fr_3004_5-23-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
05/23/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Clear/Calm
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
5
47
50
CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am and as crew prepared to head east on Cloverdale.
The Vinciguerra crew (1 operator, Jim and 6 Underground Utility Pipe Fitters, 1 Truck Driver) arrived began to
peel asphalt off of Cloverdale. Approximately 300’ was peeled off and existing utilities were pot holed prior to the
the excavation beginning.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report as well as 1 from Thursday that was back calculated. Although the the specifications call for 95% had
been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction
wheel attached to an excavator was used for compaction efforts.
The crew did expose a 2” steel pipe about 1’ below pavement that appeared to be abandoned,. It was decided
that they could cut it out of the way and continue on. It was located across from 3532 Cloverdale.
A concrete kicker was also placed behind the hydrant valve on the south side of the Fairway and Cloverdale
intersection.
Contractor did backfill approximately 120’ of trench that had been flooded last week. The base in the trench
was solid and native material was placed on top and density testing was performed. The testing was satisfactory
but it remains to be seen if any pipe lengths will need to be removed to get minimum cover.
Departed site 1800 as crew continued clean up.
1
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
) DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR 1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/23/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Clear/Calm
acombes@stpud.us
jryan@stpud.us
5
47
50
08:00
18:00
C 900 DR18 300’
C 900 DR14
Saddles were placed 3520, 3519, 3524, 3531, 3530, 3532 and 1076 Glenwood off the Cloverdale line
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, Fred and Kieth,
underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site.
1
JVL____
Aggregate Base, Native
3519 Cloverdale
Cinderlite Pit, Trench Spoils
1
3
4
5
3’ BFG
2 3’ BFG
1’ BFG
126.9
126.6
111.8
112.9
110.0
6.6
2’ BFG
1’ BFG
7.2
8.4
9.4
9.6
8.2
11.5
11.5
11.5
7.2
132.6
132.6
119.6
119.6
119.6
96
96
93
94
92
95
95
90
90
90
2
3531 Coverdale
3519 Cloverdale
3531 Cloverdale
1079 Fairway ( From Thursdays Trench)
Troxler 3430 37748 08/18/21
Direct
1998
6
6
10
10
10
-
-
-
-
- -
-
-
-
-
10
10
10
6
6
Density
718Moisture
DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/23/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Asphalt being removed from area to be dug today Saddles being placed on pipe prior to placement in trench
Existing utilities being pot holed prior to beginning
excavation
Pipe in trench with gas line above
DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/23/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Using bar to set pipe Kicker being placed behind hydrant valve at approximately
13+54 Fairway
Jumping jack whacker working the base 1’ above pipe Abandoned 2” pipe cut out of way
DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/23/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Compaction wheel working material
DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA