fr_3004_8-24-22'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
08/24/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
4
56
85
08:00
17:00
CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on
the Bowers and Bijou waterline replacement projects.
Arrived onsite at 8:00am and found that the Vinciguerra crew was switching gears and were planning on placing
asphalt in the areas that had dug out in front of services and also driveways that had not been replaced. The
contractor also planned on putting the top lift on Osgood.
Asphalt arrived onsite at approximately 11:10am and the began to place the top lift of Osgood. The surface had
been cleaned and completely tacked prior to the placement of the mix. The Vinciguerra crew was using a paver
this time to help speed up the paving. The crew also paved driveways at 1121 and 1205 Fairway. The bottom lift
was placed in the driveway at 1117 Fairway.
Tahoe Asphalt produced 47.27 tons of product ID # 2000 1/2” HMA that the contractor trucked to site. The mix
arrived onsite with a temperature of approximately 270 degrees as it was being placed.
Density testing was performed at 1121 Fairway with satisfactory results and the contractor was notified and the
results can also be seen in this report.
JVL____
Aggregate Base, Native
1121 Fairway (Driveway)
Cinderlite Pit, Trench Spoils
1 FBC 128.9 6.5 7.2 132.6 97 95
1
Troxler 3430 37748 08/18/21
Direct
6
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
6
Density
Moisture
DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/24/22 3004 42
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Compaction efforts being performed on a patch to be
paved in front of water meter
Tack coat being applied to Osgood
Prepping the driveway for paving at 1121 Fairway Edges of Osgood with tack applied
DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/24/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Driveway being tacked at 1121 Fairway Dual steel drum roller being used for compaction efforts
on top lift of Osgood
Paver being used for top lift on Osgood Mix being dumped into paver
DocuSign Envelope ID: 9D0BB23E-14F9-4C83-8BF7-57877C518926
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/24/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Driveway being paved back at 1121 Fairway
Vibra plate whacker being used where roller could not
reach