fr_3004_9-7-22DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
FIELD REPORT
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
CONCRETE FIELD TEST SUMMARY
0L[1R 6SHF6WUHQJWK36, &RQFUHWH *URXW 0RUWDU 2WKHU
7UXFN1R /RFDWLRQ &\OV7DNHQ 6OXPS³ $LU&RQWHQW &RQF7HPS)
09/07/22 3004
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
South Lake Tahoe, CA
South Tahoe Public Utility District
Vinciguerra Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Partly Cloudy/Calm
Adrian w/STPUD, Vinciguerra crew Andy and Haen crew
acombes@stpud.us
jryan@stpud.us
4
54
83
CME personnel arrived onsite to perform observation and testing as the Vinciguerra crew continued to work on
the Bowers and Bijou waterline replacement projects, as well as the Haen crew on Cold Creek also working on
waterline replacement.
Arrived onsite at 8:00am and found that the Vinciguerra crew had not arrived onsite and ran over to the Cold
Creek project.
At the Cold Creek project the Haen crew continued work on the new 8” PVC waterline. It was also noticed that
Nevada Sign and Barricade had placed traffic control in preparation for the live tap to be done today. The
contractor placed the saddle and valve and ran a pressure test for approximately 2 hours at 150 psi which held
steady. The STPUD crew arrived at approximately 12:45pm to perform the tap. They successfully completed the
tap and departed at approximately 3:00pm. The Haen crew started to excavate the remainder of the trench in
preparation to lay pipe tomorrow.
Went back to the Bowers project and met Adrian with STPUD and we walked the site noting the services and if
they had a new G-5 or an old one. We also took note of the alignment in which the pipe was placed on the streets
as it varies from what the plans show. The Vinciguerra crew is supposed to be onsite tomorrow working the
Fairway and Glenwood intersection and complete a few more punch list items. The Vinciguerra’s did have a saw
cutter onsite and the intersection of Glenwood and Fairway was cut to the lines that had been previously marked.
Also ran to the STPUD project in the Tahoe Keys and picked up a set of 6, 6x12” concrete cylinders that
STPUD personnel had cast previously. The cylinders were taken from manhole bases on the project. The
cylinders were transported to the laboratory where they were logged in, stripped and placed in a climate controlled
room to await further testing.
JVL____
08:00 AM
PM16:30
DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
09/07/22 3004 42
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Traffic control being set up on Pioneer Trail Austerman saw cutting working the Fairway and
Glenwood intersection
Saw cutter preparing to cut Fairway and Glenwood
intersection
Valve attached to saddle waiting for hot tap
DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
09/07/22 3004 43
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Saddle and valve tested to 150 psi Tapping tool in hole ready to be attached to valve
Tapping tool to be used Full cookie that came out of where pipe was tapped
DocuSign Envelope ID: 1439790E-F945-41F0-9AAC-383F2FB0F59E
3+2726
,QLWLDO
DATE JOB NO.3DJHRI
PROJECT
09/07/22 3004 44
STPUD 2022 BOWERS & BIJOU 2/3 WATERLINES -
TASK ORDER NO. 20
Cylinders that were picked up and transported to the
laboratory
Manholes that were poured from which cylinders were
taken