fr_3004_6-13-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/13/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 4 51 63 CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew continued on Fairway and headed east toward Glenwood. The excavation began at 1189 Fairway and ended at 1213 Fairway. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued south on Fairway. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 240’ of C900 DR 18, 40’ of C900 DR 14 was placed along Fairway and backfilled along with 4 short and 3 long side services. The short services was located at 1193, 1197, 1201, 1213 Fairway, with the long sides being located at 1190, 1198, and 1202 Fairway. Sand was placed around the poly pipe prior to backfill to help protect the pipe. Also transported to the CME laboratory a set of grout cylinders from the Keller tank site that had been taken by Garth with STPUD. The set of 4, 4x8” cylinders were transported, stripped, logged and placed in a climate controlled room to await testing. Departed site 1830 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 2FA200C4-6131-40BD-8E41-DBDC8456C0F0 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 4 51 63 08:00 18:00 C 900 DR18 240’ C 900 DR14 40 Saddles and services run to The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Casey Vinciguerra was also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers 240’ of DR 18 was placed along with 40’ of DR 14 were placed today with the DR 14 being centered under 2 sewer laterals. 7 services were installed today 4 short and 3 long. The short services were located at 1193, 1197, 1201, and 1213 with the lions ones located at 1190. 1198 and 1202 all on Fairway. Sewer laterals were hit and fixed at 1193 and 1213 Fairway. Pin hole leaks were discovered in existing water services at 1193 and 1205 Fairway when excavated. STPUD was called and Herb arrived onsite and was able to temporarily fix both. The temporary fix was appropriate as the system will be tied over to new main and services with in a couple of weeks. JVL____ Aggregate Base, Native 1197 Fairway Cinderlite Pit, Trench Spoils 1 3 4 3’ BFG 2 3’ BFG 126.0 126.8 109.3 112.0 6.2 1’ BFG 1’ BFG 7.2 7.2 9.6 10.2 11.5 11.5 7.2 132.6 132.6 119.6 119.6 95 96 91 94 95 95 90 90 2 1201 Fairway 1197 Fairway 1205 Fairway Troxler 3430 37748 08/18/21 Direct 2003 6 6 10 10 - - - - - - - - - - - - 10 10 6 6 Density 723Moisture DocuSign Envelope ID: 2FA200C4-6131-40BD-8E41-DBDC8456C0F0 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/13/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Plates being removed from existing trench Sewer lateral that was fixed at 1193 Fairway Base being dumped for later use Looking for existing utilities in front of excavator DocuSign Envelope ID: 2FA200C4-6131-40BD-8E41-DBDC8456C0F0 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/13/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Excavators working, one in trench and one on services Water meters that will be tied into Pin hole leak that was fixed by STPUD Sewer lateral that was fixed at 1213 Fairway DocuSign Envelope ID: 2FA200C4-6131-40BD-8E41-DBDC8456C0F0