fr_3004_6-6-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/06/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Partly Cloudy/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
5
55
72
CME personnel arrived on-site of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew moved back to Fairway to continue excavation. They started today on the north side of
the Deer and Fairway intersection where they stopped yesterday.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and went
east on Deer. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed
on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we
are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were
no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack
whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry
density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be
found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and
11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be
found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that
90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for
compaction efforts.
340’ of C900 DR 18 and 20’ of C900 DR 14 was placed along Deer and backfilled along with 3 short and 4 long
side services. The short services were located at 1135 Fairway, 3510, 3514 both on Deer, with the long sides
being located at 3507, 3515, 3517, and 3523, all on Deer. Sand was placed around the poly pipe prior to backfill to
help protect the pipe. Pipe placement ended across from 3523 Deer.
A sewer lateral was hit at 3514 Deer, it was 4’ off the mark and repaired by the contractor.
Saw cutting and lay out took place on Pinecrest, Vanda Lee, Osgood, Bowers, Larch and Forest.
Departed site 1800 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
) DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR 1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/06/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
5
55
72
08:00
18:00
C 900 DR18 340’
C 900 DR14 20’
Saddles and services run to 1135 Fairway, 3510, 3514, Deer (short). 3507, 3515, 3517, 3523 (long) all on Deer
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also on-site.
Equipment on-site- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
The hydrant “T” and valve were placed at 73+33 Rt Deer, it was not completed as concrete and drain rock need
to be placed.
JVL____
Aggregate Base, Native
3510 Deer
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
126.4
127.2
109.9
111.2
5.3
1’ BFG
1’ BFG
7.2
5.8
9.7
10.6
11.5
11.5
7.2
132.6
132.6
119.6
119.6
95
96
92
93
95
95
90
90
2
3514 Deer
3523 Deer Service
3514 Deer
Troxler 3430 37748 08/18/21
Direct
2017
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
719Moisture
DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
06/06/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Plate removal so crew can head east up Deer Saw cutter on-site both Bijou and Bowers projects
Storm drain found on Deer approximately 10’ out of valve
appeared to be abandoned, was left in place as crew
worked around it
Kicker poured at 3 way gate valve intersection of Deer and
Fairway
DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
06/06/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Repaired sewer pipe at 3514 Deer with DR 14 placed
underneath
Mole laid out for long side services
Excavation of services follows placement of the mainline Looking for existing sewer lateral in trench
DocuSign Envelope ID: E1225A0F-4795-49CD-87BF-06C3CEA3B8BE
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
06/06/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Bolting pipe to hydrant prior to placement in trench
Preparing to lift hydrant into place