CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
05/24/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Clear/Calm
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
6
52
70
CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am and as crew prepared to head south on Fairway.
The Vinciguerra crew (1 operator, Jim and 7 Underground Utility Pipe Fitters, 1 Truck Driver) arrived began to
peel asphalt off of Fairway. Approximately 250’ was peeled off and existing utilities were pot holed prior to the the
excavation beginning. While one of the excavators worked on peeling the asphalt and digging new trench another
excavator (Casey operator) was working on cleaning up the rest of the trench that had been flooded. The storm
drain was removed, it had been found and declared abandoned on Thursday but never got removed. One section
of pipe was removed from trench as it did not have minimum cover, the trench was regraded from that point.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report as well as 1 from Thursday that was back calculated. Although the the specifications call for 95% had
been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction
wheel attached to an excavator was used for compaction efforts.
A sewer lateral was hit for 3506 Blackwood (runs on Fairway line) contractor fixed and moved on. Saddles
were installed along with services run to 5 meters and the STPUD Test Station at 16+85 Lt Fairway. 2 of the
services were long side and the mole was used on these so as not to disturb the asphalt, an air compressor was
used to slowly move the mole across street into recently excavated trench. Poly pipe was then attached to the
mole and pulled back along with tracer wire.
Departed site 1800 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
) DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR 1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/24/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Clear/Calm
acombes@stpud.us
jryan@stpud.us
6
52
70
08:00
18:00
C 900 DR18 248’
C 900 DR14 20’
Saddles and services were placed at 1084 (long) 1090 (long) Fairway, 3/4” and 1” at 3507 Ferndale (runs off
Fairway line) STPUD Test Station at16+85 Lt Fairway and 3506 Blackwood (runs off Fairway line)
8’’ T w\3-8’’ Gate Valves at Station 16+11 Lt Fairway (Intersection with Ferndale)
Depth 1’ extra for 70’
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth,
underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site.
Totals for Thursday 5-19-22
C 900 DR 18 80’
C 900 DR 14 40’
Saddle 1078, 1079 Fairway, 3506 Cloverdale off Fairway line
Depth 1’ extra 30’
JVL____
Aggregate Base, Native
1084 Fairway
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
127.8
126.2
110.8
111.6
8.1
2’ BFG
1’ BFG
7.2
6.7
9.9
10.3
11.5
11.5
7.2
132.6
132.6
119.6
119.6
96
95
93
93
95
95
90
90
2
Intersection Fairway and Ferndale
Intersection Fairway and Ferndale
1098 Fairway
Troxler 3430 37748 08/18/21
Direct
2011
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
720Moisture
DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/24/22 3004 63
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Asphalt being removed from area to be dug today Cleaning out trench where water leak happened
Pot prior to excavation One stick of 20’ was removed and trench was regraded
DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/24/22 3004 64
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Digging around water valve at Ferndale intersection Exposing gas main so services can be placed safely
Bedding being placed in trench Mole that will be air powered under the road and poly will
be pulled back for services
DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/24/22 3004 65
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Mole going under gas line Setting “T” at Fairway and Ferndale intersection
Poly and tracer wire being pulled back through mole hole Sewer that had been repaired for 3506 Blackwood
DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/24/22 3004 66
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Compaction wheel working native backfill material along
Fairway