Loading...
fr_3004_6-2-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/02/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Vinciguerra crew (8) acombes@stpud.us jryan@stpud.us 6 50 72 CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew moved back to Fairway to continue excavation. They started today on the south side of the Blackwood and Fairway intersection at the hydrant valve that had been previously placed. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and went south on Fairway where a Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The first piece of pipe used today was the DR 14 as it was centered under the existing sewer. With the sewer lines nearer finish grade it appeared that the contractor would have to switch between the 14 and the 18 depending on the situation. There was a 5’ gap between the first 2 pipes today so the contractor can split the pressure testing and flushing in half instead of trying to do it all in one shot. This had been agreed upon by Austin with Vinciguerra and Adrian with STPUD. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 160’ of C900 DR 18 and 60’ of C900 DR 14 was placed along Fairway and backfilled along with 3 short and 3 long side services. The short services were located at 1111, 1117,and 1121 with the long side being located at 1108, 1112 and 1114 all on Fairway. Sand was placed around the poly pipe prior to backfill to help protect the pipe. Pipe placement ended at the Fairway and Deer intersection. Departed site 1730 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 6 50 72 08:00 18:00 C 900 DR18 160’ C 900 DR14 60’ Saddles and services run to 1111, 1117, 1121 (short) 1108, 1112, 1114 (long) all on Fairway The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Austin Vinciguerra was also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers The crew had 3 pipe fitters out sick, Thomas, Chris and Colin JVL____ Aggregate Base, Native 1117 Fairway Cinderlite Pit, Trench Spoils 1 3’ BFG 2 1’ BFG 125.7 113.9 6.0 7.2 10.1 11.5 132.6 119.6 95 95 95 90 2 1124 Fairway Troxler 3430 37748 08/18/21 Direct 2001 6 10 - - - - - - - - - - - - - - - - 10 6 Density 723Moisture DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/02/22 3004 63 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Plates being removed for start of excavation Existing utilities where the new pipe will go under Hydrant valve on the south side of the Blackwood and Fairway intersection where excavation will begin Mini excavator being used to dig out long side services DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/02/22 3004 64 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Attaching pipe to hydrant valve with restraint joint Tracer wire that is being taped to pipe and also run with the services More existing utilities where DR 14 will have to be used to go under sewer Trenching through asphalt to get away from existing water DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/02/22 3004 65 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Pot hole for existing utilities in front of the excavator Compaction efforts being performed by excavator with compaction wheel attached Tie in for water service at 1117 Fairway Steel plate being placed over open trench for the night DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/02/22 3004 66 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cold patch being placed along plates in roadway DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D