fr_3004_5-31-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
05/31/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
6
46
65
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am and as crew prepared to head east on Ferndale.
The Vinciguerra crew (1 operator, Jim and 8 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and began
to head east out of “T” up Ferndale. The crew had to re-mobilize after the long weekend and a Cat 314C was used
to dig the trench for the new 8” C 900 water pipe. The trench average was 62” deep and 25” wide.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would
be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction
efforts.
280’ of C900 DR 18 were placed ending at 3520 Ferndale (hydrant valve will be placed first thing) and
backfilled along with 3 short and 3 long side services. The short services were located at 3504, 3520 and 3511
Blackwood (ran off Ferndale line). The long side services were located at 3515, 3519, and 3527 all on Ferndale.
Sand was placed around the poly pipe prior to backfill to help protect the pipe.
At times today residents asked if they could get their vehicles out and then back in, assured them that we would
accommodate them when needed. The crew worked with them and they were able to get in and out with no
trouble.
The crew did find what appeared to be an abandoned 12” storm drain 10’ east of the valve tie in, Ferndale and
Fairway intersection at start of excavation. They were able to work around and it was left in place.
Departed site 1800 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/31/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
6
46
65
08:00
18:00
C 900 DR18 280’
C 900 DR14
Saddles and services run to 3504, 3520, Ferndale and 3511 Blackwood (short), 3515, 3519, and 3527 Ferndale
( long)
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio underground utility pipe fitters. Austin and Casey Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
The crew had 3 pipe fitters call in sick, Thomas, Chris and Colin
A sewer lateral was hit for 3511 Blackwood (runs on Ferndale line) and the contractor fixed it and moved on.
JVL____
Aggregate Base, Native
3504 Ferndale
Cinderlite Pit, Trench Spoils
1
3
4
5
3’ BFG
2 3’ BFG
2.5’ BF
126.8
126.0
112.2
113.1
127.8
8.5
2’ BFG
1’ BFG
7.2
8.0
9.6
9.3
7.1
11.5
11.5
7.1
7.2
132.6
132.6
119.6
119.6
132.6
96
95
94
95
96
95
95
90
90
95
2
3520 Ferndale
3504 Ferndale
3520 Ferndale
Valve cluster intersection of Fairway and Ferndale
Troxler 3430 37748 08/18/21
Direct
2005
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
722Moisture
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
05/31/22 3004 63
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Begin excavation at intersection of Fairway and Ferndale
heading east on Ferndale
Shores being placed where deep section was, at tie in
Aggregate base being placed onsite for use as backfill Pothole of existing utilities being performed
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
05/31/22 3004 64
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Long side services being dug in preparation for tie in Service at 3504 Ferndale (short)
Excavator having to work around trees and wires Mole being used for long side services, gas company
representative onsite as mole has to go under existing gas
line
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
05/31/22 3004 65
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Water jetting being performed around pipe Jumping jack whacker being used for compaction efforts
on aggregate base at 3504 Ferndale
Sewer that contractor had hit and repaired Pipe being lowered into trench for placement
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
05/31/22 3004 66
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Hydrant valve to be placed first thing tomorrow at station
52+81 Rt Ferndale
Base placement around valve cluster Ferndale and
Fairway intersection
Compaction efforts on the long side services being
performed by a jumping jack whacker
Compaction efforts around valve cluster
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D