Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
7-12-2022 Alec M
STPUD QUICK LOG Day & Date: 2//Z-/Z)-- Transcribe: Yes x No Project: Bijou Waterline Contractor: Vinciguerra Construction Inspector: f Today's Weather Forecast: Chance of Precipitation: 0 % Crews and Equipment on site: Project Manager — Operator Truck Driver _ Foreman Laborer ACCESS LIMITED: Foreman _Operator Laborer EQUIPMENT Excavator 328 Loader 928 _ End Dump Truck Work Truck _ 10 Wheel Dump Truck _ Skip Loader _ Water Truck Mini Excavator CAT 304 TC Truck _Spider Excavator Contractor Requests (shutdowns, pours, etc.): Tests ,Tests:xi,afrid AJc %ems/i-. 0 �..�.L'' /'a'L� f�� �,J /(/ 3 S Sc 0.-ar P c G C L A,"get/ , S rc s16, / 3 7— Service/Utility Hits: Potential Change Order ltems/T&M: Work Completed Today: ScC7/9-\ , Ire 6 / !ao Notes: (Visitors, Incidents, Accidents):f..'A/AC,‘r4"' �/o�'^ /s.b/ �' / ': 3.0 ier;l.c./ ‘/(ec$'