STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Smokey sunnny
Adrian STPUD, Vinciguerra crew (9)
Trent Schoppe
5
58
85
Arrived onsite at 7:30 Vinciguerra crew setting up to excavate main line at Bobby Grey, and placing services on
Bobby Grey.
A Cat 304D was used to dig the trench for the new tie in locations as well as the services.
The crew placed fittings for tie in and secured tracer wire with tape, then wrapped in plastic and placed concrete
for thrust blocks according to drawing specifications as well as 9” min sand around service connections.
…
No sign of leaking was found.
After backfill and compaction base and native was found to be firm and non yielding.
Vinciguerra crew placed 104’ of non restrained DR14 (out of DR18) on Bobby Grey including 1 90 and 1 8” T Valve
at Bobby grey and bowers.
They also placed 161’ of unrestrained DR14 (out of DR18) on Bowewrs between Bill and Shirley.
During excavation of Bobby grey the crew discovered that the existing water main at Bobby grey and bowers near
1142 bowers was a 2” main (6” shown on plans). The crew also discovered an additional 2” valve near the hydrant
at same location. Vinciguerra discussing with Adrian a as built plan for this location.
MJ Gate valve was installed at bowers and Bill as discussed with Adrian.
I reminded Casey that a service at 1133 Bowers was the wrong size and he had his crew replace it with the correct
1” service.
KBW____
08:00 AM
PM17:00
DocuSign Envelope ID: 711F769A-AC14-46AD-989F-93AB807ECCE6
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
07/25/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
acombes@stpud.us
jryan@stpud.us
Trent Schoppe
5
60
78
08:00
17:00
C 900 DR18-
C 900 DR14- 265 (unrestrained due to DR18 shortage).
Services- Bobby Grey - 3622-3537-3533-3529-3532- Replace 1133 bowers with 1”
Larch - 3608-3609
Extra Depth-
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, Case 570 MXT tractor, Cat 299D skid
steer, 3 10 wheelers.
JVL____
Aggregate Base, Native
Cinderlite Pit, Trench Spoils
2
Troxler 3430 37748 07/14/21
Direct
2015
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
Density
720Moisture
DocuSign Envelope ID: 711F769A-AC14-46AD-989F-93AB807ECCE6
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/25/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Starting excavation for new main on Bobby grey Placing base around pipe
Discovered 2” pipe (plans show 6” pipe in this location).Density testing base above pipe
DocuSign Envelope ID: 711F769A-AC14-46AD-989F-93AB807ECCE6
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/25/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Placing T-Valve at bowers/Bobby grey Wrapping T-Valve before placing concrete thrust block
Digging for services Incorrect service placed at 1133 bowers.
DocuSign Envelope ID: 711F769A-AC14-46AD-989F-93AB807ECCE6
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
07/25/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Excavation for new main between bill and Shirley Waterjetting base around pipe
As built notes for Bobby Grey As built notes for Bobby Grey