FIELD REPORT
7+()2//2:,1*:$6127('
5HSRUW1R
,1+286(5287(72 (0$,/
-$'BBB
Submitted by
FIELD DENSITY SUMMARY
7HVW
1R
0DWHULDO'HVFULSWLRQ(OHYDWLRQ
,Q3ODFH
'U\
'HQVLW\
3&)
,Q3ODFH
0RLVWXUH
&RQWHQW
2SWLPXP
0RLVWXUH
&RQWHQW
0D[LPXP
'U\
'HQVLW\
3&)
,Q3ODFH
&RPSDFWLRQ
6SHFLILHG
5HODWLYH
&RPSDFWLRQ
0LQ0DWHULDO 6RXUFH
)* )LQLVK*UDGH6* 6XEJUDGH5* 5RXJK*UDGH2* 2ULJLQDO*UDGH)7* )RRWLQJ*UDGH%& %DVH&RXUVH3UHIL[% %HORZ
3DJHRI
*DXJH,QIR
6RLOV'HQVLW\5HVXOWV
0RGHO6HULDO1R'DWHRI&DOLEUDWLRQ6WG&RXQW
0HWKRGRI0HDVXUHPHQW
0DNH
5HODWLYH7HVW
'HSWK
LQ
6WG&RXQW
05/31/23 3247
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
South Lake Tahoe, CA
South Tahoe Public Utility District
White Rock Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Sunny
Trent Schoppe
2
36
58
07:45
16:00
After crew compacted native fill I performed a density test at station 10+80. Compaction was acceptable.
Then the crew began to place base fill and compact. I performed a density test at STA 11+10. Compaction was
acceptable.
Top foot of native will be re compacted before laying new pavers.
JVL____
Native and type 2 base
STA 10+80 Native fill
On site / Dayton materials
1 1’ BFG
2 4’BFG
117.7
126.0
6.8
Trevor Coolidge STPUD
George, Les, and crew White Rock Construction
11.3
8.5 12.4
118.0
128.1
99
98
95
95
1
STA 11+10 Base
Troxler 3430 19738 09/20/22
Direct
1613
10
4
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
4
10
Density
613Moisture
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
DATE JOB NO.3DJHRI
PROJECT
LOCATION
OWNER
CONTRACTOR
WEATHER TEMP
° F at
°F at
PRESENT AT SITE
6LHUUD0DQRU'ULYH6XLWH
Reno, Nevada 89511
phone (775) 851-8205
fax (775) 851-8593
),(/'5(3257
THE FOLLOWING WAS NOTED
Report No.
IN HOUSE ROUTE TO: EMAIL:
JAD___
Submitted by
05/31/23 3247
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
South Lake Tahoe, CA
South Tahoe Public Utility District
White Rock Construction
Adrian Combes
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 Sunny
Trevor Coolidge STPUD
Trent Schoppe
2
36
58
George, Les, and crew White Rock Construction
I arrived onsite and met with George and Les.
Crew began Backfilling remainder of trench at STA 10+40 to 11+00,
After crew compacted native fill I performed a density test at station 10+80. Compaction was acceptable.
Crew then began excavating trench from STA 11+00 to 11+30.
Crew discovered more large rocks and used boulder blasters to breakup large rocks into movable sizes.
After excavation the crew placed 32’ of DR-18 8” pipe, and 2 - 22.5 elbows. The two parallel pipe were spaced 1’
min apart.
Crew then placed tracer wire and connected restraints to connections and painted exposed fittings with mastic.
Then the crew began to place base fill and compact. I performed a density test at STA 11+10. Compaction was
acceptable. Top foot of native will be re compacted before laying new pavers.
Another white rock crew was also working at saddle dr and Keller dr starting excavation for tapping saddle
connection.
Crew cut asphalt and excavated around existing utilities clearing around water pipe for tapping saddle connection.
After uncovering the water main the crew noticed the pipe size was 6.9 and their tapping saddle max size is 6.25.
Jake is looking for a correct size tapping saddle.
Buck with STPUD uncovered a sewer man hole 3’ north east of the trench and discovered a water PRV. He
reported to STPUD office and they are looking into it.
White rock crew discovered a 6” steel water pipe and a 4” steel water pipe running through the trench. STPUD
plans to bring a band tomorrow for pipes so white rock crew can test if they are live.
I reviewed the plans with George and Trevor and the service drain at saddle and Keller has been delegated and
replaced with a dry hydrant.
Pass Robles water tank crew also arrived and began unbolting floor on new water tank and preparing to replace
floor.
White rock crew: George, Les, Edwardo, Steven, German, Trey, Alex, Jake, Richard, and Dwight.
Equipment onsite: Cat 305 ex, Cat 309 ex, Cat 928 loader, Cat 938 loader, 10 wheel dump truck, 1 ton truck, 1 ton
truck, 4 trench plates, 4 shores, IR Air Co press or 250.
JVL____
07:45 AM
PM16:00
2
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/31/23 3247 23
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Compacting native Compacting native
Excavating for tapping saddles Uncovering sewer manhole
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/31/23 3247 24
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Water PRV under sewer manhole Density testing native
Placing DR-18 pipe Placing and compacting base
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/31/23 3247 25
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Connecting 22.4 degree elbows Connecting 22.4 degree elbows
Water main Cleaning around water main for tapping saddle
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/26/23 3247 76
STPUD 2023 INSPECTIONS & TESTING SERVICES -
TASK ORDER NO. 21
Unmarked 6” and 4” line Covering trench and cleaning site
Service drain deleted and replaced with dry hydrant Service drain deleted and replaced with dry hydrant
DocuSign Envelope ID: 16C9B26B-DA47-465A-94FD-AFA398FC5667
3+2726
,QLWLDO
DATE JOB NO.3DJH RI
PROJECT
05/26/23 3247 77
STPUD 2023 INSPECTIONS & TESTING SERVICES -