fr_3004_6-6-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/06/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 5 55 72 CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew moved back to Fairway to continue excavation. They started today on the north side of the Deer and Fairway intersection where they stopped yesterday. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and went east on Deer. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 340’ of C900 DR 18 and 20’ of C900 DR 14 was placed along Deer and backfilled along with 3 short and 4 long side services. The short services were located at 1135 Fairway, 3510, 3514 both on Deer, with the long sides being located at 3507, 3515, 3517, and 3523, all on Deer. Sand was placed around the poly pipe prior to backfill to help protect the pipe. Pipe placement ended across from 3523 Deer. A sewer lateral was hit at 3514 Deer, it was 4’ off the mark and repaired by the contractor. Saw cutting and lay out took place on Pinecrest, Vanda Lee, Osgood, Bowers, Larch and Forest. Departed site 1800 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 5 55 72 08:00 18:00 C 900 DR18 340’ C 900 DR14 20’ Saddles and services run to 1135 Fairway, 3510, 3514, Deer (short). 3507, 3515, 3517, 3523 (long) all on Deer The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, Boone and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site. Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers The hydrant “T” and valve were placed at 73+33 Rt Deer, it was not completed as concrete and drain rock need to be placed. JVL____ Aggregate Base, Native 3510 Deer Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 126.4 127.2 109.9 111.2 5.3 1’ BFG 1’ BFG 7.2 5.8 9.7 10.6 11.5 11.5 7.2 132.6 132.6 119.6 119.6 95 96 92 93 95 95 90 90 2 3514 Deer 3523 Deer Service 3514 Deer Troxler 3430 37748 08/18/21 Direct 2017 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 719Moisture DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 06/06/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Plate removal so crew can head east up Deer Saw cutter on-site both Bijou and Bowers projects Storm drain found on Deer approximately 10’ out of valve appeared to be abandoned, was left in place as crew worked around it Kicker poured at 3 way gate valve intersection of Deer and Fairway DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 06/06/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Repaired sewer pipe at 3514 Deer with DR 14 placed underneath Mole laid out for long side services Excavation of services follows placement of the mainline Looking for existing sewer lateral in trench DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 06/06/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Bolting pipe to hydrant prior to placement in trench Preparing to lift hydrant into place DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE