fr_3004_7-14-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
07/14/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Sunny
Adrian STPUD, Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
Trent Schoppe
4
58
84
Arrived onsite at 7:45 am. Vinciguerra crew setting up to finish hydrant connection on Larch Ave.
Also starting excavation on Osgood for new 6” water main.
A Cat 314C was used to dig the trench for the new 6” C 900 water pipe on Osgood
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the specifications call for 95%
had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
Vinciguerra crew installed a new hydrant at 3604 Osgood and used a 45 elbow to place it 8’ west of original
location to avoid driveway and trees per Adrians instruction.
Services placed 3604-3608-3611-3615
JVL____
07:00 AM
PM17:00
DocuSign Envelope ID: 94C8A009-F5EF-4F37-B74B-C1DE8D1F79F2
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
07/14/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Sunny
acombes@stpud.us
jryan@stpud.us
Trent Schoppe
4
58
84
07:00
17:00
C 900 DR18- 177’
C 900 DR14-
Services- 3604-3608-3611-3615 Osgood
Extra Depth-
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, Case 570 MXT tractor, Cat 299D skid
steer, 3 10 wheelers.
JVL____
Aggregate Base, Native
3615 Osgood fail
Cinderlite Pit, Trench Spoils
1
3
3’ BFG
2 3’ BFG
120.6
125.0
107.0
4.8
1’ BFG
7.2
3.8
11.2 11.3
7.2
132.6
132.6
119.6
91
95
90
95
90
90
2
3615 Osgood After additional compaction
3615 Osgood
Troxler 3430 37748 07/14/21
Direct
2015
6
6
10
-
-
-
-
-
-
- -
-
-
-
-
-
-
10
6
6
Density
720Moisture
DocuSign Envelope ID: 94C8A009-F5EF-4F37-B74B-C1DE8D1F79F2
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/14/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
setting up for excavation on Osgood Preparing ditch for pipe placement
Covering connections by hydrand Finishing hydrant placement on Larch ave
DocuSign Envelope ID: 94C8A009-F5EF-4F37-B74B-C1DE8D1F79F2
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/14/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Placing services on osgood Excavation ends at tie in at intersection of Osgood ave
and maple ave
Water jetting base Compacting native soil