fr_3004_7-20-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
),(/'5(3257
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
07/20/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Sunny
Adrian STPUD, Vinciguerra crew (9)
Trent Schoppe
5
62
80
Arrived onsite at 7:50 Vinciguerra crew setting up to continue excavation on Bobby grey starting at 3556.
A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding with pipe placed on top of it. They then placed
base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was
then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required
on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided
by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was
also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the
CME laboratory. Results for this testing can also be found in this report. Although the specifications call for 95%
had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A
compaction wheel attached to an excavator was used for compaction efforts.
Vinciguerra crew placed 200’ of DB14 at Bobby Grey, 4 services at Betty Rae, 4 services at Fairway, Tie in at
Fairway, and Tie in at Vanda Lee and Betty Rae.
Water was turned off by JP with STPUD at 1:30. They delayed shut off due to Heavenly Valley Church having 30+
kids at a function until 1:00pm
Water was turned back on after services and tie in was complete at 5:30
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
07/20/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly sunny
acombes@stpud.us
jryan@stpud.us
Trent Schoppe
2
60
78
08:00
17:00
C 900 DR18-
C 900 DR14- 200’ (because they ran out of 18, non restrained)
Services- (1”) 1014 Fairway ave/ (1”) 3585 for dbl 3/4 (3585&3589) Betty Rae (3/4”) 1046-1052-1061 Fairway
ave. (3/4”) 3578-3579-3583 Betty Rae.
Extra Depth-
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, Case 570 MXT tractor, Cat 299D skid
steer, 3 10 wheelers.
JVL____
Aggregate Base, Native
Middle of road crossing in front of 3537
Cinderlite Pit, Trench Spoils
1 3’ BFG
2 1’ BFG
126.8
111.2
4.4 7.2
6.2 11.3
132.6
119.6
96
93
95
90
2
Middle of road crossing in front of 3537
Troxler 3430 37748 07/14/21
Direct
2015
6
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
6
Density
720Moisture
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/20/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Digging for tie in at vanda lee and Betty rae Cleaning and cutting pipe
Tie in location Placed tie in
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/20/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Excavating for tie in at Fairway Placing tie in at Fairway
Backfilling service’s at Betty rae Betty Rae services
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/20/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Digging for service placement at Betty rae Backfill service with sand
Mainline trench on Bobby grey Excavating mainline trench at Bobby grey
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/20/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
45 degree elbow placement Compacting base above pipe and density testing
Placing concrete for elbow thrust block Placing service on Betty Rae
DocuSign Envelope ID: 0481DD84-D526-48A4-BEFD-806D9316EA32