fr_3004_6-7-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/07/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
6
47
72
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew moved back to Deer to continue excavation. They started today at 3522 Deer.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued east on Deer. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed
on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we
are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were
no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack
whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry
density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be
found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and
11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be
found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that
90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for
compaction efforts.
180’ of C900 DR 18 and 20’ of C900 DR 14 was placed along Deer and backfilled along with 3 short and 3 long
side services. The short services were located at 3528, 3532, and 3538 all on Deer, with the long sides being
located at 3527, 3533 on Deer and 1124 Glenwood. Sand was placed around the poly pipe prior to backfill to help
protect the pipe. Pipe placement ended at intersection of Deer and Glenwood. 60’ of DR 18 was placed on
Fairway in front of 1161. The crew moved there when the service was hit.
Departed site 1800 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/07/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
6
47
72
08:00
18:00
C 900 DR18 240’ (60’ on Fairway)
C 900 DR14 20’
Saddles and services run to 3528, 3532, 3538 (short) 3527, 3533 (long) Deer, and 1124 Glenwood (long)
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
Sewer lateral was hit at 3528 Deer, 5.5’ off mark, contractor fixed and continued.
The water service for 1134 Fairway was also hit today. It was another one that came out the east side and ran
to a house on the west side. STPUD was called and arrived and shut off the water and repaired the service. The
water was shut down approximately 1 hour and 45 minutes.
The mole also got stuck in its attempt to do the service for 1124 Glenwood. It made its way through but on the
way back with the poly attached it got stuck. A hole was cut in the street at the sticking point and it was found that it
was a root that was preventing it from being pulled back. The root was cut out and poly placed and backfilled.
JVL____
Aggregate Base, Native
3528 Deer
Cinderlite Pit, Trench Spoils
1
3
4
5
3’ BFG
2 3’ BFG
3’ BFG
125.6
126.7
110.4
112.6
126.1
5.2
1’ BFG
1’ BFG
7.2
5.4
9.8
9.5
5.5
11.5
11.5
7.2
7.2
132.6
132.6
119.6
119.6
132.6
95
96
92
94
95
95
95
90
90
95
2
3532 Deer
3532 Deer
3538 Deer
1161 Fairway
Troxler 3430 37748 08/18/21
Direct
2005
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
720Moisture
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/07/22 3004 63
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Backfilled services waiting for new line to be put into
service
Material being loaded for off haul and processing
Plates being removed for start of excavation Concrete kicker poured at hydrant station 73+33 Rt Deer
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/07/22 3004 64
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Concrete being mixed for kicker The hit service at 1134 Fairway
Section of base that had been water jetted Mark in line with service but crew was unaware that it
came out on east side of main for house on west side of
street
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/07/22 3004 65
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
STPUD vac truck onsite to assist with leak Section pulled out of main it appeared to come out
approximately 1’ before turning back under main
End of the run at Deer and Glenwood Cap placed into section that ran under main and into
meter
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/07/22 3004 66
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Section of trench opened on Fairway, it’s where the
excavator moved after hitting service
Service reattached by STPUD still travels from east to
west under the main
Section of root that the mole went through but could not
be pulled back with poly
Compaction efforts on services
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E