FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/01/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
5
46
72
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew continued to head east on Ferndale. The excavation today began across from 3527
Ferndale.
The Vinciguerra crew (1 operator, Jim and 8 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued to head east up Ferndale where a Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The trench average was 62” deep and 25” wide.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would
be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction
efforts.
220’ of C900 DR 18 were placed ending at Ferndale, Glenwood intersection and backfilled along with 2 short
and 3 long side services. The short services were located at 3528 Ferndale and 1100 Glenwood. The long side
services were located at 3529, 3535 on Ferndale and 1086 Glenwood. Sand was placed around the poly pipe prior
to backfill to help protect the pipe. Pipe placement ended at Ferndale, Glenwood intersection.
At times today residents asked if they could get their vehicles out and then back in, assured them that we would
accommodate them when needed. The crew worked with them and they were able to get in and out with no
trouble.
Departed site 1730 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/01/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
5
46
72
08:00
18:00
C 900 DR18 220’
C 900 DR14
Saddles and services run to 3529, 3535 Ferndale, 1086 Glenwood (long) and 3528 Ferndale, 1100 Glenwood
(short)
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio underground utility pipe fitters. Austin and Casey Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
The crew had 3 pipe fitters out sick, Thomas, Chris and Colin
The hydrant valve and hydrant were set at station 52+81 Rt Ferndale, 3.5’ of 6” pipe
The water service for 3527 Ferndale comes out south and then heads back under the main to the north.
JVL____
Aggregate Base, Native
3528 Ferndale
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
126.0
126.6
115.4
113.7
5.4
2’ BFG
1’ BFG
7.2
4.9
8.9
8.5
11.5
11.5
7.2
132.6
132.6
119.6
119.6
95
95
96
95
95
95
90
90
2
1100 Glenwood
3528 Ferndale
1100 Glenwood
Troxler 3430 37748 08/18/21
Direct
2012
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
720Moisture
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/01/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Another service that comes out and goes under the main
at 3527 Ferndale
Hydrant valve with stick of pipe attached being placed into
hole
Long side services were again exposed so mole could
shoot to the other side of the street
Section of trench that caved in prior to pipe placement
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/01/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Attaching 3.5’ piece of 6” pipe to hydrant prior to
placement in trench
Aggregate Base being placed over pipe as compaction
efforts are being performed by a jumping jack whacker
Setting hydrant station 52+81 Ferndale Extra material being loaded for haul offsite as no material
can be stored onsite
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/01/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Concrete kicker poured behind valve with pillow below
valve
Base being placed over compacted native material in
driveway.