FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
05/27/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Cloudy/ Windy
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
5
55
70
CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am and as crew prepared to head east on Blackwood.
The Vinciguerra crew (1 operator, Jim and 6 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued to head east on Blackwood starting at 3518 Blackwood. A Cat 314C was used to dig the trench for the
new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would
be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction
efforts.
180’ of C900 DR 18 and 20’ of C900 DR14 were placed ending at 3534 Blackwood and backfilled along with 3
short side services. The DR 14 was placed at 3534 Blackwood where a piece was centered under the sewer
lateral to achieve proper clearance. The services were located at 3522, 3528 and 3534 all on Blackwood. Sand
was placed around the poly pipe prior to backfill to help protect the pipe.
At times today residents asked if they could get their vehicles out and then back in, assured them that we would
accommodate them when needed. The crew worked with them and they were able to get in and out with no
problems.
The contractor did extra cleanup and was to demobilized equipment and trucks off site for the holiday weekend.
Was informed by Austin that it would be done.
Departed site 1700 as crew continued clean up.
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
) DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR 1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/27/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Cloudy/ Windy
acombes@stpud.us
jryan@stpud.us
5
55
70
08:00
17:00
C 900 DR18 180’
C 900 DR14 20’
Saddles and services (all short side) 3522, 3528 and 3534 Blackwood
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio underground utility pipe fitters. Austin and Casey Vinciguerra were also on-site.
Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
The crew had 3 pipe fitters call in sick, Thomas, Chris and Colin
JVL____
Aggregate Base, Native
3522 Blackwood
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
127.8
126.4
113.9
114.7
4.9
2’ BFG
1’ BFG
7.2
5.5
7.9
9.6
11.5
11.5
7.2
132.6
132.6
119.6
119.6
96
95
95
96
95
95
90
90
2
3528 Blackwood
3518 Blackwood
3534 Blackwood
Troxler 3430 37748 08/18/21
Direct
2002
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
720Moisture
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/27/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Removal of trench plates so excavation can continue Working through the roots
Utilities being pot holed in front of the excavation Cleaning up while waiting for base
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/27/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Cap placed at end of pipe Service placed at 3522 Blackwood, roots cut back to bank
Working on water service 3528 Blackwood Crew sweeping up
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/27/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Base being dumped for placement in driveways prior to
cold mix
Compaction efforts on the base that had been placed in
the driveways