Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
09/01/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Adrian w/STPUD, Vinciguerra crew Andy and Haen crew
acombes@stpud.us
jryan@stpud.us
3
53
91
CME personnel arrived on-site to perform observation and testing as the Vinciguerra crew continued to work on
the Bowers and Bijou waterline replacement projects.
Arrived on-site at 8:00am and found that the Vinciguerra crew continued to perform general cleanup on-site and
also began to work on punch list for both projects. Numerous items on the punch list were completed with the
major exception being the pavement at the Fairway and Glenwood (north) intersection. There were areas that had
been painted out but the contractor did not follow the marks and it still needs to be done. This means that a
manhole and 3 valves will have to be lowered and paved over and raised with concrete collars poured before the
punch list is to considered completed.
At the Cold Creek project the Haen crew continued work for the new 8” PVC waterline. They dug a bore pit in
hopes of being able to run a service to 2658 Cold Creek. If they are unable to get the bore through the rocky
material the contractor will have to open cut the service and dig in the roadway. The bore was successful and the
poly was pulled for the service. The contractor also loaded the line to perform the pressure test. The line needs to
hold 150 psi for 2 hours. Taylor with STPUD was going to stay and track the time and pressure. Chlorine was
added to water that was loaded so that the contractor could get a start on the bacteria testing that they hope will get
started tomorrow. The line will have to be flushed prior to the beginning of the bacteria testing.
JVL____
08:00 AM
PM15:00
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
09/01/22 3004 32
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Cleaning around fire hydrant on Osgood as part of punch
list on Bowers project
Working the bore machine
Bore machine and pit waiting on gas company before we
can start
Poly line being pulled back through the bore hole
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
09/01/22 3004 33
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Valve to be abandoned at Bobby Grey and Bowers north Poly fitted into saddle for the service at 2658 Cold Creek
Pressure test being performed on Cold Creek
DocuSign Envelope ID: 29146510-B39B-4613-88F9-49F1ECA49E0D