Loading...
fr_3004_9-2-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 09/02/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew Andy and Haen crew acombes@stpud.us jryan@stpud.us 3 56 88 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects. Arrived onsite at 8:00am and found that the Vinciguerra crew had not arrived onsite and ran over to the Cold Creek project. Did perform a walk through to see what had been completed and what still needed attention on the punch list, there was still no sign of the Vinciguerra crew. At the Cold Creek project the Haen crew continued work for the new 8” PVC waterline. Was informed by Taylor with STPUD that they had passed the pressure test and the plan was to flush the line and prep for bacteria testing. The STPUD lab was called and bacteria testing was performed. They will have to perform another one in 24 hours and have both tests pass in order to move forward. JVL____ 08:00 AM PM13:00 DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/02/22 3004 32 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Sample being acquired for bacteria test East side of Fairway and Glenwood that needs to be addressed as per punch list Hydrant on Jack Belle used to flush line on Cold Creek West side of Fairway and Glenwood intersection, note the white lines that had been painted over DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/02/22 3004 33 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Flushing new line on Cold Creek Flushing out service on Cold Creek DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A