Loading...
fr_3004_6-27-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/27/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 5 58 78 CME personnel arrived onsite of the Bowers waterline replacement project in South Lake Tahoe. Arrived on Forest at 8:00am and was informed that they were continuing on Vanda Lee. Excavation began at 3593 and ended at the intersection with Betty Rae. The crew also began work on Shirley at the intersection with Herbert and ended at The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and began the excavation on the north side of Vanda Lee. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 86’ of DR14 was placed on Vanda Lee and was backfilled along with 2 services, 1 long and 1 short. They were located at 3593, long and 3601, short. 48’ of DR 14 was also placed on Shirley along with 53’ of DR 18. There was also a marking error on Shirley for the service at 3572. The main is on the north side of the street and the service was marked as though it came off the main. The contractor searched for it but had no luck. Larry with STPUD was called and when he arrived he marked the service line on the south side of the road. The contractor was not happy as they had spent hours looking for it. 2 services were also run on Shirley, both short. They were located at 3572 Shirley and 1063 Herbert. The resident at 3601 Vanda Lee (where the service was leaking) did arrive on the weekend and STPUD came out to turn on the water. The service was run from the new main to his meter and backfilled. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 5 58 78 08:00 17:00 C 900 DR18 53’ (Shirley) C 900 DR14- 86’ (Vanda Lee) 48’ (Shirley) Services- 4, 3593, 3601 one long, 1 short on Vanda Lee, and 3572 Shirley, 1063 Herbert both short Extra Depth- The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Casey and Vinciguerra were also onsite. Sergio was not onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers 86’ DR 14 was placed today on Vanda Lee along with 2 services, 1 long and 1 short, 3593 and 3601. 48’ of DR 14 was also placed on Shirley as well as 53’ of DR 18. 2 short services were placed on Shirley also. 1 at 3572 Shirley and 1063 Herbert. A hydrant valve and hydrant were set on Vanda Lee at the end of the run. JVL____ Aggregate Base, Native 3593 Vanda Lee Cinderlite Pit, Trench Spoils 1 3’ BFG 2 1’ BFG 125.6 109.7 5.2 7.2 9.5 11.3 132.6 119.6 95 92 95 90 2 3572 Shirley Troxler 3430 37748 08/18/21 Direct 2002 6 10 - - - - - - - - - - - - - - - - 10 6 Density 721Moisture DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/27/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Excavation continues on Vanda Lee DR 14 pipe being placed into trench on Vanda Lee Bedding being placed into trench Mole being run for service at 3593 Vanda Lee DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/27/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cutting out storm drain to be replaced Awaiting new section of CMP for placement Pot hole utilities on Shirley, gas and water service. Gas was located but water was on same side of the street as the services New marks for water service on Shirley DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/27/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 45 degree fittings used on Shirley Hydrant being set on Vanda Lee DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1