Loading...
fr_3247_5-25-23_tls'$7( -2%12 352-(&7 /2&$7,21 2:1(5 &2175$&725 :($7+(5 7(03 ƒ) DW $0 ƒ) DW30 35(6(17$76,7( 6LHUUD0DQRU'ULYH6XLWH 5HQR 1HYDGD SKRQH   ID[   FIELD REPORT 7+()2//2:,1*:$6127(' 5HSRUW1R ,1+286(5287(72 (0$,/ -$'BBB Submitted by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outh Lake Tahoe, CA South Tahoe Public Utility District White Rock Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly cloudy/ rain ev Trent Schoppe 6 38 58 07:45 16:00 after placing pipe crew placed base around pipe and compacted it. I performed a density test on base in center of roadway at 5’ BFG. 1st test of base compaction was low, after additional compaction the base was acceptable. The crew continued to backfill with base and I performed another density test at 3’6” BFG and compaction was acceptable. I performed a final density test at 3” BFG and compaction was acceptable. JVL____ Type 2 gag baase STA 10+13.99 Dayton material 1 3 4 5’ BFG 2 5’ BFG 118.3 122.7 123.1 122.9 9.5 3.5’ BFG 3”BFG Trevor Coolidge STPUD George, Les, and crew White Rock Construction 12.4 9.5 9.1 8.5 12.4 12.4 12.4 128.1 128.1 128.1 128.1 92 95 96 96 95 95 95 95 1 STA 10+13.99 (retest) STA 10+13.99 STA 10+13.99 Troxler 3430 19738 09/20/22 Direct 1616 4 6 6 6 - - - - - - - - - - - - 6 6 6 4 Density 616Moisture DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60 DATE JOB NO.3DJHRI PROJECT LOCATION OWNER CONTRACTOR WEATHER TEMP ° F at °F at PRESENT AT SITE 6LHUUD0DQRU'ULYH6XLWH Reno, Nevada 89511 phone (775) 851-8205 fax (775) 851-8593 ),(/'5(3257 THE FOLLOWING WAS NOTED Report No. IN HOUSE ROUTE TO: EMAIL: JAD___ Submitted by 05/25/23 3247 STPUD 2023 INSPECTIONS & TESTING SERVICES - TASK ORDER NO. 21 South Lake Tahoe, CA South Tahoe Public Utility District White Rock Construction Adrian Combes SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Partly cloudy/ rain ev Trevor Coolidge STPUD Trent Schoppe 6 38 58 George, Les, and crew White Rock Construction I arrived onsite and met with George and Les. Crew began cutting asphalt into smaller pieces to begin excavation on Sherman way for new water tank lines. Crew also placed asphalt at 1315 wild wood dr and compacted with a power roller. Jake and Trey assemble T-Valve and placed in trench. Shores were placed in trench and rain water was diverted away from the trench. Crew placed 8” DR-18 into the trench and connected it to T-Valve. I notified German of potential rain early afternoon and he gathered necessary plastic and wattles for stock piles. after placing pipe crew placed base around pipe and compacted it. I performed a density test on base in center of roadway at 5’ BFG. 1st test of base compaction was low, after additional compaction the base was acceptable. The crew continued to backfill with base and I performed another density test at 3’6” BFG and compaction was acceptable. I performed a final density test at 3” BFG and compaction was acceptable. White rock crew: George, Les, Edwardo, Steven, German, Trey, Alex, Jake, Richard, and Dwight. Equipment onsite: Cat 305 ex, Cat 309 ex, Cat 928 loader, Cat 938 loader, IR Air Co press or 250, 10 wheel dump truck, 1 ton truck, 1 ton truck, 4 trench plates, 4 shores, 18 wheel haul truck, IR power roller DD-24. JVL____ 07:45 AM PM16:00 2 DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/23 3247 63 STPUD 2023 INSPECTIONS & TESTING SERVICES - TASK ORDER NO. 21 Sherman way Cutting asphalt into smaller pieces Excavating for new water tank lines Excavating for new water tank lines DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/23 3247 64 STPUD 2023 INSPECTIONS & TESTING SERVICES - TASK ORDER NO. 21 Diverting drain water away from trench Excavating for new water tank lines Asphalt 1315 wild wood dr Compacting asphalt 1315 wild wood dr DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/23 3247 65 STPUD 2023 INSPECTIONS & TESTING SERVICES - TASK ORDER NO. 21 Asphalt 1315 wild wood dr Assembling T Valve Covering t valve in plastic Placing pipe DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60 3+2726 ,QLWLDO DATE JOB NO.3DJH RI PROJECT 05/25/23 3247 66 STPUD 2023 INSPECTIONS & TESTING SERVICES - TASK ORDER NO. 21 Compacting base around pipe and covering with fabric Compacting base Density testing base Backfilling with base DocuSign Envelope ID: B9777FF3-9E24-4CFA-AAB1-038E04256C60