Loading...
fr_3004_7-28-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 ),(/'5(3257 THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by 07/28/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Sunny Adrian STPUD, Vinciguerra crew (10) Trent Schoppe 5 60 90 Arrived on-site at 7:45 Vinciguerra crew working on connecting services on Deer as well as connecting the tie in at Forest and Ski Run. Chlorine tests were taken on Bobby Grey at 10:30am, Shirley at 11:30am, and Bill at 11:40am. After testing the lines were flushed. During excavation on Deer Vinciguerra crew hit an active service causing a leak. Water service for that location was shut off at 9:30 for repairs, service was turned back on at 10:00. During excavation for tie in at ski run and forest Vinciguerra hit and damaged the pvc casing for a underground power line. Casey was informed he would need to call Liberty power to repair the line. A Liberty power employee arrived on-site at 2:10 to asses the damage to the line and called out a crew to make repairs. Liberty power crew arrived on-site to make repairs at 3::40 and finished the repair at 4:10. The trench at the end of Forest required extra depth of 3.5’ to clear all power and sewer services before reaching tie in location. A total of 58’ of DR14 was placed from Forest to the tie in on Ski Run and 3 45 degree elbows. A Cat 304D was used to dig the trench for the new services, and a cat 314C was used to dig trench for tie in located at Forest and Ski Run. No sign of leaking was found. 9” min sand was placed around service connections. After backfill and compaction base and native was found to be firm and non yielding. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: C84ACB83-2B40-422F-B952-31EB9F3C8216 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by FIELD DENSITY SUMMARY 7HVW 1R 0DWHULDO'HVFULSWLRQ(OHYDWLRQ  ,Q3ODFH 'U\ 'HQVLW\ 3&)  ,Q3ODFH 0RLVWXUH &RQWHQW   2SWLPXP 0RLVWXUH &RQWHQW   0D[LPXP 'U\ 'HQVLW\ 3&)  ,Q3ODFH &RPSDFWLRQ   6SHFLILHG 5HODWLYH &RPSDFWLRQ 0LQ 0DWHULDO6RXUFH )* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ 3DJHRI *DXJH,QIR 6RLOV'HQVLW\5HVXOWV 0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW  0HWKRGRI0HDVXUHPHQW 0DNH 5HODWLYH7HVW 'HSWK LQ  6WG&RXQW  07/27/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 acombes@stpud.us jryan@stpud.us Trent Schoppe 5 60 78 08:00 17:00 C 900 DR18- C 900 DR14- 58’ Services- 3507- 3515- 3517- 3523- 3527- 3522- 1124- 3510- 3514- 3522- 3528- 3523- 3538 Extra Depth- 3.5’ ski run and forest tie in for 58’ The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, Boone and Alex underground utility pipe fitters. Casey and Austin Vinciguerra were also on-site. Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, Case 570 MXT tractor, Cat 299D skid steer, 3 10 wheelers. JVL____ Aggregate Base, Native Ski Run above tie in Cinderlite Pit, Trench Spoils 1 BC 2 SG 125.7 125.1 5.9 7.2 3.8 7.2 132.6 132.6 95 95 95 95 2 Ski Run above service Troxler 3430 37748 07/14/21 Direct 2015 6 10 - - - - - - - - - - - - - - - - 10 6 Density 720Moisture DocuSign Envelope ID: C84ACB83-2B40-422F-B952-31EB9F3C8216 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 07/28/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Connecting services at Ski Run Flaggers sent up for tie in closure at Ski Run and Forest Damaged pipe for underground power Liberty power repairing damaged pipe for underground power DocuSign Envelope ID: C84ACB83-2B40-422F-B952-31EB9F3C8216 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 07/28/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Installing new main at tie in on Ski Run and Forest Flushing Bill and Shirley Flushing Bobby Grey Vanda Lee pressure test DocuSign Envelope ID: C84ACB83-2B40-422F-B952-31EB9F3C8216 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 07/28/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Connecting services at Deer Connecting services at Deer Compacting backfill at Ski Run and Forest tie in Back fill tie in at Ski Run and Forest DocuSign Envelope ID: C84ACB83-2B40-422F-B952-31EB9F3C8216