Loading...
Notice to Proceed 2022 0727General Manager John A. Thiel outh Tahoe District Directors Chris Cefalu Shane Romsos David Peterson Kelly Sheehan Nick Exline 1275 Meadow Crest Drive • South Lake Tahoe • CA 96150-7401 Phone 530 544-6474 • Fax 530 541-0614 • www otpud,us NOTICE TO PROCEED TO: WHITE ROCK CONSTRUCTION, INC. PROJECT: KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PROJECT, PHASE 3 TYPE OF CONTRACT: CONSTRUCTION AMOUNT OF CONTRACT: $4,457,288.25 You are hereby notified to commence work on the referenced contract on July 27, 2022 and shall fully complete all of the work of said contract within Three Hundred Thirty -Four (334) consecutive calendar days thereafter. Your completion date is, therefore, June 26, 2023. The Contract provides for intermediate milestones as specifically set forth in section 00 72 00 General Conditions, Part 2.04.13.1 of the Contract documents, and Liquidated Damages have been identified in Section 00 72 00 General Conditions, Part 2.04.D if Contractor fails to meet milestones and deadlines Intermediate Milestone 1: Final asphalt paving operations, including trench path and mill and overlay to the extents shown on the Plans, shall be completed prior to September 1, 2022 for the View Circle water main, PRV sites, and Temporary Keller Booster Pump Station site. Pursuant to the provisions under Liquidated Damages in Section 01 35 00, Special Procedures, of these Contract Documents, Two Thousand Five Hundred Dollars ($2,500.00) shall be the amount of liquidated damages for every day of delay in the completion of earthwork -related activities. Two Thousand Five -Hundred Dollars ($2,500.00) shall be the amount of liquidated damages for every day of delay in the completion of work. Dated [s 27th d y�1f July, 2022 By: Jo I, P., M.B.A., General Manager/Engineer South Tahoe Public Utility District ACCEPTANCE OF NOTICE Receipt of the foregoing Notice to Proceed is hereby acknowledged. Dated this IE day of July, 2022 Rock Constru ��y .� Presidefxt S (a(ettY7 it Nai4 and Title)