fr_3004_6-9-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/09/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
5
57
77
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew moved to Pinecrest and headed east. They also continued down Fairway towards
Glenwood. The excavation ended at 1175 Fairway where they will continue in the morning.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued south on Fairway. The crew also went east on Pinecrest placing DR 14 due to proximity to existing
sewer. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed
on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we
are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were
no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack
whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry
density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be
found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and
11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be
found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that
90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for
compaction efforts.
140’ of C900 DR 18 and 40’ C900 DR 14 was placed along Fairway and backfilled along with 1 short and 4 long
side services. The short service was located at 1175 Fairway, with the long sides being located at 1154, 1158, 1160
and 1162 Fairway. Sand was placed around the poly pipe prior to backfill to help protect the pipe. The contractor
also placed 47’ of DR 14 on Pinecrest (87’ total of DR 14) where a testing cap was placed and will be tied into
existing after testing.
Departed site 1830 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/09/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
5
57
77
08:00
18:00
C 900 DR18 140’
C 900 DR14 47’ (on Pinecrest) 40’ on Fairway 87’ total
Saddles and services run to 1154, 1158, 1160, and 1162 Fairway (long), the short service was located at 1175
Fairway.
A sewer lateral was hit at 1175 Fairway, contractor fixed and moved on.
A 45 degree fitting was used to help get the pipe headed east on Fairway where the road bends.
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Wayne and Casey Vinciguerra were also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
JVL____
Aggregate Base, Native
Pinecrest 35’ East of Valves
Cinderlite Pit, Trench Spoils
1
3
4
3’ BFG
2 3’ BFG
127.0
127.8
111.6
117.5
5.6
1’ BFG
1’ BFG
7.2
6.0
9.8
10.0
11.5
11.5
7.2
132.6
132.6
119.6
119.6
96
96
93
94
95
95
90
90
2
1175 Fairway
1161 Fairway
1175 Fairway
Troxler 3430 37748 08/18/21
Direct
2000
6
6
10
10
-
-
-
-
-
- -
-
-
-
-
-
10
10
6
6
Density
720Moisture
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/09/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Asphalt being stripped away on Pinecrest Saw cut being performed at 1150 Fairway where the mole
had refusal the previous day
Asphalt also being stripped away along Fairway Water that was puddled prior any trenching in the area
1189 Fairway
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/09/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Another angle in case they try to say the contractor
caused it, 1189 Fairway
Mole again being used for long side services
DR 14 being placed on Pinecrest Compaction efforts on Pinecrest
DocuSign Envelope ID: DF2C81D7-AD48-417F-9F82-1F774C88721E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/09/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Leaving the flow line alone at 1160 Fairway Sewer lateral that fixed at 1175 Fairway
The mole running in reverse as it pulls the poly under the
asphalt