FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/08/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
6
53
72
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew moved back to Deer to continue excavation. They started today at 1135 Fairway, where
service break had stopped them yesterday. The excavation ended at 1161 Fairway where they will continue in the
morning.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued south on Fairway. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed
on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we
are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were
no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack
whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry
density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be
found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and
11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be
found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that
90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for
compaction efforts.
240’ of C900 DR 18 and 60’ of C900 DR 14 was placed along Fairway and backfilled along with 3 short and 3
long side services. The short services were located at 1139, 1145 Fairway and 3501 Pinecrest, with the long sides
being located at 1134, 1140, 1144 Fairway. The long service at 1150 Fairway was met with refusal, it will have to be
saw cut and dug out. Sand was placed around the poly pipe prior to backfill to help protect the pipe. The
contractor hopes to use the existing poly on the short side services, waiting for answer from Adrian with STPUD.
A fire hydrant was set at station 23+13 Lt Fairway, but was not completed as drain rock and a kicker on the
hydrant are still needed. The valve cluster at 5he intersection of Fairway and Pine rest was also set but also needs
kickers.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/08/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
6
53
72
08:00
18:00
C 900 DR18 240’
C 900 DR14 60’
Two 45 degree fittings were utilized to connect the pipe that had been placed on Fairway yesterday and today
the connection occurred at 1161 Fairway where they will take off tomorrow.
Saddles and services run to 1134, 1140, 1144 Fairway (long), the short services were located at 1145, 1139,
Fairway and 3501 Pinecrest. The contractor hopes to connect the short side services when tie in is completed and
they can cut the existing poly pipe and feed that into their saddle.
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, Boone and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
Sewer lateral was hit at 1144 Fairway 6.5’off mark, contractor fixed and continued.
The fire hydrant was set at station 23+13 Lt Fairway with the kicker poured but no drain rock or fabric placed. A
valve cluster of 3, 8” gate valves was also set, this at station 23+67 Lt Fairway this was plated and will receive
kickers tomorrow.
JVL____
Aggregate Base, Native
1135 Fairway
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
125.9
126.6
110.8
113.2
5.3
1’ BFG
1’ BFG
7.2
5.5
10.1
9.8
11.5
11.5
7.2
132.6
132.6
119.6
119.6
95
95
93
95
95
95
90
90
2
1145 Fairway
1145 Fairway
3501 Pinecrest
Troxler 3430 37748 08/18/21
Direct
2018
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
721Moisture
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/08/22 3004 63
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Exposing mainline so it can flushed and pipe can continue
South on Fairway
Finding the water service to ensure that it isn’t a back side
connection
Crew pot holing prior to begin excavation STPUD vac truck being used to clean up during flush
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/08/22 3004 64
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Pipe after flush, Adrian with STPUD gave the ok to
continue laying the pipe
Sewer repaired at 1144 Fairway after being hit digging
service pit, it was 6.5’ off mark
Pipe being beveled after cut to allow a DR 14 to be
centered under sewer
Sewer that was hit and replaced at 1144 Fairway, 6.5’ off
mark
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/08/22 3004 65
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Working between hydrant and valve to place new
waterline
2 whackers working on the aggregate base 1’ pipe
Bell restraint placed on DR 14, both sides Hydrant valve being set at station 23+13 Lt Fairway
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/08/22 3004 66
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Valve cluster being set at station 23+67 Lt Fairway Asphalt being picked up intersection of Pinecrest and
Fairway
Concrete being for kicker at hydrant at 23+13 Lt Fairway Valve riser being cut for hydrant