FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/02/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Vinciguerra crew (8)
acombes@stpud.us
jryan@stpud.us
6
50
72
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew moved back to Fairway to continue excavation. They started today on the south side of
the Blackwood and Fairway intersection at the hydrant valve that had been previously placed.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and went
south on Fairway where a Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The first piece of
pipe used today was the DR 14 as it was centered under the existing sewer. With the sewer lines nearer finish
grade it appeared that the contractor would have to switch between the 14 and the 18 depending on the situation.
There was a 5’ gap between the first 2 pipes today so the contractor can split the pressure testing and flushing in
half instead of trying to do it all in one shot. This had been agreed upon by Austin with Vinciguerra and Adrian with
STPUD.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, pipe placed on
top of it. The DR 14 is used in conjunction with bell restraints where we go under the sewer or where we are within
10’ of sewer mainline. They then placed base up to spring line and water jetted it to make sure there were no voids
under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers.
95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the
base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this
report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5%
moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in
this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would
be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction
efforts.
160’ of C900 DR 18 and 60’ of C900 DR 14 was placed along Fairway and backfilled along with 3 short and 3
long side services. The short services were located at 1111, 1117,and 1121 with the long side being located at
1108, 1112 and 1114 all on Fairway. Sand was placed around the poly pipe prior to backfill to help protect the pipe.
Pipe placement ended at the Fairway and Deer intersection.
Departed site 1730 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/02/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
6
50
72
08:00
18:00
C 900 DR18 160’
C 900 DR14 60’
Saddles and services run to 1111, 1117, 1121 (short) 1108, 1112, 1114 (long) all on Fairway
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Austin Vinciguerra was also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
The crew had 3 pipe fitters out sick, Thomas, Chris and Colin
JVL____
Aggregate Base, Native
1117 Fairway
Cinderlite Pit, Trench Spoils
1 3’ BFG
2 1’ BFG
125.7
113.9
6.0 7.2
10.1 11.5
132.6
119.6
95
95
95
90
2
1124 Fairway
Troxler 3430 37748 08/18/21
Direct
2001
6
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
6
Density
723Moisture
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/02/22 3004 63
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Plates being removed for start of excavation Existing utilities where the new pipe will go under
Hydrant valve on the south side of the Blackwood and
Fairway intersection where excavation will begin
Mini excavator being used to dig out long side services
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/02/22 3004 64
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Attaching pipe to hydrant valve with restraint joint Tracer wire that is being taped to pipe and also run with
the services
More existing utilities where DR 14 will have to be used to
go under sewer
Trenching through asphalt to get away from existing water
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/02/22 3004 65
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Pot hole for existing utilities in front of the excavator Compaction efforts being performed by excavator with
compaction wheel attached
Tie in for water service at 1117 Fairway Steel plate being placed over open trench for the night
DocuSign Envelope ID: 164DBFB2-070A-4BA9-B863-D2688B8ACD3D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/02/22 3004 66
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Cold patch being placed along plates in roadway