1. Question: When will the plans and specs be uploaded? Response: Plans and specs were uploaded on May 13, 2021. 2. Question: The formal contract section of the specs (section 00 52 00) states that: 3. Contractor agrees to complete said work, following the issuance of the Notice to Proceed, by ___________ (or approved extensions thereof) and to the entire satisfaction of the District before final payment is made. Contractor also agrees that all construction activities requiring excavation, earthwork or soil material removal shall occur between May 1, 2022 and October 15, 2022 (167 calendar days) in accordance with requirements 5/13/2021 SECTION 00 52 00 KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PROJECT, PHASE 2 FORMAL CONTRACT 2 of the Tahoe Regional Planning Agency (TRPA) and to the entire satisfaction of the DISTRICT before final payment is made. 4. Time is of the essence of this Contract. In Section 00 72 00 2.04 CONTRACT TIME AND LIQUIDATED DAMAGES A. The Contract Time shall be three hundred sixty-one calendar days from the date specified in the Notice to Proceed. All excavation or work that would disturb existing ground shall not commence until May 1, 2022and shall be completed by October 15, of the year in which the excavation or work occurs, in accordance with requirements of the Tahoe Regional Planning Agency. The new Keller Tank shall be complete, tested, accepted and in service by July 29, 2022.In the Project Execution section 01 73 00, 2.06 Work Sequence & Constraints #B 2)it states that: All work onsite must be completed on or before July 28, 2022 in advance of the next phase of construction below the tank site. Does this mean that the project must be done between May 1, 2022 and July 28, 2022 for an actual total of 59 calendar days? Response: The District anticipates issuing a partial notice to proceed for submittals and the procurement of materials following award of the contract in August or September 2021 (dependent on finalization of contract and required insurance documents). A full notice to proceed with construction of the tank would be issued after the tank site and access road is free of snow (snow removal is prohibited on unpaved surfaces), allowing the contractor to proceed with onsite construction. Attention is called to Section 01 73 00 Project Execution, Subsection 2.06 Work Sequence and Constraints that identifies that no consideration for delay will be given unless the site is inaccessible after May 15, 2022. In the event the site is clear of snow, non-earthwork activities may begin prior to May 1, 2022 in coordination with the District. “Columns Stainless steel pipe, Type 316” 4 3. Question: On the 150,000 gallon water tank, the spec calls for an aluminum geo dome roof assembly. My manufacture has an aluminum deck with a 12 to 1 pitch. W ould this be accepted for this project? Response: Yes, the described alternative roof is is acceptable, so long as they are aluminum, including the underlying supports, and coated on the exterior as called for in the specifications. Un-coated aluminum is not acceptable on the exterior due to visual impacts – the roof and any exterior aluminum supports shall be coated/painted. The interior and/or exterior roof support shall be aluminum, as identified in the specifications. As identified at the pre-bid meeting and clarified by this Addendum, the roof design shall not use, or rely on, any interior columns – there are no interior footings within the outer ring. Any roof design shall be designed in accordance with the parameters identified in the project specifications. Attention called to the high snow load that the tank is subject to. 4. Question: Is the angle for the anode assembly to be welded to the floor & tank shell? Response: Yes, per note 1 for detail 3/CP-2 and General Cathodic Protection Notes on Sheet C2, bracket to be welded. This Addendum No. 1, pages 1 through 4, plus attachments (46 sheets) shall become part of the Contract and all provisions of the Contract shall apply therein. The date and time for the Bid Opening has not changed. The time provided for the completion of the Contract has not changed. SOUTH TAHOE PUBLIC UTILITY DISTRICT June 24, 2021 Trevor Coolidge, P.E. Keith Karpstein, P.E. Senior Engineer Senior Engineer Ph. (530) 543-6278 Ph. (775) 284-7898 Exp. 3/31/22 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 1/44 "General Decision Number: CA20210007 06/18/2021 Superseded General Decision Number: CA20200007 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California. BUILDING CONSTRUCTION PROJECTS (excluding Amador County only); DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 01/15/2021 3 01/22/2021 4 02/05/2021 5 02/19/2021 6 02/26/2021 7 04/02/2021 8 04/23/2021 9 05/07/2021 10 05/14/2021 11 05/21/2021 12 06/18/2021 ASBE0016-001 01/01/2021 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 2/44 AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, & SONOMA COUNTIES AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 74.16 23.58 Area 2......................$ 46.81 33.50 ---------------------------------------------------------------- ASBE0016-007 01/01/2021 AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES AREA 2: MARIN & NAPA COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1......................$ 30.45 10.60 AREA 2......................$ 36.53 9.27 ---------------------------------------------------------------- BOIL0549-002 10/01/2016 Rates Fringes BOILERMAKER (1) Marin & Solano Counties.$ 43.28 37.91 (2) Remaining Counties......$ 39.68 35.71 ---------------------------------------------------------------- BRCA0003-001 08/01/2020 Rates Fringes MARBLE FINISHER..................$ 36.53 17.08 ---------------------------------------------------------------- BRCA0003-004 05/01/2019 AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 3/44 COUNTIES Rates Fringes BRICKLAYER AREA 1......................$ 43.24 21.63 AREA 2......................$ 45.92 26.70 SPECIALTY PAY: (A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above. (B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate. (C) Gunite nozzle person shall receive $1.25 per hour above the regular rate. ---------------------------------------------------------------- BRCA0003-008 07/01/2019 Rates Fringes TERRAZZO FINISHER................$ 37.58 17.33 TERRAZZO WORKER/SETTER...........$ 48.53 26.84 ---------------------------------------------------------------- BRCA0003-010 04/01/2019 Rates Fringes TILE FINISHER Area 1......................$ 27.31 14.75 Area 2......................$ 27.10 16.50 Area 3......................$ 29.94 16.38 Area 4......................$ 28.06 15.82 Tile Layer Area 1......................$ 45.51 17.64 Area 2......................$ 45.15 19.06 Area 3......................$ 49.90 19.16 Area 4......................$ 46.77 19.08 AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma ---------------------------------------------------------------- BRCA0003-014 08/01/2020 Rates Fringes MARBLE MASON.....................$ 51.30 28.47 ---------------------------------------------------------------- CARP0034-001 07/01/2020 Rates Fringes Diver Assistant Tender, ROV Tender/Technician...........$ 51.90 34.02 Diver standby...............$ 58.09 34.02 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 4/44 Diver Tender................$ 57.09 34.02 Diver wet...................$ 101.42 34.02 Manifold Operator (mixed gas)........................$ 62.09 34.02 Manifold Operator (Standby).$ 57.09 34.02 DEPTH PAY (Surface Diving): 050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot SATURATION DIVING: The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours. DIVING IN ENCLOSURES: Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. ---------------------------------------------------------------- CARP0034-003 07/01/2020 Rates Fringes Piledriver.......................$ 51.90 34.02 ---------------------------------------------------------------- CARP0035-001 08/01/2020 AREA 1: MARIN, NAPA, SOLANO & SONOMA AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN, LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA Rates Fringes Drywall Installers/Lathers: Area 1......................$ 52.65 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 5/44 ---------------------------------------------------------------- CARP0035-009 07/01/2020 Marin County Rates Fringes CARPENTER Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0035-010 07/01/2020 AREA 1: Marin, Napa, Solano & Sonoma Counties AREA 2: Monterey, San Benito and Santa Cruz AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties Rates Fringes Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03 ---------------------------------------------------------------- CARP0046-001 07/01/2020 El Dorado (West), Placer (West), Sacramento and Yolo Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 6/44 inside the city limits of Placerville. ---------------------------------------------------------------- CARP0046-002 07/01/2020 Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- CARP0152-003 07/01/2020 Amador County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- CARP0180-001 07/01/2020 Solano County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0751-001 07/01/2020 Napa and Sonoma Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 7/44 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP1599-001 07/01/2020 Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- * ELEC0180-001 06/01/2021 NAPA AND SOLANO COUNTIES Rates Fringes CABLE SPLICER....................$ 59.69 3%+24.38 ELECTRICIAN......................$ 53.06 3%+24.38 ---------------------------------------------------------------- ELEC0180-003 12/01/2020 NAPA AND SOLANO COUNTIES Rates Fringes Sound & Communications Installer...................$ 42.11 22.41 Technician..................$ 48.43 22.60 SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above. EXCLUDES- Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems. 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 8/44 ---------------------------------------------------------------- ELEC0340-002 02/01/2018 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES Rates Fringes Communications System Sound & Communications Installer...................$ 29.35 3%+15.35 Sound & Communications Technician..................$ 33.75 3%+15.35 SCOPE OF WORK Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide. B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 9/44 (2) conditions apply: 1. The project involves new or major remodel building trades construction. 2. The conductors for the fire alarm system are installed in conduit. ---------------------------------------------------------------- ELEC0340-003 02/01/2021 ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES Rates Fringes ELECTRICIAN Remaining area..............$ 41.56 32.49 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54 CABLE SPLICER: Receives 110% of the Electrician basic hourly rate. ---------------------------------------------------------------- ELEC0401-005 07/01/2020 ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES: Rates Fringes ELECTRICIAN......................$ 41.50 20.17 ZONE RATE: 70-90 miles - $8.00 per hour 91+ miles - $10.00 per hour ---------------------------------------------------------------- ELEC0551-004 06/01/2020 MARIN AND SONOMA COUNTIES Rates Fringes ELECTRICIAN......................$ 52.40 3%+23.31 ---------------------------------------------------------------- ELEC0551-005 12/21/2020 MARIN & SONOMA COUNTIES Rates Fringes Sound & Communications Installer...................$ 42.11 22.41 Technician..................$ 48.43 22.60 SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 10/44 Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above. EXCLUDES- Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems. ---------------------------------------------------------------- ELEC0659-006 01/01/2021 DEL NORTE, MODOC and SISKIYOU COUNTIES Rates Fringes ELECTRICIAN......................$ 38.49 17.74 ---------------------------------------------------------------- ELEC0659-008 02/01/2020 DEL NORTE, MODOC & SISKIYOU COUNTIES Rates Fringes Line Construction (1) Cable Splicer...........$ 60.28 4.5%+19.40 (2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 53.82 4.5%+19.40 (3) Tree Trimmer............$ 37.84 4.5%+14.30 (4) Line Equipment Man......$ 53.82 4.5%+19.40 (5) Powdermen, Jackhammermen...............$ 40.37 4.5%+14.30 (6) Groundman...............$ 33.37 4.5%+14.30 ---------------------------------------------------------------- ELEC1245-004 06/01/2020 ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 59.14 20.78 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 47.24 19.59 (3) Groundman...............$ 36.12 19.19 (4) Powderman...............$ 51.87 18.79 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 11/44 ---------------------------------------------------------------- ELEV0008-001 01/01/2021 Rates Fringes ELEVATOR MECHANIC................$ 72.10 35.825+a+b FOOTNOTE: a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0003-008 07/20/2020 Rates Fringes Dredging: (DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING:) AREA 1: (1) Leverman...............$ 49.88 34.35 (2) Dredge Dozer; Heavy duty repairman.............$ 44.92 34.35 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 43.80 34.35 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 40.50 34.35 AREA 2: (1) Leverman...............$ 51.88 34.35 (2) Dredge Dozer; Heavy duty repairman.............$ 46.92 34.35 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 45.80 34.35 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 42.50 34.35 AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern part 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 12/44 COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY: Area 1: Remainder Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY: Area 1: Except Eastern part Area 2: Eastern part MARIPOSA COUNTY Area 1: Except Eastern part Area 2: Eastern part MONTERREY COUNTY Area 1: Except Southwestern part Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: Al but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Remainder TEHAMA COUNTY: Area 1: All but the Western border with Mendocino & Trinity 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 13/44 Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder TUOLUMNE COUNTY: Area 1: Except Eastern part Area 2: Eastern part ---------------------------------------------------------------- ENGI0003-019 06/29/2020 SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1.....................$ 39.95 30.28 AREA 2.....................$ 41.95 30.28 GROUP 2 AREA 1.....................$ 36.35 30.28 AREA 2.....................$ 38.35 30.28 GROUP 3 AREA 1.....................$ 31.74 30.28 AREA 2.....................$ 33.74 30.28 GROUP DESCRIPTIONS: GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP. GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP. GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP. AREA DESCRIPTIONS: AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2 - MODOC COUNTY THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 14/44 CALAVERAS COUNTY: Area 1: Except Eastern part Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder DEL NORTE COUNTY: Area 1: Extreme Southwestern corner Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY Area 1: Except Eastern part Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder HUMBOLDT COUNTY: Area 1: Except Eastern and Southwestern parts Area 2: Remainder LAKE COUNTY: Area 1: Southern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY Area 1: Remainder Area 2: Eastern part MARIPOSA COUNTY Area 1: Remainder Area 2: Eastern part MENDOCINO COUNTY: Area 1: Central and Southeastern parts Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 15/44 Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Reaminder TEHAMA COUNTY: Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder TULARE COUNTY; Area 1: Remainder Area 2: Eastern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- ENGI0003-038 06/29/2020 ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DEFINITIONS BELOW Rates Fringes OPERATOR: Power Equipment (AREA 1:) GROUP 1.....................$ 51.42 31.15 GROUP 2.....................$ 49.89 31.15 GROUP 3.....................$ 48.41 31.15 GROUP 4.....................$ 47.03 31.15 GROUP 5.....................$ 45.76 31.15 GROUP 6.....................$ 44.44 31.15 GROUP 7.....................$ 43.30 31.15 GROUP 8.....................$ 42.16 31.15 GROUP 8-A...................$ 39.95 31.15 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.....................$ 52.30 31.15 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 16/44 Oiler......................$ 43.79 31.15 Truck crane oiler..........$ 46.08 31.15 GROUP 2 Cranes.....................$ 50.54 31.15 Oiler......................$ 42.83 31.15 Truck crane oiler..........$ 45.07 31.15 GROUP 3 Cranes.....................$ 48.80 31.15 Hydraulic..................$ 44.44 31.15 Oiler......................$ 42.55 31.15 Truck crane oiler..........$ 44.83 31.15 GROUP 4 Cranes.....................$ 45.76 31.15 OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices............$ 52.64 31.15 Oiler......................$ 43.38 31.15 Truck Crane Oiler..........$ 45.66 31.15 GROUP 2 Lifting devices............$ 50.82 31.15 Oiler......................$ 43.11 31.15 Truck Crane Oiler..........$ 45.41 31.15 GROUP 3 Lifting devices............$ 49.14 31.15 Oiler......................$ 42.89 31.15 Truck Crane Oiler..........$ 45.12 31.15 GROUP 4 Lifting devices............$ 47.37 31.15 GROUP 5 Lifting devices............$ 44.73 31.15 GROUP 6 Lifting devices............$ 42.50 31.15 OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes.....................$ 53.27 31.15 Oiler......................$ 43.72 31.15 Truck Crane Oiler..........$ 45.95 31.15 GROUP 2 Cranes.....................$ 51.50 31.15 Oiler......................$ 43.45 31.15 Truck Crane Oiler..........$ 45.73 31.15 GROUP 3 Cranes.....................$ 50.02 31.15 Hydraulic..................$ 45.07 31.15 Oiler......................$ 43.23 31.15 Truck Crane Oiler..........$ 45.46 31.15 GROUP 4 Cranes.....................$ 48.00 31.15 GROUP 5 Cranes.....................$ 46.70 31.15 OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1....................$ 47.52 31.15 GROUP 1-A..................$ 49.99 31.15 GROUP 2....................$ 46.26 31.15 GROUP 3....................$ 44.93 31.15 GROUP 4....................$ 43.79 31.15 GROUP 5....................$ 42.65 31.15 UNDERGROUND: GROUP 1....................$ 47.42 31.15 GROUP 1-A..................$ 49.89 31.15 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 17/44 GROUP 2....................$ 46.16 31.15 GROUP 3....................$ 44.83 31.15 GROUP 4....................$ 43.69 31.15 GROUP 5....................$ 42.55 31.15 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 18/44 (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 19/44 ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- PILEDRIVERS GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer GROUP 6: Deckhand; Fire tender ------------------------------------------------------------- STEEL ERECTORS GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 20/44 GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder GROUP 5: Boom cat -------------------------------------------------------------- -- TUNNEL AND UNDERGROUND WORK GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator GROUP 3: Drill doctor; Mine or shaft hoist GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO AREA 2 -NOTED BELOW THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: DEL NORTE COUNTY: Area 1: Extreme Southwest corner Area 2: Remainder HUMBOLDT COUNTY: Area 1: Except Eastern and Southwestern parts Area 2: Remainder LAKE COUNTY: Area 1: Southern part Area 2: Remainder MENDOCINO COUNTY: Area 1: Central and Southeastern Parts Area 2: Remainder ---------------------------------------------------------------- IRON0433-006 07/01/2020 Rates Fringes 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 21/44 IRONWORKER Fence Erector...............$ 34.58 24.81 Ornamental, Reinforcing and Structural..............$ 41.00 33.45 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-001 06/29/2020 AREA ""A"" - MARIN COUNTY AREA ""B"" - ALPINE, AMADOR, BUTTE COLUSA EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES Rates Fringes Asbestos Removal Laborer.........$ 25.05 12.00 LABORER (Lead Removal) Marin County................$ 33.07 25.30 Remaining Counties..........$ 32.07 25.30 ---------------------------------------------------------------- LABO0067-005 06/27/2017 AREA ""A"" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES AREA ""B"" - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NAPA, NEVADA, PLACER, PLUMAS, SANCREMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, SOLANO, SONOMA, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO AND YOUBA COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 22/44 Area A.....................$ 29.54 22.17 Area B.....................$ 28.54 22.17 Traffic Control Person I Area A.....................$ 29.84 22.17 Area B.....................$ 28.84 22.17 Traffic Control Person II Area A.....................$ 27.34 22.17 Area B.....................$ 26.34 22.17 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0185-002 07/01/2020 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 32.84 23.71 ---------------------------------------------------------------- LABO0185-005 06/25/2018 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 23/44 GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0185-006 06/25/2018 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 30.01 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 24/44 and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 25/44 thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 26/44 GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0185-008 07/01/2018 Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-002 06/25/2018 MARIN COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 30.54 23.65 Traffic Control Person I....$ 30.84 23.65 Traffic Control Person II...$ 28.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0261-004 06/25/2018 MARIN COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 27/44 setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0261-007 07/01/2018 MARIN AND NAPA COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 32.45 22.20 ---------------------------------------------------------------- LABO0261-010 06/25/2018 MARIN COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 28/44 CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 29/44 employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 30/44 GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0261-015 07/01/2018 Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-004 06/25/2018 NAPA, SOLANO, AND SONOMA, COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 29.54 23.65 Traffic Control Person I....$ 29.84 23.65 Traffic Control Person II...$ 27.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0324-008 06/25/2018 NAPA, SOLANO, AND SONOMA COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 31/44 GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0324-010 07/01/2018 SOLANO AND SONOMA COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 31.45 22.20 ---------------------------------------------------------------- LABO0324-013 06/25/2018 NAPA, SOLANO, AND SONOMA COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 29.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 32/44 scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 33/44 diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 34/44 and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0324-019 07/01/2018 Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-004 01/01/2021 MARIN, NAPA, SOLANO & SONOMA COUNTIES Rates Fringes Painters:........................$ 45.22 25.48 PREMIUMS: EXOTIC MATERIALS - $1.25 additional per hour. SPRAY WORK: - $0.50 additional per hour. INDUSTRIAL PAINTING - $0.25 additional per hour [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK: over 50 feet - $2.00 per hour additional 100 to 180 feet - $4.00 per hour additional Over 180 feet - $6.00 per houir additional ---------------------------------------------------------------- PAIN0016-005 01/01/2021 ALPINE, BUTTE, COLUSA, EL DORADO (west of the Sierra Nevada Mountains), GLENN, LASSEN (west of Hwy. 395, excluding Honey Lake); MARIN, MODOC, NAPA, NEVADA (west of the Sierra Nevada Mountains), PLACER (west of the Sierra Nevada Mountains), PLUMAS, SACRAMENTO, SHASTA, SIERRA (west of the Sierra Nevada Mountains), SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 35/44 Rates Fringes DRYWALL FINISHER/TAPER...........$ 49.03 27.09 ---------------------------------------------------------------- PAIN0016-007 01/01/2021 ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO (west of the Sierra Nevada Mountains), GLENN, LASSEN (west of Highway 395, excluding Honey Lake), MODOC, NEVADA (west of the Sierra Nevada Mountains), PLACER (west of the Sierra Nevada Mountains), PLUMAS, SACRAMENTO, SHASTA, SIERRA (west of the Sierra Nevada Mountains), SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES Rates Fringes Painters:........................$ 35.88 21.16 SPRAY/SANDBLAST: $0.50 additional per hour. EXOTIC MATERIALS: $1.25 additional per hour. HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour. ---------------------------------------------------------------- PAIN0016-008 01/01/2019 MARIN, NAPA, SOLANO AND SONOMA COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 48.60 27.43 ---------------------------------------------------------------- PAIN0169-004 01/01/2021 MARIN , NAPA & SONOMA COUNTIES; SOLANO COUNTY (west of a line defined as follows: Hwy. 80 corridor beginning at the City of Fairfield, including Travis Air Force Base and Suisun City; going north of Manakas Corner Rd., continue north on Suisun Valley Rd. to the Napa County line; Hwy. 80 corridor south on Grizzly Island Rd. to the Grizzly Island Management area) Rates Fringes GLAZIER..........................$ 53.07 31.15 ---------------------------------------------------------------- * PAIN0567-001 07/01/2020 EL DORADO COUNTY (east of the Sierra Nevada Mountains); LASSEN COUNTY (east of Highway 395, beginning at Stacey and including Honey Lake); NEVADA COUNTY (east of the Sierra Nevada Mountains); PLACER COUNTY (east of the Sierra Nevada Mountains); AND SIERRA COUNTY (east of the Sierra Nevada Mountains) Rates Fringes Painters: Brush and Roller............$ 29.80 13.44 Spray Painter & Paperhanger.$ 31.29 13.44 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 36/44 PREMIUMS: Special Coatings (Brush), and Sandblasting = $0.50/hr Special Coatings (Spray), and Steeplejack = $1.00/hr Special Coating Spray Steel = $1.25/hr Swing Stage = $2.00/hr *A special coating is a coating that requires the mixing of 2 or more products. ---------------------------------------------------------------- PAIN0567-007 07/01/2020 EL DORADO COUNTY (east of the Sierra Nevada Mountains); LASSEN COUNTY (east of Highway 395, beginning at Stacey and including Honey Lake); NEVADA COUNTY (east of the Sierra Nevada Mountains); PLACER COUNTY (east of the Sierra Nevada Mountains) AND SIERRA COUNTY (east of the Sierra Nevada Mountains) Rates Fringes SOFT FLOOR LAYER.................$ 31.01 15.48 ---------------------------------------------------------------- PAIN0567-010 07/01/2020 EL DORADO COUNTY (east of the Sierra Nevada Mountains); LASSEN COUNTY (east of Highway 395, beginning at Stacey and including Honey Lake); NEVADA COUNTY (east of the Sierra Nevada Mountains); PLACER COUNTY (east of the Sierra Nevada Mountains); AND SIERRA COUNTY (east of the Sierra Nevada Mountains) Rates Fringes Drywall (1) Taper...................$ 35.20 14.02 (2) Steeplejack - Taper, over 40 ft with open space below.......................$ 36.70 14.02 ---------------------------------------------------------------- PAIN0767-004 01/01/2021 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO (Remainder), SUTTER, TEHAMA, TRINITY, YOLO, YUBA Rates Fringes GLAZIER..........................$ 41.51 31.36 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation. ---------------------------------------------------------------- PAIN1176-001 07/01/2020 HIGHWAY IMPR0VEMENT 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 37/44 Rates Fringes Parking Lot Striping/Highway Marking: GROUP 1.....................$ 38.48 16.88 GROUP 2.....................$ 32.71 16.88 GROUP 3.....................$ 33.09 16.88 CLASSIFICATIONS GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings GROUP 2: Gamecourt & Playground Installer GROUP 3: Protective Coating, Pavement Sealing ---------------------------------------------------------------- PAIN1237-001 01/01/2021 ALPINE; COLUSA; EL DORADO (west of the Sierra Nevada Mountains); GLENN; LASSEN (west of Highway 395, beginning at Stacey and including Honey Lake); MODOC; NEVADA (west of the Sierra Nevada Mountains); PLACER (west of the Sierra Nevada Mountains); PLUMAS; SACRAMENTO; SHASTA; SIERRA (west of the Sierra Nevada Mountains); SISKIYOU; SUTTER; TEHAMA; TRINITY; YOLO AND YUBA COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 41.81 23.39 ---------------------------------------------------------------- PLAS0300-003 07/01/2018 Rates Fringes PLASTERER AREA 295: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sutter, Tehema, Trinity, Yolo & Yuba Counties........$ 32.70 31.68 AREA 355: Marin.............$ 36.73 31.68 AREA 355: Napa & Sonoma Counties....................$ 32.70 31.68 ---------------------------------------------------------------- PLAS0300-005 07/01/2017 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 33.49 23.67 ---------------------------------------------------------------- PLUM0038-002 07/01/2020 MARIN AND SONOMA COUNTIES Rates Fringes PLUMBER (Plumber, Steamfitter, Refrigeration 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 38/44 Fitter) (1) Work on wooden frame structures 5 stories or less excluding high-rise buildings and commercial work such as hospitals, prisons, hotels, schools, casinos, wastewater treatment plants, and resarch facilities as well as refrigeration pipefitting, service and repair work - MARKET RECOVERY RATE...............$ 64.86 43.54 (2) All other work - NEW CONSTRUCTION RATE...........$ 76.30 45.27 ---------------------------------------------------------------- PLUM0038-006 07/01/2019 MARIN & SONOMA COUNTIES Rates Fringes Landscape/Irrigation Fitter (Underground/Utility Fitter).....$ 63.04 31.48 ---------------------------------------------------------------- PLUM0228-001 01/01/2021 BUTTE, COLUSA, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY & YUBA COUNTIES Rates Fringes PLUMBER..........................$ 42.00 35.14 ---------------------------------------------------------------- PLUM0343-001 07/01/2020 NAPA AND SOLANO COUNTIES Rates Fringes PLUMBER/PIPEFITTER Light Commercial............$ 30.85 20.40 All Other Work..............$ 54.00 38.74 DEFINITION OF LIGHT COMMERICIAL: Work shall include strip shopping centers, office buildings, schools and other commercial structures which the total plumbing bid does not exceed Two Hundred and Fifty Thousand ($250,000) and the total heating and cooling does not exceed Two Hundred Fifty Thousand ($250,000); or Any projects bid in phases shall not qualify unless the total project is less than Two Hundred Fifty Thousand ($250,000) for the plumbing bid; and Two Hundred Fifty Thousand ($250,000) for the heating and cooling bid. Excluded are hospitals, jails, institutions and industrial projects, regardless size of the project FOOTNOTES: While fitting galvanized material: $.75 per hour additional. Work from trusses, temporary staging, unguarded structures 35' from the ground or water: $.75 per hour additional. Work from swinging scaffolds, boatswains chairs or similar devices: $.75 per hour additional. 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 39/44 ---------------------------------------------------------------- PLUM0350-001 08/01/2019 EL DORADO COUNTY (Lake Tahoe area only); NEVADA COUNTY (Lake Tahoe area only); AND PLACER COUNTY (Lake Tahoe area only) Rates Fringes PLUMBER/PIPEFITTER...............$ 45.84 13.81 ---------------------------------------------------------------- PLUM0355-001 07/01/2020 ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES Rates Fringes Underground Utility Worker /Landscape Fitter...........$ 29.90 16.30 ---------------------------------------------------------------- PLUM0442-003 07/01/2020 AMADOR (South of San Joaquin River) and ALPINE COUNTIES Rates Fringes PLUMBER..........................$ 45.50 31.89 ---------------------------------------------------------------- PLUM0447-001 07/01/2020 AMADOR (north of San Joaquin River), EL DORADO (excluding Lake Tahoe area), NEVADA (excluding Lake Tahoe area); PLACER (excluding Lake Tahoe area), SACRAMENTO AND YOLO COUNTIES Rates Fringes PLUMBER/PIPEFITTER Journeyman..................$ 54.37 25.75 Light Commercial Work.......$ 36.23 17.72 ---------------------------------------------------------------- ROOF0081-006 08/01/2020 MARIN, NAPA, SOLANO AND SONOMA COUNTIES Rates Fringes Roofer...........................$ 44.62 19.36 ---------------------------------------------------------------- ROOF0081-007 08/01/2020 ALPINE, BUTTE, COLUSA, EL DORADO, GLENN,LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES Rates Fringes Roofer...........................$ 39.73 19.11 ---------------------------------------------------------------- SFCA0483-003 01/01/2021 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 40/44 MARIN, NAPA, SOLANO AND SONOMA COUNTIES Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 67.99 32.85 ---------------------------------------------------------------- SFCA0669-003 04/01/2021 ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES Rates Fringes SPRINKLER FITTER.................$ 42.34 26.29 ---------------------------------------------------------------- SHEE0104-006 06/29/2020 MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES Rates Fringes Sheet Metal Worker Mechanical Contracts $200,000 or less............$ 55.92 45.29 All other work..............$ 64.06 46.83 ---------------------------------------------------------------- SHEE0104-009 07/01/2020 AMADOR, COLUSA, EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes SHEET METAL WORKER...............$ 46.60 40.21 ---------------------------------------------------------------- SHEE0104-010 07/01/2020 AlPINE COUNTY Rates Fringes SHEET METAL WORKER...............$ 43.50 37.42 ---------------------------------------------------------------- SHEE0104-011 07/01/2020 BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES Rates Fringes Sheet Metal Worker (Metal decking and siding only).........$ 44.45 35.55 ---------------------------------------------------------------- SHEE0104-014 07/01/2020 MARIN, NAPA, SOLANO, SONOMA AND TRINITY COUNTIES Rates Fringes 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 41/44 SHEET METAL WORKER (Metal Decking and Siding only).........$ 44.45 35.55 ---------------------------------------------------------------- SHEE0104-019 07/01/2020 BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES Rates Fringes SHEET METAL WORKER Mechanical Jobs $200,000 & under.......................$ 35.16 35.88 Mechanical Jobs over $200,000....................$ 46.60 40.21 ---------------------------------------------------------------- TEAM0094-001 07/01/2019 Rates Fringes Truck drivers: GROUP 1.....................$ 32.80 29.19 GROUP 2.....................$ 33.10 29.19 GROUP 3.....................$ 33.40 29.19 GROUP 4.....................$ 33.75 29.19 GROUP 5.....................$ 34.10 29.19 FOOTNOTES: Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson; Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 42/44 Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with self-contained refuse bin; Boom truck - hydro-lift or Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 43/44 order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210007/12 44/44 WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION" 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 1/48 "General Decision Number: CA20210019 06/18/2021 Superseded General Decision Number: CA20200019 State: California Construction Type: Residential Counties: Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo and Yuba Counties in California. RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 01/15/2021 3 01/22/2021 4 02/05/2021 5 02/19/2021 6 02/26/2021 7 03/05/2021 8 04/02/2021 9 04/23/2021 10 05/07/2021 11 05/14/2021 12 06/18/2021 ASBE0016-002 01/01/2021 AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 2/48 SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA COUNTIES Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems) Area 1......................$ 74.16 23.58 Area 2......................$ 46.81 33.50 ---------------------------------------------------------------- ASBE0016-009 01/01/2021 AREA 1: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA COUNTIES AREA 2: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 30.45 10.60 Area 2......................$ 36.53 9.27 ---------------------------------------------------------------- BRCA0003-001 08/01/2020 Rates Fringes MARBLE FINISHER..................$ 36.53 17.08 ---------------------------------------------------------------- BRCA0003-002 05/01/2020 Rates Fringes BRICKLAYER ( 7) Marin, Napa, San Francisco, San Mateo, Solano, Sonoma..............$ 47.65 26.77 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 49.42 22.70 ( 9) El Dorado, Placer, Sacramento, Sutter..........$ 45.12 21.55 (16) Monterey, Santa Cruz...$ 45.88 25.02 SPECIALTY PAY: (A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above. 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 3/48 (B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate. (C) Gunite nozzle person shall receive $1.25 per hour above the regular rate. ---------------------------------------------------------------- BRCA0003-007 07/01/2019 Rates Fringes TERRAZZO FINISHER................$ 37.58 17.33 TERRAZZO WORKER..................$ 48.53 26.84 FOOTNOTE: Base machine operator: $1.00 per hour additional. ---------------------------------------------------------------- BRCA0003-009 08/01/2020 Rates Fringes MARBLE MASON.....................$ 51.30 28.47 ---------------------------------------------------------------- BRCA0003-012 04/01/2019 Rates Fringes TILE FINISHER Alameda, Contra Costa, Marin, Monterey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano................$ 29.94 16.38 El Dorado, Placer, Sacramento, Sutter, Yolo, Yuba........................$ 27.31 14.75 Sonoma......................$ 28.06 15.82 Tile Layer Placer, Sacramento, Sutter, Yolo, Yuba..........$ 45.51 17.64 Alameda, Contra Costa, Marin, Monterrey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano..........$ 49.90 19.16 Sonoma......................$ 46.77 19.08 ---------------------------------------------------------------- CARP0022-001 07/01/2020 San Francisco County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0035-005 08/01/2020 AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 4/48 Mateo, Santa Clara, Solano & Sonoma Counties AREA 2: Monterey, San Benito & Santa Cruz Counties AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties Rates Fringes Drywall Installers/Lathers: Area 1......................$ 52.65 31.26 Area 2......................$ 46.77 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 2......................$ 23.39 18.22 Area 4......................$ 22.97 18.22 ---------------------------------------------------------------- CARP0035-009 07/01/2020 Marin County Rates Fringes CARPENTER Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0046-001 07/01/2020 El Dorado (West), Placer (West), Sacramento and Yolo Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville. ---------------------------------------------------------------- CARP0046-003 07/01/2020 El Dorado (East), Placer (East), Sutter and Yuba Counties Rates Fringes 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 5/48 Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 44.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- CARP0152-001 07/01/2020 Contra Costa County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0180-001 07/01/2020 Solano County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0217-001 07/01/2020 San Mateo County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0405-001 07/01/2020 Santa Clara County 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 6/48 Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0405-002 07/01/2020 San Benito County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 ---------------------------------------------------------------- CARP0505-001 07/01/2020 Santa Cruz County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 ---------------------------------------------------------------- CARP0605-001 07/01/2020 Monterey County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 ---------------------------------------------------------------- 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 7/48 CARP0713-001 07/01/2020 Alameda County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0751-001 07/01/2020 Napa and Sonoma Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- ELEC0006-003 12/01/2020 SAN FRANCISCO COUNTY Rates Fringes Sound & Communications Installer...................$ 46.00 3%+21.65 Technician..................$ 52.90 3%+21.65 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0006-005 06/01/2020 SAN FRANCISCO COUNTY Rates Fringes 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 8/48 ELECTRICIAN......................$ 46.80 3%+17.88 Work on residential wood frame remodel and repair in all wood-constructed buildings not to exceed 24 living units; and new wood frame single structure 1 or 2 family houses, or on all wood- constructed buildings not to exceed 20 living units under 1 roof excluding projects or tracts containing more than 2 houses, or more than 1 building ---------------------------------------------------------------- * ELEC0006-009 06/01/2021 SAN FRANCISCO COUNTY: Rates Fringes ELECTRICIAN All other work..............$ 80.00 3%+39.215 ---------------------------------------------------------------- ELEC0180-002 12/01/2019 NAPA & SOLANO COUNTIES Rates Fringes ELECTRICIAN......................$ 33.00 3%+14.65 ---------------------------------------------------------------- ELEC0234-002 12/28/2020 MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES: Rates Fringes ELECTRICIAN Zone A......................$ 53.41 27.95 Zone B......................$ 58.75 28.11 Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line Zone B: Any area outside of Zone A ---------------------------------------------------------------- ELEC0234-004 12/01/2020 MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES Rates Fringes Sound & Communications Installer...................$ 45.50 22.52 Technician..................$ 52.33 22.72 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 9/48 buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0302-002 03/01/2021 CONTRA COSTA COUNTY Rates Fringes CABLE SPLICER....................$ 63.86 29.17 ELECTRICIAN......................$ 56.76 28.95 ---------------------------------------------------------------- ELEC0302-004 12/01/2020 CONTRA COSTA COUNTY Rates Fringes Sound & Communications Installer...................$ 42.11 22.52 Technician..................$ 44.83 22.72 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0332-002 12/01/2020 SANTA CLARA COUNTY Rates Fringes ELECTRICIAN......................$ 37.75 18.453 ---------------------------------------------------------------- ELEC0332-004 12/01/2020 SANTA CLARA COUNTY Rates Fringes Sound & Communications Installer...................$ 45.50 22.515 Technician..................$ 52.33 22.72 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 10/48 jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0340-001 02/01/2016 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes ELECTRICIAN Four stories................$ 39.06 24.51 Work on single family homes and apartments up to and including 3 stories.....$ 23.10 12.48 ---------------------------------------------------------------- ELEC0340-004 02/01/2018 COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Sound & Communications Installer...................$ 29.35 3%+15.35 Technician..................$ 33.75 3%+15.35 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0401-006 01/01/2021 EL DORADO AND PLACER COUNTIES Rates Fringes ELECTRICIAN......................$ 31.88 3%+7.50 ZONE PAY: Zone 1 - 0 to 70 miles $0.00 Per Hour Zone 2 - 70 to 90 miles $5.00 Per Hour Zone 3 - 91 miles and over $7.00 Per Hour ---------------------------------------------------------------- ELEC0551-003 12/01/2020 MARIN AND SONOMA COUNTIES: Rates Fringes ELECTRICIAN......................$ 34.00 3%+15.25 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 11/48 ---------------------------------------------------------------- ELEC0595-004 06/01/2020 ALAMEDA COUNTY Rates Fringes CABLE SPLICER....................$ 69.00 3%+38.52 ELECTRICIAN......................$ 60.00 3%+38.52 ---------------------------------------------------------------- ELEC0595-007 12/01/2020 ALAMEDA COUNTY Rates Fringes Sound & Communications Installer...................$ 45.50 3%+21.15 Technician..................$ 52.33 3%+21.15 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. ---------------------------------------------------------------- ELEC0617-002 06/01/2020 SAN MATEO COUNTY Rates Fringes ELECTRICIAN......................$ 66.00 39.77 ---------------------------------------------------------------- ELEV0008-001 01/01/2021 Rates Fringes ELEVATOR MECHANIC................$ 72.10 35.825+a+b FOOTNOTE: a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0003-009 06/29/2020 EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 12/48 ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (AREA 1:) GROUP 1.....................$ 51.42 31.15 GROUP 2.....................$ 49.89 31.15 GROUP 3.....................$ 48.41 31.15 GROUP 4.....................$ 47.03 31.15 GROUP 5.....................$ 45.76 31.15 GROUP 6.....................$ 44.44 31.15 GROUP 7.....................$ 43.30 31.15 GROUP 8.....................$ 42.16 31.15 GROUP 8-A...................$ 39.95 31.15 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.....................$ 52.30 31.15 Oiler......................$ 43.79 31.15 Truck crane oiler..........$ 46.08 31.15 GROUP 2 Cranes.....................$ 50.54 31.15 Oiler......................$ 42.83 31.15 Truck crane oiler..........$ 45.07 31.15 GROUP 3 Cranes.....................$ 48.80 31.15 Hydraulic..................$ 44.44 31.15 Oiler......................$ 42.55 31.15 Truck crane oiler..........$ 44.83 31.15 GROUP 4 Cranes.....................$ 45.76 31.15 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 13/48 GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 14/48 asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 15/48 ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Reaminder TEHAMA COUNTY: Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder TULARE COUNTY; Area 1: Remainder Area 2: Eastern part ---------------------------------------------------------------- ENGI0003-010 06/26/2017 ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 16/48 (AREA 1:) GROUP 1.....................$ 43.25 30.39 GROUP 2.....................$ 41.80 30.39 GROUP 3.....................$ 40.40 30.39 GROUP 4.....................$ 39.07 30.39 GROUP 5.....................$ 37.86 30.39 GROUP 6.....................$ 36.59 30.39 GROUP 7.....................$ 35.50 30.39 GROUP 8.....................$ 34.00 30.39 GROUP 8-A...................$ 32.30 30.39 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.....................$ 44.85 28.03 Oiler......................$ 35.59 28.03 Truck crane oiler..........$ 38.05 28.03 GROUP 2 Cranes.....................$ 42.41 28.03 Oiler......................$ 35.34 28.03 Truck crane oiler..........$ 37.83 28.03 GROUP 3 Cranes.....................$ 40.77 28.03 Hydraulic..................$ 37.20 28.03 Oiler......................$ 35.11 28.03 Truck crane oiler..........$ 37.58 28.03 GROUP 4 Cranes.....................$ 37.86 28.03 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 17/48 or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 18/48 Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 19/48 PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder ---------------------------------------------------------------- ENGI0003-011 06/29/2020 SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1.....................$ 39.95 30.28 AREA 2.....................$ 41.95 30.28 GROUP 2 AREA 1.....................$ 36.35 30.28 AREA 2.....................$ 38.35 30.28 GROUP 3 AREA 1.....................$ 31.74 30.28 AREA 2.....................$ 33.74 30.28 GROUP DESCRIPTIONS: GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP. GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP. GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP. AREA DESCRIPTIONS: AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 20/48 ---------------------------------------------------------------- IRON0377-001 07/01/2020 ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA & SAN FRANCISCO COUNTIES Rates Fringes Ironworkers: Fence Erector...............$ 34.58 24.81 Ornamental, Reinforcing and Structural..............$ 42.50 33.45 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0433-005 07/01/2020 REMAINING COUNTIES Rates Fringes IRONWORKER Fence Erector...............$ 34.58 24.81 Ornamental, Reinforcing and Structural..............$ 41.00 33.45 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 21/48 $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-004 06/29/2020 ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN FRANCISCO,SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES: Rates Fringes Asbestos Removal Laborer.........$ 25.05 12.00 SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations. ---------------------------------------------------------------- LABO0185-001 06/25/2018 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Laborers: (CONSTRUCTION CRAFT LABORERS) Construction Specialist.....$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 Laborers: (GUNITE) GROUP 1.....................$ 28.35 18.66 GROUP 2.....................$ 27.85 18.66 GROUP 3.....................$ 27.26 18.66 GROUP 4.....................$ 27.14 18.66 Laborers: (WRECKING) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) Establishment Warranty Period......................$ 23.23 23.20 New Construction............$ 29.54 23.20 FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional. 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 22/48 LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 23/48 GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". GUNITE LABORER CLASSIFICATION GROUP 1: Structural nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 24/48 GROUP 3: Reboundman GROUP 4: Gunite laborer WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0185-003 07/01/2020 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 32.84 23.71 ---------------------------------------------------------------- LABO0185-007 07/01/2018 EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-001 06/25/2018 MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES Rates Fringes Laborers: (CONSTRUCTION CRAFT LABORERS) Construction Specialist.....$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. Laborers: (GUNITE) GROUP 1.....................$ 29.35 18.66 GROUP 2.....................$ 28.85 18.66 GROUP 3.....................$ 28.26 18.66 GROUP 4.....................$ 28.14 18.66 Laborers: (WRECKING) GROUP 1.....................$ 28.39 23.20 GROUP 2.....................$ 30.64 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) Establishment Warranty Period......................$ 24.34 23.20 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 25/48 New Construction............$ 30.54 23.20 FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional. LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 26/48 diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 27/48 erection"". GUNITE LABORER CLASSIFICATION GROUP 1: Structural nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0261-008 07/01/2018 NAPA AND MARIN COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 32.45 22.20 ---------------------------------------------------------------- LABO0261-011 05/01/2018 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes MASON TENDER, BRICK..............$ 35.37 20.70 FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage: $2.50 per day additional. ---------------------------------------------------------------- LABO0261-012 07/01/2018 EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-013 07/01/2017 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes PLASTER TENDER...................$ 34.70 23.11 Work on a swing stage scaffold: $1.00 per hour additional. 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 28/48 ---------------------------------------------------------------- LABO0270-001 06/25/2018 AREA ""A"" - SANTA CLARA COUNTY AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES Rates Fringes Laborers: (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist.....$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. Laborers: (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 Construction Specialist.....$ 26.84 15.82 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 Laborers: (GUNITE - AREA A:) GROUP 1.....................$ 29.35 18.66 GROUP 2.....................$ 28.85 18.66 GROUP 3.....................$ 28.26 18.66 GROUP 4.....................$ 28.14 18.66 Laborers: (GUNITE - AREA B:) GROUP 1.....................$ 28.35 18.66 GROUP 2.....................$ 27.85 18.66 GROUP 3.....................$ 27.26 18.66 GROUP 4.....................$ 27.14 18.66 Laborers: (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 Laborers: (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) Establishment Warranty Period......................$ 24.23 23.20 New Construction............$ 30.54 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) Establishment Warranty Period......................$ 23.23 23.20 New Construction............$ 29.54 23.20 FOOTNOTE: Laborers working off or with or from bos'n chairs, 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 29/48 swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional. LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 30/48 rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". GUNITE LABORER CLASSIFICATION 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 31/48 GROUP 1: Structural nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0270-002 07/01/2020 SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes MASON TENDER, BRICK Santa Clara County..........$ 31.54 24.86 Santa Cruz County...........$ 31.54 24.86 ---------------------------------------------------------------- LABO0270-006 07/01/2020 MONTEREY AND SAN BENITO COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 32.84 23.71 ---------------------------------------------------------------- LABO0270-008 07/01/2017 SANTA CLARA & SANTA CRUZ Rates Fringes PLASTER TENDER...................$ 34.70 21.22 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-009 07/01/2017 MONTEREY AND SAN BENITO COUNTIES: Rates Fringes Plasterer tender.................$ 34.70 21.22 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-001 06/25/2018 ALAMEDA COUNTY Rates Fringes Laborers: (CONSTRUCTION CRAFT LABORERS) 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 32/48 Construction Specialist.....$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. Laborers: (GUNITE) GROUP 1.....................$ 29.35 18.66 GROUP 2.....................$ 28.85 18.66 GROUP 3.....................$ 28.26 18.66 GROUP 4.....................$ 28.14 18.66 Laborers: (WRECKING) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) Establishment Warranty Period......................$ 24.23 23.20 New Construction............$ 30.54 23.20 FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional. LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 33/48 Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 34/48 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". GUNITE LABORER CLASSIFICATION GROUP 1: Structural nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0304-006 05/01/2018 ALAMEDA COUNTY Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-007 07/01/2017 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 34.70 23.11 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 35/48 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-001 06/25/2018 AREA ""A"" - CONTRA COSTA COUNTY AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES Rates Fringes Laborers: (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist.....$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 1-g (Contra Costa County).....................$ 30.99 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. Laborers: (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist.....$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 Laborers: (GUNITE - AREA A:) GROUP 1.....................$ 29.35 18.66 GROUP 2.....................$ 28.85 18.66 GROUP 3.....................$ 28.26 18.66 GROUP 4.....................$ 28.14 18.66 Laborers: (GUNITE - AREA B:) GROUP 1.....................$ 28.35 18.66 GROUP 2.....................$ 27.85 18.66 GROUP 3.....................$ 27.26 18.66 GROUP 4.....................$ 27.14 18.66 Laborers: (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 Laborers: (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) Establishment Warranty Period......................$ 24.23 23.20 New Construction............$ 30.54 23.20 Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) Establishment Warranty Period......................$ 23.23 23.20 New Construction............$ 29.54 23.20 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 36/48 FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a): $0.25 per hour additional. LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 37/48 manholes, shall receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 1 g: CONTRA COSTA COUNTY: Pipelayer (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; ?ressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole from setters GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 38/48 salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". GUNITE LABORER CLASSIFICATION GROUP 1: Structural nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0324-011 07/01/2018 SOLANO AND SONOMA COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 31.45 22.20 FOOTNOTE: Refractory work where heat-protective clothing is required: $2.00 per hour additional. ---------------------------------------------------------------- LABO0324-015 05/01/2018 CONTRA COSTA COUNTY Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-017 07/01/2018 EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-002 01/01/2021 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 39/48 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Painters: Brush.......................$ 35.88 21.16 SPRAY/SANDBLAST: $0.50 additional per hour. EXOTIC MATERIALS: $1.25 additional per hour. HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour. ---------------------------------------------------------------- PAIN0016-009 01/01/2019 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 48.60 27.43 ---------------------------------------------------------------- PAIN0016-011 01/01/2021 AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES Rates Fringes Drywall Finisher/Taper AREA 1......................$ 53.16 28.49 AREA 2......................$ 49.03 27.09 ---------------------------------------------------------------- PAIN0016-013 01/01/2021 ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES Rates Fringes PAINTER..........................$ 45.22 25.48 FOOTNOTES: Spray Work: $0.50 additional per hour. Exotic Materials: $1.25 additional per hour ---------------------------------------------------------------- PAIN0016-019 01/01/2021 SAN FRANCISCO COUNTY Rates Fringes PAINTER..........................$ 48.84 25.48 ---------------------------------------------------------------- PAIN0169-006 01/01/2021 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 40/48 ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;and SOLANO COUNTY (west of a line defined as follows: Hwy. 80 corridor beginning at the City of Fairfield, including Travis Air Force Base and Suisun City; going north of Manakas Corner Rd., continue north on Suisun Valley Rd. to the Napa County line; Hwy. 80 corridor south on Grizzly Island Rd. to the Grizzly Island Management area): Rates Fringes GLAZIER..........................$ 53.07 31.15 ---------------------------------------------------------------- * PAIN0567-002 07/01/2020 EL DORADO AND PLACER COUNTIES Rates Fringes PAINTER Brush and Roller............$ 29.80 13.44 Spray Painter & Paper Hanger......................$ 31.29 13.44 PREMIUMS: Spray & Paperhanger = $0.85/hr Special Coatings (Brush), & Sandblast = $0.50/hr Special Coatings (Spray), & Steeplejack = $1.00/hr Swing Stage = $2.00/hr *A special coating is a coating that requires the mixing of 2 or more products. ---------------------------------------------------------------- PAIN0567-008 07/01/2020 EL DORADO AND PLACER COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 31.01 15.48 ---------------------------------------------------------------- PAIN0567-011 07/01/2020 EL DORADO AND PLACER COUNTIES Rates Fringes DRYWALL FINISHER/TAPER...........$ 35.20 14.02 STEEPLEJACK-Drywall Finisher over 40 ft with open space below: $1.50 additional per hour. ---------------------------------------------------------------- PAIN0767-002 01/01/2021 EL DORADO, PLACER, SACRAMENTO, SOLANO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes GLAZIER..........................$ 41.51 31.36 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 41/48 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day and Christmas Day. FOOTNOTE: Employee required to wear a body harness shall receive $1.50 above the basic hourly rate at any elevation. ---------------------------------------------------------------- PAIN1176-001 07/01/2020 HIGHWAY IMPR0VEMENT Rates Fringes Parking Lot Striping/Highway Marking: GROUP 1.....................$ 38.48 16.88 GROUP 2.....................$ 32.71 16.88 GROUP 3.....................$ 33.09 16.88 CLASSIFICATIONS GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings GROUP 2: Gamecourt & Playground Installer GROUP 3: Protective Coating, Pavement Sealing ---------------------------------------------------------------- PAIN1237-002 01/01/2021 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 41.81 23.39 ---------------------------------------------------------------- PLAS0066-001 07/01/2019 ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes PLASTERER........................$ 42.41 30.73 ---------------------------------------------------------------- PLAS0300-002 07/01/2018 Rates Fringes PLASTERER AREA 224: San Benito, Santa Clara & Santa Cruz Counties....................$ 32.88 31.68 AREA 295: El Dorado, Napa, Placer, Sacramento, Solano, Sonoma, Sutter, Yolo & Yuba Counties........$ 32.70 31.68 AREA 337: Monterey County...$ 32.88 31.68 AREA 355: Marin County......$ 36.73 31.68 ---------------------------------------------------------------- PLAS0300-005 07/01/2017 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 42/48 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 33.49 23.67 ---------------------------------------------------------------- PLUM0038-003 07/01/2020 MARIN, SAN FRANCISCO & SONOMA COUNTIES Rates Fringes PLUMBER (Plumber, Steamfitter, Refrigeration Fitter) (1) Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties.....$ 76.30 45.27 (2) New Construction in San Francisco County........$ 76.30 45.27 ---------------------------------------------------------------- PLUM0038-007 07/01/2020 MARIN, SAN FRANCISCO & SONOMA COUNTIES Rates Fringes Landscape/Irrigation Fitter (Underground/Utility Fitter).....$ 64.86 31.74 ---------------------------------------------------------------- PLUM0062-001 01/01/2021 MONTEREY AND SANTA CRUZ COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 45.50 37.05 ---------------------------------------------------------------- PLUM0159-002 07/01/2018 CONTRA COSTA COUNTY Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 39.67 16.44 ---------------------------------------------------------------- PLUM0342-002 07/01/2020 ALAMEDA COUNTY Rates Fringes PLUMBER & STEAMFITTER............$ 67.75 42.50 ---------------------------------------------------------------- PLUM0343-002 07/01/2018 NAPA AND SOLANO COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 30.85 20.40 FOOTNOTES: Work from trusses, temporary staging, unguarded structures 35' from the ground or water: $.75 per hour additional. Work from swinging scaffolds, boatswains chairs 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 43/48 or similar devices: $.75 per hour additional. ---------------------------------------------------------------- PLUM0350-002 08/01/2019 EL DORADO AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY) Rates Fringes Plumbers and Pipefitters.........$ 45.84 13.81 ---------------------------------------------------------------- PLUM0355-002 07/01/2020 ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes Underground Utility Worker /Landscape Fitter...........$ 29.90 16.30 ---------------------------------------------------------------- PLUM0393-002 09/01/2013 SAN BENITO & SANTA CLARA COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 30.90 7.90 ---------------------------------------------------------------- PLUM0442-004 07/01/2020 SUTTER AND YUBA COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 45.50 31.89 ---------------------------------------------------------------- PLUM0447-003 07/01/2016 EL DORADO,PLACER, SACRAMENTO AND YOLO COUNTIES: Rates Fringes Plumbers and Pipefitters.........$ 36.23 17.72 ---------------------------------------------------------------- PLUM0467-001 07/01/2020 SAN MATEO COUNTY Rates Fringes Plumber/Pipefitter/Steamfitter...$ 70.00 37.86 ---------------------------------------------------------------- ROOF0040-001 08/01/2020 SAN FRANCISCO & SAN MATEO COUNTIES: Rates Fringes ROOFER...........................$ 44.38 19.69 ---------------------------------------------------------------- ROOF0081-003 08/01/2020 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 44/48 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES: Rates Fringes ROOFER...........................$ 44.62 19.36 ---------------------------------------------------------------- ROOF0081-005 08/01/2020 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes ROOFER...........................$ 39.73 19.11 ---------------------------------------------------------------- ROOF0095-001 08/01/2020 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes ROOFER Journeyman..................$ 46.54 20.69 Kettle person (2 kettles); Bitumastic, Enameler, Coal Tar, Pitch and Mastic worker......................$ 48.54 20.69 ---------------------------------------------------------------- SFCA0483-002 01/01/2021 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES: Rates Fringes SPRINKLER FITTER.................$ 41.32 14.75 ---------------------------------------------------------------- SFCA0669-006 04/01/2021 MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes SPRINKLER FITTER.................$ 40.36 26.15 ---------------------------------------------------------------- SFCA0669-012 04/01/2021 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes SPRINKLER FITTER.................$ 42.34 26.29 ---------------------------------------------------------------- SHEE0104-002 07/01/2020 AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA AREA 2: MONTEREY & SAN BENITO AREA 3: SANTA CRUZ Rates Fringes 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 45/48 SHEET METAL WORKER AREA 1......................$ 43.18 38.28 AREA 2......................$ 52.90 36.44 AREA 3......................$ 55.16 34.18 ---------------------------------------------------------------- SHEE0104-017 07/01/2020 EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES Rates Fringes SHEET METAL WORKER...............$ 30.29 16.41 ---------------------------------------------------------------- TEAM0094-001 07/01/2019 Rates Fringes Truck drivers: GROUP 1.....................$ 32.80 29.19 GROUP 2.....................$ 33.10 29.19 GROUP 3.....................$ 33.40 29.19 GROUP 4.....................$ 33.75 29.19 GROUP 5.....................$ 34.10 29.19 FOOTNOTES: Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson; Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with self-contained refuse bin; Boom truck - hydro-lift or 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 46/48 Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 47/48 Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: 6/24/2021 SAM.gov https://sam.gov/wage-determination/CA20210019/12 48/48 * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION"