FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
08/29/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Adrian w/STPUD, Vinciguerra crew
acombes@stpud.us
jryan@stpud.us
4
50
80
CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on
the Bowers and Bijou waterline replacement projects.
Arrived onsite at 8:00am and found that the Vinciguerra crew was jackhammering out valves on both the Bijou
and Bowers projects with a pour tentatively scheduled for tomorrow afternoon. A couple of crew members were
working on raising the remaining hydrants that needed to be brought up to grade. The hydrants being raised today
were the ones that needed to be brought up 12”, the 6” ones had been done previously.
Taylor with STPUD came to site and began to measure up paving quantities, he worked mostly on Fairway
today.
The patch at 3520 Cloverdale was prepped for paving as the cars were not in the way. It is still uncertain when
paving will take place.
At the Cold Creek project the Haen crew continued to pot hole. The high pressure gas was located on the mark
and 3’ BFG, the gas service was on the mark 29” BFG. They also found the water service that started on the mark
and moved parallel to the trench before crossing it. They plan to begin excavation tomorrow.
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/29/22 3004 42
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Laying out trench line at the Cold Creek project Asphalt Zipper cleaning trench line
Material being stockpiled for Cold Creek project Trench outline left behind by asphalt zipper
DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/29/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Preparing hydrant extension Fairway and Cloverdale Valve box set at hydrant on Fairway
12” hydrant extension Jackhammering out valve on Vanda Lee
DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/29/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Vacuum truck being used to pot hole on Cold Creek
Gas service exposed on Cold Creek
DocuSign Envelope ID: 1530D28F-935A-4D1C-AB1B-A5572661B165