Loading...
fr_3004_9-1-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 09/01/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew Andy and Haen crew acombes@stpud.us jryan@stpud.us 3 53 91 CME personnel arrived on-site to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects. Arrived on-site at 8:00am and found that the Vinciguerra crew continued to perform general cleanup on-site and also began to work on punch list for both projects. Numerous items on the punch list were completed with the major exception being the pavement at the Fairway and Glenwood (north) intersection. There were areas that had been painted out but the contractor did not follow the marks and it still needs to be done. This means that a manhole and 3 valves will have to be lowered and paved over and raised with concrete collars poured before the punch list is to considered completed. At the Cold Creek project the Haen crew continued work for the new 8” PVC waterline. They dug a bore pit in hopes of being able to run a service to 2658 Cold Creek. If they are unable to get the bore through the rocky material the contractor will have to open cut the service and dig in the roadway. The bore was successful and the poly was pulled for the service. The contractor also loaded the line to perform the pressure test. The line needs to hold 150 psi for 2 hours. Taylor with STPUD was going to stay and track the time and pressure. Chlorine was added to water that was loaded so that the contractor could get a start on the bacteria testing that they hope will get started tomorrow. The line will have to be flushed prior to the beginning of the bacteria testing. JVL____ 08:00 AM PM15:00 DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/01/22 3004 32 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cleaning around fire hydrant on Osgood as part of punch list on Bowers project Working the bore machine Bore machine and pit waiting on gas company before we can start Poly line being pulled back through the bore hole DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/01/22 3004 33 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Valve to be abandoned at Bobby Grey and Bowers north Poly fitted into saddle for the service at 2658 Cold Creek Pressure test being performed on Cold Creek DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D