fr_3004_5-24-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 05/24/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (8) acombes@stpud.us jryan@stpud.us 6 52 70 CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am and as crew prepared to head south on Fairway. The Vinciguerra crew (1 operator, Jim and 7 Underground Utility Pipe Fitters, 1 Truck Driver) arrived began to peel asphalt off of Fairway. Approximately 250’ was peeled off and existing utilities were pot holed prior to the the excavation beginning. While one of the excavators worked on peeling the asphalt and digging new trench another excavator (Casey operator) was working on cleaning up the rest of the trench that had been flooded. The storm drain was removed, it had been found and declared abandoned on Thursday but never got removed. One section of pipe was removed from trench as it did not have minimum cover, the trench was regraded from that point. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report as well as 1 from Thursday that was back calculated. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. A sewer lateral was hit for 3506 Blackwood (runs on Fairway line) contractor fixed and moved on. Saddles were installed along with services run to 5 meters and the STPUD Test Station at 16+85 Lt Fairway. 2 of the services were long side and the mole was used on these so as not to disturb the asphalt, an air compressor was used to slowly move the mole across street into recently excavated trench. Poly pipe was then attached to the mole and pulled back along with tracer wire. Departed site 1800 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 6 52 70 08:00 18:00 C 900 DR18 248’ C 900 DR14 20’ Saddles and services were placed at 1084 (long) 1090 (long) Fairway, 3/4” and 1” at 3507 Ferndale (runs off Fairway line) STPUD Test Station at16+85 Lt Fairway and 3506 Blackwood (runs off Fairway line) 8’’ T w\3-8’’ Gate Valves at Station 16+11 Lt Fairway (Intersection with Ferndale) Depth 1’ extra for 70’ The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site. Totals for Thursday 5-19-22 C 900 DR 18 80’ C 900 DR 14 40’ Saddle 1078, 1079 Fairway, 3506 Cloverdale off Fairway line Depth 1’ extra 30’ JVL____ Aggregate Base, Native 1084 Fairway Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 127.8 126.2 110.8 111.6 8.1 2’ BFG 1’ BFG 7.2 6.7 9.9 10.3 11.5 11.5 7.2 132.6 132.6 119.6 119.6 96 95 93 93 95 95 90 90 2 Intersection Fairway and Ferndale Intersection Fairway and Ferndale 1098 Fairway Troxler 3430 37748 08/18/21 Direct 2011 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 720Moisture DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/24/22 3004 63 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Asphalt being removed from area to be dug today Cleaning out trench where water leak happened Pot prior to excavation One stick of 20’ was removed and trench was regraded DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/24/22 3004 64 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Digging around water valve at Ferndale intersection Exposing gas main so services can be placed safely Bedding being placed in trench Mole that will be air powered under the road and poly will be pulled back for services DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/24/22 3004 65 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Mole going under gas line Setting “T” at Fairway and Ferndale intersection Poly and tracer wire being pulled back through mole hole Sewer that had been repaired for 3506 Blackwood DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/24/22 3004 66 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Compaction wheel working native backfill material along Fairway DocuSign Envelope ID: 42F98479-59C5-4F9A-8174-3FA4B16BABA8