Loading...
fr_3004_5-25-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 05/25/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (8) acombes@stpud.us jryan@stpud.us 5 55 76 CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am and as crew prepared to head south on Fairway. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued up Fairway to the Blackwood “T”. The pipe had to be lowered in the intersection to achieve proper clearance with the existing sewer. Two, 45 degree fittings were used to lower the pipe and two more were used to bring back to normal depth. An 8’’ T w/3 8’’ gate valves was placed at station 17+80 Lt Fairway with hydrant valve placed at 17+95 Lt Fairway. Kickers of concrete was placed at the 45s and behind the valves at the vertical offset. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report as well as 1 from Thursday that was back calculated. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. The mole was used once again to install long side services at 1098, 1078 Fairway. Lay out was also performed at the south end of Fairway along with Vanda Lee and Osgood on the Bowers project. Austerman was on-site to perform saw cutting in these areas along with service areas in various locations. Departed site 1730 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 5 55 76 08:00 18:00 C 900 DR18 17’ C 900 DR14 20’ Saddles and services were placed at 1098 (long) 1078 (long) 1070 (long) Fairway 8’’ T w\3-8’’ Gate Valves at Station 17+80 Lt Fairway (Intersection with Blackwood) Hydrant valve places at 17+95 Fairway Vertical offset per detail 3-D3 Fairway and Blackwood Intersection, 2’ extra depth 20’ The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site. Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers JVL____ Aggregate Base, Native Intersection Fairway and Blackwood Cinderlite Pit, Trench Spoils 1 3’ BFG 2 1’ BFG 126.5 112.6 8.6 7.2 9.6 11.5 132.6 119.6 95 94 95 90 2 Intersection Fairway and Blackwood Troxler 3430 37748 08/18/21 Direct 2007 6 10 - - - - - - - - - - - - - - - - 10 6 Density 718Moisture DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Continuing work at Blackwood and Fairway Intersection Exposing gas at service location 1098 Fairway Exposing mainline for service work Laying out saw cut south end of Fairway DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Shoring set at vertical offset Fairway and Blackwood intersection Concrete to be used for kickers and thrust blocks at vertical offset fittings Working on fittings inside shoring Kickers placed around fittings DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Saw cut south end of Fairway Compaction efforts in service area Compaction efforts intersection Fairway and Blackwood DocuSign Envelope ID: 64A21110-5E9F-4C8C-B2BB-73B2D4E202CA