fr_3004_6-15-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
06/15/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
Vinciguerra crew (9)
acombes@stpud.us
jryan@stpud.us
4
53
80
CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on
Fairway at 8:00am as crew continued on Fairway and headed east toward Glenwood. The excavation today began
at 3533 Blackwood and ended in the Glenwood intersection. The crew also worked in the Deer and Glenwood
intersection extending the pipe closer to the tie in on the east side of Glenwood.
The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and
continued on Fairway. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe.
The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed
on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we
are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were
no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack
whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry
density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be
found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and
11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be
found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that
90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for
compaction efforts.
146’ of C900 DR 18, was placed, 112’ on Blackwood and 34’ on Deer and was backfilled along with 4 short and
3 long side services. The short services was located at 1112 Glenwood, and 3519, 3511, 3507, and Cloverdale
with the long sides being located at 3533 Blackwood and 3524, 3514 Cloverdale.
The AT&T line was located in the Blackwood intersection 15” below top of asphalt. The mainline water was
looked for at both excavations but was not found. A call was made to James Cullen with STPUD and a message
was left asking if we could get a locate on the 6” main. Received a call back and was told they could come by in
the morning.
Departed site 1800 as crew continued clean up.
JVL____
08:00 AM
PM18:00
DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
06/15/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Clear/Calm
acombes@stpud.us
jryan@stpud.us
4
53
80
08:00
18:00
C 900 DR18 146’ 112 on Blackwood, 34’ on Deer
C 900 DR14
Services- 7
The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin,
Morgan, Sergio, and Alex underground utility pipe fitters. Casey Vinciguerra was also onsite.
Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D
skid steer, 4 10 wheelers
146’ of DR 18 was placed today between Blackwood and Deer into intersection with Glenwood. 5 services
were installed today 4 short and 3 long. The short services were located at 1112 Glenwood, 3519, 3511, 3507
Cloverdale, with the long ones located at 3533 Blackwood, 3524, 3514 Cloverdale.
Base was used for backfill all the way up today as we were in heavy traffic areas.
1 set of 3, 4x8” grout cylinders were transported to the laboratory where they will be logged, stripped and placed
into a climate controlled room to await testing. The cylinders were taken by Garth with STPUD who requested
breaks 1 at 2 days, 1 at 7 days and 1 at 28 days.
JVL____
Aggregate Base, Native
3534 Blackwood
Cinderlite Pit, Trench Spoils
1
3
4
5
3’ BFG
2 3’ BFG
1’ BFG
127.9
126.6
126.9
128.5
128.2
5.0
3’ BFG
1’ BFG
7.2
6.2
5.4
6.1
5.9
7.2
7.2
7.2
7.2
132.6
132.6
132.6
132.6
132.6
96
95
96
97
97
95
95
95
90
90
2
Intersection of Blackwood and Glenwood
Intersection of Deer and Glenwood
Intersection of Blackwood and Glenwood
Intersection of Deer and Glenwood
Troxler 3430 37748 08/18/21
Direct
2014
6
6
6
10
10
-
-
-
-
- -
-
-
-
-
10
10
6
6
6
Density
721Moisture
DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/15/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Unloading pipe where needed Asphalt being removed from intersection of Blackwood
and Glendwood
Pipe being placed into trench on Blackwood AT&T line found in Blackwood and Glenwood intersection
15” below asphalt
DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
06/15/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Working on riser out of test cap Compaction efforts at Blackwood and Glenwood
intersection
Water jetted base at intersection of Deer and Glenwood Compaction efforts in the intersection of Deer and
Glenwood