Loading...
fr_3004_8-24-22'$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ)DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by FIELD DENSITY SUMMARY 7HVW 1R 0DWHULDO'HVFULSWLRQ(OHYDWLRQ  ,Q3ODFH 'U\ 'HQVLW\ 3&)  ,Q3ODFH 0RLVWXUH &RQWHQW   2SWLPXP 0RLVWXUH &RQWHQW   0D[LPXP 'U\ 'HQVLW\ 3&)  ,Q3ODFH &RPSDFWLRQ   6SHFLILHG 5HODWLYH &RPSDFWLRQ 0LQ 0DWHULDO6RXUFH )* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ 3DJHRI *DXJH,QIR 6RLOV'HQVLW\5HVXOWV 0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW  0HWKRGRI0HDVXUHPHQW 0DNH 5HODWLYH7HVW 'HSWK LQ  6WG&RXQW  08/24/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm acombes@stpud.us jryan@stpud.us 4 56 85 08:00 17:00 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects. Arrived onsite at 8:00am and found that the Vinciguerra crew was switching gears and were planning on placing asphalt in the areas that had dug out in front of services and also driveways that had not been replaced. The contractor also planned on putting the top lift on Osgood. Asphalt arrived onsite at approximately 11:10am and the began to place the top lift of Osgood. The surface had been cleaned and completely tacked prior to the placement of the mix. The Vinciguerra crew was using a paver this time to help speed up the paving. The crew also paved driveways at 1121 and 1205 Fairway. The bottom lift was placed in the driveway at 1117 Fairway. Tahoe Asphalt produced 47.27 tons of product ID # 2000 1/2” HMA that the contractor trucked to site. The mix arrived onsite with a temperature of approximately 270 degrees as it was being placed. Density testing was performed at 1121 Fairway with satisfactory results and the contractor was notified and the results can also be seen in this report. JVL____ Aggregate Base, Native 1121 Fairway (Driveway) Cinderlite Pit, Trench Spoils 1 FBC 128.9 6.5 7.2 132.6 97 95 1 Troxler 3430 37748 08/18/21 Direct 6 - - - - - - - - - - - - - - - - - - 6 Density Moisture DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/24/22 3004 42 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Compaction efforts being performed on a patch to be paved in front of water meter Tack coat being applied to Osgood Prepping the driveway for paving at 1121 Fairway Edges of Osgood with tack applied DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/24/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Driveway being tacked at 1121 Fairway Dual steel drum roller being used for compaction efforts on top lift of Osgood Paver being used for top lift on Osgood Mix being dumped into paver DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/24/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Driveway being paved back at 1121 Fairway Vibra plate whacker being used where roller could not reach DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926