fr_3004_6-29-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/29/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
4
65
78
CME personnel arrived on-site of the waterline replacement project in South Lake Tahoe. Arrived on-site at
8:00am and was informed that they were continuing on Shirley with todays excavation beginning at the hydrant at
station 4+98 Rt and ended at
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued the excavation on the south side of Shirley. A Cat 314C was used to dig the trench for the new 8” C 900
water pipe.
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for
95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
320’ of DR14 was placed on Shirley and was backfilled along with 9 services. They were located at 3593,
3589, 3599, 3601, 3605 (long) 3604, 3606, 3612, 3616 (short).
There was another service that gave us problems at 3604 Shirley, upon pot holing it was found to run parallel
with trench. STPUD was called to confirm if line was live and it ended up running from the main south to the other
side of the street where it served 3 houses, 3604, 3606 and 3612. This came as a surprise to STPUD and
contractor but we were able to shift the trench alignment north and continue. There was concern about the line
sagging into the trench but were able to get through with no issues.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/29/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
4
65
78
08:00
18:00
C 900 DR18
C 900 DR14- 320’
Services- 9, 5 long and 4 short
Extra Depth- 40’ 1’ extra
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also on-site. Sergio
was not on-site.
Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers.
320’ of DR14 was placed on Shirley along with 9 services. They were located at 3593, 3589, 3599, 3601, 3605
( long) 3604. 3606, 3612, 3616 (short)
It was discovered that there was a water service running from the main across the street that feeds 3 houses,
3604, 3606 and 3612 Shirley. It was first thought to be abandoned but STPUD was called and was believed to be
live, these are the only houses on Shirley that run of that single service.
JVL____
Aggregate Base, Native
Vanda Lee Storm Drain repair
Cinderlite Pit, Trench Spoils
1
3
3’ BFG
2 3’ BFG
127.8
126.6
109.4
4.7
1’ BFG
7.2
5.0
9.4 11.3
7.2
132.6
132.6
119.6
96
95
91
95
95
90
2
3606 Shirley
3612 Shirley
Troxler 3430 37748 08/18/21
Direct
20
6
6
10
-
-
-
-
-
-
- -
-
-
-
-
-
-
10
6
6
Density
72Moisture
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/29/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Pot hole crew in front of the excavation Storm drain fixed on Vanda Lee, contractor had hit it on
Friday and did temporary fix
Abandoned communication cut at pole 3606 Shirley Compaction efforts around storm drain on Vanda Lee
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/29/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
3/4” line that comes across the street from main that feeds
3 houses 3604, 3606 and 3612 was not shown on plans
Cable TV and mark
Drain rock used around hydrants Mark for cable TV 5-7’ off
DocuSign Envelope ID: 5455B596-AA65-44BD-A782-A67A28A53A1D