Loading...
fr_3004_6-30-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/30/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 5 65 84 CME personnel arrived onsite of the waterline replacement project in South Lake Tahoe. Arrived onsite at 8:00am and was informed that they were continuing on Shirley with todays excavation 3620 Shirley and ending on Bowers across from 3600 Forest. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued the excavation on the south side of Shirley, the contractor also began excavation on Bowers leading to Bill. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 40’ of DR14 was placed on Shirley and was backfilled along with 85’ of DR 18 (Bowers footage added) and 1 service. The service was located at 3620 Shirley. Hydrants and services were also worked on at the Bijou project with 4 services being placed, they were located at 3532, 3506 Cloverdale, 1076 Glenwood and 1079 Fairway. The STPUD locators were called out again as confirmation was requested on the area of Bowers between Shirley and Bill. Bill came out and remarked the services and explained that it was a service with a T leading to another service on the west side of Bowers. STPUD was again called when a cluster of unknown water pipes were found in the trench as the contractor crossed Shirley. Bill once again arrived along with Cuz and Adrian from STPUD along with Wayne Vinciguerra. It was determined that the majority of the pipes were abandoned but had been left and it was confirmed that no mainline runs on the west side of Bowers. Then walked south down Bowers with Wayne Cuz and Adrian to review marks and set up more locates. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 5 65 84 08:00 17:00 C 900 DR18-85 C 900 DR14- 40’ Services- 5 total, 1 on Bowers and 4 on Bijou Extra Depth- The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers. 40’ of DR14 was placed on Shirley along with 85‘ of DR 18 and 1 service. It was located at 3620 Shirley. The services for the Bijou side were located at 3532, 3506 Cloverdale, 1076 Glenwood and 1079 Fairway. JVL____ Aggregate Base, Native Shirley and Bowers intersection Cinderlite Pit, Trench Spoils 1 3’ BFG 2 1’ BFG 126.1 113.7 6.9 7.2 10.6 11.3 132.6 119.6 95 95 95 90 2 Shirley and Bowers intersection Troxler 3430 37748 08/18/21 Direct 2007 6 10 - - - - - - - - - - - - - - - - 10 6 Density 720Moisture DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/30/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Digging for service 3620 Shirley Trench running on Shirley towards Bowers 8” gate valve placed at 3620 Shirley Pot holing for gas, water, and communication at the Bowers Forest intersection DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/30/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cutting pipe to fit Cluster of pipes found in the Bowers and Shirley intersection Setting 90 degree fitting at Bowers and Shirley intersection New main able to fit under pipe cluster in Bowers and Shirley intersection DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/30/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 A 22 and 11 degree fittings being placed to get down Bowers Hydrant being placed on Bowers Compaction efforts being performed at Bowers, Shirley intersection Hydrant at Fairway and Pinecrest being worked on DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D