fr_3004_9-7-22DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 FIELD REPORT THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by CONCRETE FIELD TEST SUMMARY 0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU 7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPSƒ) 09/07/22 3004 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 South Lake Tahoe, CA South Tahoe Public Utility District Vinciguerra Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly Cloudy/Calm Adrian w/STPUD, Vinciguerra crew Andy and Haen crew acombes@stpud.us jryan@stpud.us 4 54 83 CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on the Bowers and Bijou waterline replacement projects, as well as the Haen crew on Cold Creek also working on waterline replacement. Arrived onsite at 8:00am and found that the Vinciguerra crew had not arrived onsite and ran over to the Cold Creek project. At the Cold Creek project the Haen crew continued work on the new 8” PVC waterline. It was also noticed that Nevada Sign and Barricade had placed traffic control in preparation for the live tap to be done today. The contractor placed the saddle and valve and ran a pressure test for approximately 2 hours at 150 psi which held steady. The STPUD crew arrived at approximately 12:45pm to perform the tap. They successfully completed the tap and departed at approximately 3:00pm. The Haen crew started to excavate the remainder of the trench in preparation to lay pipe tomorrow. Went back to the Bowers project and met Adrian with STPUD and we walked the site noting the services and if they had a new G-5 or an old one. We also took note of the alignment in which the pipe was placed on the streets as it varies from what the plans show. The Vinciguerra crew is supposed to be onsite tomorrow working the Fairway and Glenwood intersection and complete a few more punch list items. The Vinciguerra’s did have a saw cutter onsite and the intersection of Glenwood and Fairway was cut to the lines that had been previously marked. Also ran to the STPUD project in the Tahoe Keys and picked up a set of 6, 6x12” concrete cylinders that STPUD personnel had cast previously. The cylinders were taken from manhole bases on the project. The cylinders were transported to the laboratory where they were logged in, stripped and placed in a climate controlled room to await further testing. JVL____ 08:00 AM PM16:30 DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/07/22 3004 42 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Traffic control being set up on Pioneer Trail Austerman saw cutting working the Fairway and Glenwood intersection Saw cutter preparing to cut Fairway and Glenwood intersection Valve attached to saddle waiting for hot tap DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/07/22 3004 43 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Saddle and valve tested to 150 psi Tapping tool in hole ready to be attached to valve Tapping tool to be used Full cookie that came out of where pipe was tapped DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E 3+2726 ,QLWLDO DATE JOB NO.3DJHRI PROJECT 09/07/22 3004 44 STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES - TASK ORDER NO. 20 Cylinders that were picked up and transported to the laboratory Manholes that were poured from which cylinders were taken DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E