FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
08/31/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Adrian w/STPUD, Vinciguerra crew Andy and Haen crew
acombes@stpud.us
jryan@stpud.us
5
53
80
CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on
the Bowers and Bijou waterline replacement projects.
Arrived onsite at 8:00am and found that the Vinciguerra crew continued to prep for asphalt placement along
with prepping for concrete pour as well.
Tahoe Asphalt made 4.46 tons of product ID # 2000 1/2” HMA that the contractor trucked to the site for
placement. The mix was placed at various locations on the 2 projects. Driveways and meter patches were paved.
The contractor also worked to raise the remaining valves as they are hoping for concrete today. Sierra Tahoe
Ready Mix delivered 5 yards of D70AC a 4000 psi mix to the site to be placed as valve collars. A total of 20 were
poured on the projects, the locations can be found in this report.
The contractor also placed the last service today as he tied in the service at the intersection of Forest and
Bowers. This service supplies the TRI Plex on Shirley.
A walk through was performed with Adrian from STPUD on the Bowers side of the project to prepare a punch
list for the contractor. A list had been requested by the contractor so they could get started on it.
Taylor with STPUD came to site and began to measure up paving quantities, he worked mostly on the Bowers
side today.
At the Cold Creek project the Haen crew continued the excavation for the new 8” PVC waterline. They started
approximately 8’ west of the high pressure gas line that runs along Pioneer Trail north/south with the new water
running west of Pioneer Trail.
The crew was using a Cat 315F excavator for trench and had a Cat 928 G loader that used in the backfill
process. The trench spoils were deemed unfit to be used as backfill and were trucked offsite. The contractor was
going to use aggregate base for backfill all the way up. With a jumping jack whacker and compaction wheel
attached to a 308E excavator for compaction efforts. Density testing was performed with the results in this report.
The crew worked on the water service along with the hydrant, both on the south side of the new mainline.
5.5’ of 8” pipe was placed today that took them to the 90 (2-45 degree fittings bolted together) where 17’ of 6”
was placed into the hydrant. Concrete was placed as a kicker behind hydrant prior to backfill.
JVL____
08:00 AM
PM17:00
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
'$7( -2%12
352-(&7
/2&$7,21
2:1(5
&2175$&725
:($7+(5 7(03
) DW $0
)DW30
35(6(17$76,7(
6LHUUD0DQRU'ULYH6XLWH
5HQR1HYDGD
SKRQH
ID[
FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
08/31/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
acombes@stpud.us
jryan@stpud.us
5
53
80
08:00
17:00
3-Glenwood and Fairway (south) 3- Glenwood and Deer
2- Bowers and Birch
1-Glenwood and Ferndale, 1-Glenwood and Cloverdale, 1-Glenwood and Fairway (north) 1- Pine Crest and
Fairway, 1- 3520 Ferndale, 1-Blackwood and Fairway, 1-1189 Fairway, 1-3610 Vanda Lee, 1-3604 Osgood, 1-
Bowers and Shirley, 1-Bobby Grey and Bowers, 1-Bobby Grey and Werner Salas
No concrete cylinders were taken as per Adrian with the STPUD.
JVL____
Aggregate Base, Native
Hydrant Trench
Cinderlite Pit, Trench Spoils
1 1’ BFG
2 2’ BFG
128.3
126.0
5.3 7.2
5.4 7.2
132.6
132.6
97
95
95
95
2
Water Service Trench
Troxler 3430 37748 08/18/21
Direct
2028
10
10
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
10
10
Density
662Moisture
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/31/22 3004 53
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Hammering out for single valve at the intersection of
Ferndale and Glenwood
Sand being placed over service connection at Forest and
Bowers
1.5” service connected at the intersection of Forest and
Bowers
Work continues on 8” water at the Cold Creek site
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/31/22 3004 54
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
2, 45 degree fittings bolted together to make a 90 Saddle placed on 8” pipe where the service will tie into
main
Cutting the 6” piece to run out of 90 into fire hydrant (17’j Hydrant being set at the end of the run
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
08/31/22 3004 55
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Compaction efforts in the hydrant and service (2661 Cold
Creek) areas south of new mainline
Empty bags of concrete that were used to pour kicker on
hydrant at Cold Creek project
Preparing vac truck to locate service at 2658 Cold Creek One of the valves poured, this one in intersection of
Glenwood and Cloverdale