Loading...
fr_3004_6-8-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/08/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 6 53 72 CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew moved back to Deer to continue excavation. They started today at 1135 Fairway, where service break had stopped them yesterday. The excavation ended at 1161 Fairway where they will continue in the morning. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued south on Fairway. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 240’ of C900 DR 18 and 60’ of C900 DR 14 was placed along Fairway and backfilled along with 3 short and 3 long side services. The short services were located at 1139, 1145 Fairway and 3501 Pinecrest, with the long sides being located at 1134, 1140, 1144 Fairway. The long service at 1150 Fairway was met with refusal, it will have to be saw cut and dug out. Sand was placed around the poly pipe prior to backfill to help protect the pipe. The contractor hopes to use the existing poly on the short side services, waiting for answer from Adrian with STPUD. A fire hydrant was set at station 23+13 Lt Fairway, but was not completed as drain rock and a kicker on the hydrant are still needed. The valve cluster at 5he intersection of Fairway and Pine rest was also set but also needs kickers. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by FIELD DENSITY SUMMARY 7HVW 1R 0DWHULDO'HVFULSWLRQ(OHYDWLRQ  ,Q3ODFH 'U\ 'HQVLW\ 3&)  ,Q3ODFH 0RLVWXUH &RQWHQW   2SWLPXP 0RLVWXUH &RQWHQW   0D[LPXP 'U\ 'HQVLW\ 3&)  ,Q3ODFH &RPSDFWLRQ   6SHFLILHG 5HODWLYH &RPSDFWLRQ 0LQ 0DWHULDO6RXUFH )* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ 3DJHRI *DXJH,QIR 6RLOV'HQVLW\5HVXOWV 0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW  0HWKRGRI0HDVXUHPHQW 0DNH 5HODWLYH7HVW 'HSWK LQ  6WG&RXQW  06/08/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 6 53 72 08:00 18:00 C 900 DR18 240’ C 900 DR14 60’ Two 45 degree fittings were utilized to connect the pipe that had been placed on Fairway yesterday and today the connection occurred at 1161 Fairway where they will take off tomorrow. Saddles and services run to 1134, 1140, 1144 Fairway (long), the short services were located at 1145, 1139, Fairway and 3501 Pinecrest. The contractor hopes to connect the short side services when tie in is completed and they can cut the existing poly pipe and feed that into their saddle. The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, Boone and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers Sewer lateral was hit at 1144 Fairway 6.5’off mark, contractor fixed and continued. The fire hydrant was set at station 23+13 Lt Fairway with the kicker poured but no drain rock or fabric placed. A valve cluster of 3, 8” gate valves was also set, this at station 23+67 Lt Fairway this was plated and will receive kickers tomorrow. JVL____ Aggregate Base, Native 1135 Fairway Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 125.9 126.6 110.8 113.2 5.3 1’ BFG 1’ BFG 7.2 5.5 10.1 9.8 11.5 11.5 7.2 132.6 132.6 119.6 119.6 95 95 93 95 95 95 90 90 2 1145 Fairway 1145 Fairway 3501 Pinecrest Troxler 3430 37748 08/18/21 Direct 2018 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 721Moisture DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/08/22 3004 63 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Exposing mainline so it can flushed and pipe can continue South on Fairway Finding the water service to ensure that it isn’t a back side connection Crew pot holing prior to begin excavation STPUD vac truck being used to clean up during flush DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/08/22 3004 64 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Pipe after flush, Adrian with STPUD gave the ok to continue laying the pipe Sewer repaired at 1144 Fairway after being hit digging service pit, it was 6.5’ off mark Pipe being beveled after cut to allow a DR 14 to be centered under sewer Sewer that was hit and replaced at 1144 Fairway, 6.5’ off mark DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/08/22 3004 65 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Working between hydrant and valve to place new waterline 2 whackers working on the aggregate base 1’ pipe Bell restraint placed on DR 14, both sides Hydrant valve being set at station 23+13 Lt Fairway DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/08/22 3004 66 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Valve cluster being set at station 23+67 Lt Fairway Asphalt being picked up intersection of Pinecrest and Fairway Concrete being for kicker at hydrant at 23+13 Lt Fairway Valve riser being cut for hydrant DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E