FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/30/23 3247
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
South Lake Tahoe, CA
South Tahoe Public Utility District
White Rock Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Partly cloudy/light ra
Trent Schoppe
5
45
50
07:45
17:00
I performed density testing of base at STA 10+60, compaction was acceptable.
JVL____
Type 2 agg base
STA 10+60
Dayton materials
1 126.3 9.3
Trevor Coolidge STPUD
George, Les, and crew White Rock Construction
128.1 12.4 99 95
1
Troxler 3430 19738 09/20/22
Direct
1623
6
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
6
Density
614Moisture
DocuSign Envelope ID: 5B8B85D6-17B4-4BEA-912D-B36CCE02AFDC
DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
),(/'5(3257
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
05/30/23 3247
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
South Lake Tahoe, CA
South Tahoe Public Utility District
White Rock Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Partly cloudy/light rai
Trevor Coolidge STPUD
Trent Schoppe
5
45
50
George, Les, and crew White Rock Construction
I arrived onsite and met with George and Les.
Crew began excavating for new water line from STA 10+40 to STA 11+00.
Crew discovered large rocks in their excavation and used boulder buster to break up large rock that excavator
couldn’t move.
Crew removed 22 yards of rock excavation.
After excavating the trench crew began placing 8” DR-18 pipe with restrained connections.
Crew opened up 50’ of trench and placed 90’ of DR-18 8” pipe (all restrained connections). 1 - T-Valve, 1 - 11.25
elbow. The two parallel pipe were spaced 1’ minimum apart
After placing pipe crew placed tracer wire, painted all exposed fittings with mastic, and pumped any standing water
out of trench, then backfilled with base and compacted.
I performed density testing of base at STA 10+60, compaction was acceptable.
Crew then backfilled 1 lift of native to T-Valve, then checked all environmental controls and cleaned site before
leaving.
White rock crew: George, Les, Edwardo, Steven, German, Trey, Alex, Jake, Richard, and Dwight.
Equipment onsite: Cat 305 ex, Cat 309 ex, Cat 928 loader, 10 wheel dump truck, 1 ton truck, 1 ton truck, 4 trench
plates, 4 shores, IR Air Co press or 250.
JVL____
07:45 AM
PM17:00
2
DocuSign Envelope ID: 5B8B85D6-17B4-4BEA-912D-B36CCE02AFDC
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/30/23 3247 53
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Laying out trench Rock excavation
Placing pipe Placing pipe
DocuSign Envelope ID: 5B8B85D6-17B4-4BEA-912D-B36CCE02AFDC
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/30/23 3247 54
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Fitting pipe Connecting restraints
Painting mastic on exposed fitting Leveling T-Valve
DocuSign Envelope ID: 5B8B85D6-17B4-4BEA-912D-B36CCE02AFDC
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/30/23 3247 55
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Placing base Compacting base
Compacting base Compacting native
DocuSign Envelope ID: 5B8B85D6-17B4-4BEA-912D-B36CCE02AFDC