Loading...
fr_3004_5-23-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 05/23/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (8) acombes@stpud.us jryan@stpud.us 5 47 50 CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am and as crew prepared to head east on Cloverdale. The Vinciguerra crew (1 operator, Jim and 6 Underground Utility Pipe Fitters, 1 Truck Driver) arrived began to peel asphalt off of Cloverdale. Approximately 300’ was peeled off and existing utilities were pot holed prior to the the excavation beginning. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report as well as 1 from Thursday that was back calculated. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. The crew did expose a 2” steel pipe about 1’ below pavement that appeared to be abandoned,. It was decided that they could cut it out of the way and continue on. It was located across from 3532 Cloverdale. A concrete kicker was also placed behind the hydrant valve on the south side of the Fairway and Cloverdale intersection. Contractor did backfill approximately 120’ of trench that had been flooded last week. The base in the trench was solid and native material was placed on top and density testing was performed. The testing was satisfactory but it remains to be seen if any pipe lengths will need to be removed to get minimum cover. Departed site 1800 as crew continued clean up. 1 JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 5 47 50 08:00 18:00 C 900 DR18 300’ C 900 DR14 Saddles were placed 3520, 3519, 3524, 3531, 3530, 3532 and 1076 Glenwood off the Cloverdale line The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, Fred and Kieth, underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site. 1 JVL____ Aggregate Base, Native 3519 Cloverdale Cinderlite Pit, Trench Spoils 1 3 4 5 3’ BFG 2 3’ BFG 1’ BFG 126.9 126.6 111.8 112.9 110.0 6.6 2’ BFG 1’ BFG 7.2 8.4 9.4 9.6 8.2 11.5 11.5 11.5 7.2 132.6 132.6 119.6 119.6 119.6 96 96 93 94 92 95 95 90 90 90 2 3531 Coverdale 3519 Cloverdale 3531 Cloverdale 1079 Fairway ( From Thursdays Trench) Troxler 3430 37748 08/18/21 Direct 1998 6 6 10 10 10 - - - - - - - - - - 10 10 10 6 6 Density 718Moisture DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/23/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Asphalt being removed from area to be dug today Saddles being placed on pipe prior to placement in trench Existing utilities being pot holed prior to beginning excavation Pipe in trench with gas line above DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/23/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Using bar to set pipe Kicker being placed behind hydrant valve at approximately 13+54 Fairway Jumping jack whacker working the base 1’ above pipe Abandoned 2” pipe cut out of way DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/23/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Compaction wheel working material DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA