fr_3004_5-27-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 05/27/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Cloudy/ Windy Vinciguerra crew (8) acombes@stpud.us jryan@stpud.us 5 55 70 CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am and as crew prepared to head east on Blackwood. The Vinciguerra crew (1 operator, Jim and 6 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued to head east on Blackwood starting at 3518 Blackwood. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 180’ of C900 DR 18 and 20’ of C900 DR14 were placed ending at 3534 Blackwood and backfilled along with 3 short side services. The DR 14 was placed at 3534 Blackwood where a piece was centered under the sewer lateral to achieve proper clearance. The services were located at 3522, 3528 and 3534 all on Blackwood. Sand was placed around the poly pipe prior to backfill to help protect the pipe. At times today residents asked if they could get their vehicles out and then back in, assured them that we would accommodate them when needed. The crew worked with them and they were able to get in and out with no problems. The contractor did extra cleanup and was to demobilized equipment and trucks off site for the holiday weekend. Was informed by Austin that it would be done. Departed site 1700 as crew continued clean up. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Cloudy/ Windy acombes@stpud.us jryan@stpud.us 5 55 70 08:00 17:00 C 900 DR18 180’ C 900 DR14 20’ Saddles and services (all short side) 3522, 3528 and 3534 Blackwood The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio underground utility pipe fitters. Austin and Casey Vinciguerra were also on-site. Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers The crew had 3 pipe fitters call in sick, Thomas, Chris and Colin JVL____ Aggregate Base, Native 3522 Blackwood Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 127.8 126.4 113.9 114.7 4.9 2’ BFG 1’ BFG 7.2 5.5 7.9 9.6 11.5 11.5 7.2 132.6 132.6 119.6 119.6 96 95 95 96 95 95 90 90 2 3528 Blackwood 3518 Blackwood 3534 Blackwood Troxler 3430 37748 08/18/21 Direct 2002 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 720Moisture DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/27/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Removal of trench plates so excavation can continue Working through the roots Utilities being pot holed in front of the excavation Cleaning up while waiting for base DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/27/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cap placed at end of pipe Service placed at 3522 Blackwood, roots cut back to bank Working on water service 3528 Blackwood Crew sweeping up DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/27/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Base being dumped for placement in driveways prior to cold mix Compaction efforts on the base that had been placed in the driveways DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D