fr_3004_8-22-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 08/22/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew acombes@stpud.us jryan@stpud.us 3 62 85 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects. Arrived onsite at 8:00am and looked for the crew, looked on both projects, Bijou and Bowers but found them in the yard awaiting instructions. They went to Fairway and began to jack hammer and mini excavator to dig out the smaller AC patches where the water services were tied in. They also used the jack hammer to remove the AC at the intersection of Pine Crest and Fairway where the TRI valve cluster was located. The AC was removed so concrete could be placed at a later time. A couple of sections of asphalt also looked like they were missed the first time when marks were placed. They were located at 1205 Fairway and 3528 Ferndale. The asphalt will have to be removed and replaced the next time asphalt is ordered. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/22/22 3004 32 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Crew working patch areas on Fairway Cleaning up patch areas on Deer Preparing to saw cut for patch on Fairway Area that needs to be repaved on Ferndale DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/22/22 3004 33 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Hammering out 3 valve cluster on Pine Crest Cleaning out valves on Vanda Lee at intersection with Betty Rae DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926