fr_3004_6-28-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/28/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 4 61 78 CME personnel arrived onsite of the Bowers waterline replacement project in South Lake Tahoe. Arrived on Forest at 8:00am and was informed that they were continuing on Shirley with todays excavation beginning at 3580 and ended at fire hydrant located at station 4+98 Rt Shirley. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and began the excavation on the north side of Vanda Lee. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 270’ of DR14 was placed on Shirley and was backfilled along with 5 services. They were located at 3582, 3575, 3577, 3588 and 3581. A service was also placed at 3610 Vanda Lee. There was another service that the crew had a hard time finding. They had dug 4’ wide and 5’ deep centered on the mark and had not located it. Larry with STPUD was called and arrived when he finished the job he was on. He hooked up electronically and said the marks were good but the depth was below our trench grade. They dug slow and never encountered it so the pipe was placed and we moved on. The crew also hit a sewer lateral at 3588 Shirley, it was on the mark they just missed it. It was fixed as they moved on. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 4 61 78 08:00 18:00 C 900 DR18 C 900 DR14- 270’ Services- 6 locations can be found below Extra Depth- 1’ for 100’, 2’ for 60’ The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Casey and Vinciguerra were also onsite. Sergio was not onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers. 270’ of DR14 was placed on Shirley along with 5 services. They were located at 3582,3575, 3577, 3588 and 3581, along with a service on Vanda Lee at 3610 for total of 6 services. The hydrant at station 4+98 Rt Shirley was also set but not completed, drain rock needs to placed. The contractor also hit the sewer lateral at 3588 Shirley, they fixed it and moved on. It was on the mark just missed. JVL____ Aggregate Base, Native 3582 Shirley Cinderlite Pit, Trench Spoils 1 3’ BFG 2 1’ BFG 125.4 108.3 5.1 7.2 9.4 11.3 132.6 119.6 95 91 95 90 2 3588 Shirley Troxler 3430 37748 08/18/21 Direct 2018 6 10 - - - - - - - - - - - - - - - - 10 6 Density 721Moisture DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/28/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Shirley as was left the night before Digging up services on Shirley Bore being performed at 3610 Vanda Lee Pot holes being dug on north side of Shirley DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/28/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Pipe being slung into trench with bell restraints attached New water marks for 3582 Shirley, we never did see it and went over Material layer out for mole and service tie in Repaired sewer at 3588 Shirley DocuSign Envelope ID: 83EEE3ED-1B1D-4CEA-9128-081B69C4D5A1