fr_3004_6-23-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/23/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
5
60
68
CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am and was informed that they were continuing on the Bowers side of the project and continued
work on Forest Avenue. Excavation began at the dentist’s office driveway on Forest and headed east towards Ski
Run ending on the west side of the intersection where a test cap was placed
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued on the north side of Forest. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for
95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
100’ of DR14 was placed on Forest Ave and was backfilled along with 4 services, all long. They were located
at 3610, 3628, 3632 and 3636 Forest. 1” service was placed for 3628 as it also feeds 3626.
Arizona Pipeline arrived and saw cut the new trench line needed on Forest. The Vinciguerra crew then began
to trench east. They also had a Vac trailer working at the intersection of Forest and Ski Run locating existing
utilities, gas, electrical and communication are all believed to be in that area. In this area it had been marked to
hand dig and the crew did that as well as use Vac trailer. It was believed that all utilities were located and that the
water would have to rope down to get clearance with other utilities. Further investigation showed that fittings will be
needed to achieve clearance. The crew capped the pipe on the west side of the intersection and plated the rest of
the open trench, signs will posted giving the warning of plates on the roadway.
As it turns out they had closed Ski Run BLVD which in the city’s eyes is a not to be done. The contractor was
under the assumption that it was okay but stated they will only close half lane with flaggers in the future.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 2BAB6B35-9726-4332-9635-47725C6D8622
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/23/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
5
60
68
08:00
18:00
C 900 DR18
C 900 DR14- 100’
Services- 4 (all long) 3610, 3628, 3632 and 3636 Forest, 1-1’’
Extra Depth- 80’ @ 2’ extra
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also on-site. Jim,
Sergio, and Colin were not on-site.
Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
100’ DR 14 was placed today on Forest and 4 services were also installed today all long. They were at 3610,
3628, 3632 and 3636 all on Forest. The service to 3628 was a 1” as it serves 3626 also.
The crew hit a sewer lateral for the dentist office, (it was on mark) it was fixed and they moved on.
Mark from the city came to site and was upset that Ski Run was closed and was not happy with the amount of
dirt in roadway. Assured him that the contractor dumps into trucks and they clean up every night. Was also
informed that he had issues with the other project as well and was going to get a hold of Adrian.
Adrian called me and said that Ski Run should not have been shut down but that my job is not to director
babysit but not observe pipe placement and perform density testing over pipe
JVL____
Aggregate Base, Native
Dentist Office Driveway
Cinderlite Pit, Trench Spoils
1 3’ BFG
2 1’ BFG
127.3
112.2
5.4 7.2
11.9 11.3
132.6
119.6
96
94
95
90
2
Dentist Office Driveway
Troxler 3430 37748 08/18/21
Direct
2015
6
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
6
Density
723Moisture
DocuSign Envelope ID: 2BAB6B35-9726-4332-9635-47725C6D8622
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/23/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Line where saw cut is to be performed BMPs being placed along Ski Run BLVD as
thunderstorms are in the forecast
Arizona Pipeline arrived on-site to saw cut line for
Vinciguerra crew
Removing asphalt and pot holes being dug as excavation
begins
DocuSign Envelope ID: 2BAB6B35-9726-4332-9635-47725C6D8622
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/23/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Working under rock at driveway of dentist office Fixing the broken sewer at the dentist office
Vac trailer being used to pot hole Forest and Ski Run
intersection
Clearance between rock and pipe at dentist office
DocuSign Envelope ID: 2BAB6B35-9726-4332-9635-47725C6D8622
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/23/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Vinciguerra crew working in hand dig area at intersection
of Forest and Ski Run
Compaction efforts being performed on services on
Forest.
Root that was in the way of mole being pulled back
through hole
Hydrant that had been installed at 1189 Fairway
DocuSign Envelope ID: 2BAB6B35-9726-4332-9635-47725C6D8622