Loading...
fr_3004_6-15-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 06/15/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm Vinciguerra crew (9) acombes@stpud.us jryan@stpud.us 4 53 80 CME personnel arrived onsite of the Bijou waterline replacement project in South Lake Tahoe. Arrived on Fairway at 8:00am as crew continued on Fairway and headed east toward Glenwood. The excavation today began at 3533 Blackwood and ended in the Glenwood intersection. The crew also worked in the Deer and Glenwood intersection extending the pipe closer to the tie in on the east side of Glenwood. The Vinciguerra crew (1 operator, Jim and 9 Underground Utility Pipe Fitters, 1 Truck Driver) arrived and continued on Fairway. A Cat 314C was used to dig the trench for the new 8” C 900 water pipe. The crew placed 6” of aggregate base to be used as bedding under the C900 DR 18 or DR14, with pipe placed on top of it. The DR 14 is used in conjunction with bell restraints where we center it under the sewer or where we are within 10’ of sewer mainline. They then placed base up to spring line and water jet it to make sure there were no voids under the pipe. 1’ of aggregate base was then placed over the pipe and compacted by jumping jack whackers. 95% of the maximum dry density is required on base and testing was performed. The maximum dry density of the base is a 132.6 at 7.2% moisture as provided by CME on 5-18-22. The results of the testing can be found in this report. The native material that was placed was also tested using a 119.6 maximum dry density and 11.5% moisture. These numbers were also provided by the CME laboratory. Results for this testing can also be found in this report. Although the the specifications call for 95% had been informed by Adrian with STPUD that 90% would be satisfactory on the intermediate backfill. A compaction wheel attached to an excavator was used for compaction efforts. 146’ of C900 DR 18, was placed, 112’ on Blackwood and 34’ on Deer and was backfilled along with 4 short and 3 long side services. The short services was located at 1112 Glenwood, and 3519, 3511, 3507, and Cloverdale with the long sides being located at 3533 Blackwood and 3524, 3514 Cloverdale. The AT&T line was located in the Blackwood intersection 15” below top of asphalt. The mainline water was looked for at both excavations but was not found. A call was made to James Cullen with STPUD and a message was left asking if we could get a locate on the 6” main. Received a call back and was told they could come by in the morning. Departed site 1800 as crew continued clean up. JVL____ 08:00 AM PM18:00 DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504 '$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Clear/Calm acombes@stpud.us jryan@stpud.us 4 53 80 08:00 18:00 C 900 DR18 146’ 112 on Blackwood, 34’ on Deer C 900 DR14 Services- 7 The Vinciguerra crew consisted of Jim, operator, Art, Thomas, Chris, Dave, Arron, Chris, and Kieth, Colin, Morgan, Sergio, and Alex underground utility pipe fitters. Casey Vinciguerra was also onsite. Equipment onsite- 2 Cat 314C excavators, Cat 304E mini excavator, John Deere 210 skip loader, Cat 299D skid steer, 4 10 wheelers 146’ of DR 18 was placed today between Blackwood and Deer into intersection with Glenwood. 5 services were installed today 4 short and 3 long. The short services were located at 1112 Glenwood, 3519, 3511, 3507 Cloverdale, with the long ones located at 3533 Blackwood, 3524, 3514 Cloverdale. Base was used for backfill all the way up today as we were in heavy traffic areas. 1 set of 3, 4x8” grout cylinders were transported to the laboratory where they will be logged, stripped and placed into a climate controlled room to await testing. The cylinders were taken by Garth with STPUD who requested breaks 1 at 2 days, 1 at 7 days and 1 at 28 days. JVL____ Aggregate Base, Native 3534 Blackwood Cinderlite Pit, Trench Spoils 1 3 4 5 3’ BFG 2 3’ BFG 1’ BFG 127.9 126.6 126.9 128.5 128.2 5.0 3’ BFG 1’ BFG 7.2 6.2 5.4 6.1 5.9 7.2 7.2 7.2 7.2 132.6 132.6 132.6 132.6 132.6 96 95 96 97 97 95 95 95 90 90 2 Intersection of Blackwood and Glenwood Intersection of Deer and Glenwood Intersection of Blackwood and Glenwood Intersection of Deer and Glenwood Troxler 3430 37748 08/18/21 Direct 2014 6 6 6 10 10 - - - - - - - - - - 10 10 6 6 6 Density 721Moisture DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/15/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Unloading pipe where needed Asphalt being removed from intersection of Blackwood and Glendwood Pipe being placed into trench on Blackwood AT&T line found in Blackwood and Glenwood intersection 15” below asphalt DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 06/15/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Working on riser out of test cap Compaction efforts at Blackwood and Glenwood intersection Water jetted base at intersection of Deer and Glenwood Compaction efforts in the intersection of Deer and Glenwood DocuSign Envelope ID: 7CB90EC4-4E49-4163-9F48-2F5CDD142504