fr_3004_6-30-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/30/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
5
65
84
CME personnel arrived onsite of the waterline replacement project in South Lake Tahoe. Arrived onsite at
8:00am and was informed that they were continuing on Shirley with todays excavation 3620 Shirley and ending on
Bowers across from 3600 Forest.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued the excavation on the south side of Shirley, the contractor also began excavation on Bowers leading to
Bill. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for
95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
40’ of DR14 was placed on Shirley and was backfilled along with 85’ of DR 18 (Bowers footage added) and 1
service. The service was located at 3620 Shirley.
Hydrants and services were also worked on at the Bijou project with 4 services being placed, they were located
at 3532, 3506 Cloverdale, 1076 Glenwood and 1079 Fairway.
The STPUD locators were called out again as confirmation was requested on the area of Bowers between
Shirley and Bill. Bill came out and remarked the services and explained that it was a service with a T leading to
another service on the west side of Bowers. STPUD was again called when a cluster of unknown water pipes were
found in the trench as the contractor crossed Shirley. Bill once again arrived along with Cuz and Adrian from
STPUD along with Wayne Vinciguerra. It was determined that the majority of the pipes were abandoned but had
been left and it was confirmed that no mainline runs on the west side of Bowers. Then walked south down Bowers
with Wayne Cuz and Adrian to review marks and set up more locates.
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/30/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
5
65
84
08:00
17:00
C 900 DR18-85
C 900 DR14- 40’
Services- 5 total, 1 on Bowers and 4 on Bijou
Extra Depth-
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers.
40’ of DR14 was placed on Shirley along with 85‘ of DR 18 and 1 service. It was located at 3620 Shirley. The
services for the Bijou side were located at 3532, 3506 Cloverdale, 1076 Glenwood and 1079 Fairway.
JVL____
Aggregate Base, Native
Shirley and Bowers intersection
Cinderlite Pit, Trench Spoils
1 3’ BFG
2 1’ BFG
126.1
113.7
6.9 7.2
10.6 11.3
132.6
119.6
95
95
95
90
2
Shirley and Bowers intersection
Troxler 3430 37748 08/18/21
Direct
2007
6
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
6
Density
720Moisture
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/30/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Digging for service 3620 Shirley Trench running on Shirley towards Bowers
8” gate valve placed at 3620 Shirley Pot holing for gas, water, and communication at the
Bowers Forest intersection
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/30/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Cutting pipe to fit Cluster of pipes found in the Bowers and Shirley
intersection
Setting 90 degree fitting at Bowers and Shirley
intersection
New main able to fit under pipe cluster in Bowers and
Shirley intersection
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/30/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
A 22 and 11 degree fittings being placed to get down
Bowers
Hydrant being placed on Bowers
Compaction efforts being performed at Bowers, Shirley
intersection
Hydrant at Fairway and Pinecrest being worked on