fr_3004_6-9-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/09/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 5 57 77 CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew moved to Pinecrest and headed east. They also continued down Fairway towards Glenwood. The excavation ended at 1175 Fairway where they will continue in the morning. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued south on Fairway. The crew also went east on Pinecrest placing DR 14 due to proximity to existing sewer. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 140’ of C900 DR 18 and 40’ C900 DR 14 was placed along Fairway and backfilled along with 1 short and 4 long side services. The short service was located at 1175 Fairway, with the long sides being located at 1154, 1158, 1160 and 1162 Fairway. Sand was placed around the poly pipe prior to backfill to help protect the pipe. The contractor also placed 47’ of DR 14 on Pinecrest (87’ total of DR 14) where a testing cap was placed and will be tied into existing after testing. Departed site 1830 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 5 57 77 08:00 18:00 C 900 DR18 140’ C 900 DR14 47’ (on Pinecrest) 40’ on Fairway 87’ total Saddles and services run to 1154, 1158, 1160, and 1162 Fairway (long), the short service was located at 1175 Fairway. A sewer lateral was hit at 1175 Fairway, contractor fixed and moved on. A 45 degree fitting was used to help get the pipe headed east on Fairway where the road bends. The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers JVL____ Aggregate Base, Native Pinecrest 35’ East of Valves Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 127.0 127.8 111.6 117.5 5.6 1’ BFG 1’ BFG 7.2 6.0 9.8 10.0 11.5 11.5 7.2 132.6 132.6 119.6 119.6 96 96 93 94 95 95 90 90 2 1175 Fairway 1161 Fairway 1175 Fairway Troxler 3430 37748 08/18/21 Direct 2000 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 720Moisture DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/09/22 3004 53 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Asphalt being stripped away on Pinecrest Saw cut being performed at 1150 Fairway where the mole had refusal the previous day Asphalt also being stripped away along Fairway Water that was puddled prior any trenching in the area 1189 Fairway DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/09/22 3004 54 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Another angle in case they try to say the contractor caused it, 1189 Fairway Mole again being used for long side services DR 14 being placed on Pinecrest Compaction efforts on Pinecrest DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/09/22 3004 55 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Leaving the flow line alone at 1160 Fairway Sewer lateral that fixed at 1175 Fairway The mole running in reverse as it pulls the poly under the asphalt DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E