FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/24/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
4
62
78
CME personnel arrived onsite of the Bowers waterline replacement project in South Lake Tahoe. Arrived on
Forest at 8:00am and was informed that they were moving to Vanda Lee. Excavation began across from 3610
Vanda Lee in church parking lot.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and began
the excavation on the north side of Vanda Lee. A Cat 314C was used to dig the trench for the new 8” C 900 water
pipe.
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for
95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
160’ of DR14 was placed on Vanda Lee and was backfilled along with 2 services, 1 long and 1 short. They
were located at 3598, long and 3593, short.
The crew did hit a storm drain that was in pretty bad shape but gravel bags were placed on the sides where the
damage occurred and will be fixed on Monday when parts are available. This was approved by Mark with the city
and with Adrian.
The contractor also found a leak in a service when they went to pot hole. It was for 3601 Vanda Lee and
STPUD was called to take a look. It was decided that the leak was not severe enough to fix at this time but if
became a problem STPUD would return and fix. The area was backfilled with the meter and valve having plywood
placed over the hole and a door hanger left although it appeared that no one had been there for awhile.
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/24/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
4
62
78
08:00
17:00
C 900 DR18
C 900 DR14- 160’
Services- 2 1 long, 3598, 1 short 3593 Vanda Lee
Extra Depth-
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Casey and Vinciguerra were also onsite. Jim, Sergio,
and Colin were not onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
160’ DR 14 was placed today on Vanda Lee along with 2 services, 1 long and 1 short, 3598 and 3593
The crew hit a storm drain running across the street at 3601 Vanda Lee. After discussion with Adrian and Mark
with the city it was decided to gravel bag around the damaged area and plate until Monday when parts will be
available for proper fix, this area will be plated also.
JVL____
Aggregate Base, Native
3601 Vanda Lee
Cinderlite Pit, Trench Spoils
1 3’ BFG
2 1’ BFG
125.6
113.0
5.2 7.2
11.0 11.3
132.6
119.6
95
94
95
90
2
3593 Vanda Lee
Troxler 3430 37748 08/18/21
Direct
2009
6
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
6
Density
722Moisture
DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/24/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Asphalt being stripped from Vanda Lee Storm drain that had been hit at 3601 Vanda Lee
Excavation begins on Vanda Lee Water service that was leaking when pot holed at 3601
Vanda Lee, Andrew
DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/24/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Water service being dug out at 3598 Vanda Lee Dueling whackers running on Vanda Lee
Roots being cleared from trench by using a saws all Storm drain that had been hit with gravel bags on sides, a
plate will be placed over the top till repair on Monday