Loading...
fr_3004_8-29-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 08/29/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew acombes@stpud.us jryan@stpud.us 4 50 80 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects. Arrived onsite at 8:00am and found that the Vinciguerra crew was jackhammering out valves on both the Bijou and Bowers projects with a pour tentatively scheduled for tomorrow afternoon. A couple of crew members were working on raising the remaining hydrants that needed to be brought up to grade. The hydrants being raised today were the ones that needed to be brought up 12”, the 6” ones had been done previously. Taylor with STPUD came to site and began to measure up paving quantities, he worked mostly on Fairway today. The patch at 3520 Cloverdale was prepped for paving as the cars were not in the way. It is still uncertain when paving will take place. At the Cold Creek project the Haen crew continued to pot hole. The high pressure gas was located on the mark and 3’ BFG, the gas service was on the mark 29” BFG. They also found the water service that started on the mark and moved parallel to the trench before crossing it. They plan to begin excavation tomorrow. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/29/22 3004 42 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Laying out trench line at the Cold Creek project Asphalt Zipper cleaning trench line Material being stockpiled for Cold Creek project Trench outline left behind by asphalt zipper DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/29/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Preparing hydrant extension Fairway and Cloverdale Valve box set at hydrant on Fairway 12” hydrant extension Jackhammering out valve on Vanda Lee DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 08/29/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Vacuum truck being used to pot hole on Cold Creek Gas service exposed on Cold Creek DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165