fr_3004_9-6-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 09/06/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew Andy and Haen crew acombes@stpud.us jryan@stpud.us 4 57 83 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects, as well as the Haen crew on Cold Creek also working on waterline replacement. Arrived onsite at 8:00am and found that the Vinciguerra crew had not arrived onsite and ran over to the Cold Creek project. At the Cold Creek project the Haen crew continued work on the new 8” PVC waterline. The crew was working on the preparation for the saddle placement on the 19” waterline running north/south on Pioneer Trail. The contractor will install the saddle and a STPUD crew will perform the live tap in. This will all happen under the under the watchful eyes of the gas company as they need to present anytime you dig within 5’ of the high pressure gas line. The contractor will also have to give them at least 1’ of clearance with the new 8” waterline that they hope to place under the gas. The crew exposed the pipe and started to work on removing the mastic that was protecting the pipe. It was not easy but they were able to remove it. Went back to the Bijou project and met Adrian with STPUD and we walked the site noting the services and if they had a new G-5 or an old one. We also took note of the alignment in which the pipe was placed on the streets as it varies from what the plans show. The Vinciguerra crew is supposed to be onsite tomorrow working the Fairway and Glenwood intersection and complete a few more punch list items. JVL____ 08:00 AM PM17:00 DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/06/22 3004 42 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 To early?Asphalt zipper online Marking trench for asphalt zipper Ground material left behind by zipper DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/06/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Vac truck being used to clean down to existing water main Shoring being placed for the safety of the crew 19” water main exposed where saddle is to be connected at Cold Creek Trying to remove the protective covering on existing pipe DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/06/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Mini excavator being removed from trailer for use tomorrow Saddle to be placed on existing pipe for tie in DocuSign Envelope ID: 5047CCD9-7DA7-4FB3-8F5B-0CCAC3376D4A