Quick Log_KLHV3 - 060120231    STPUD QUICK LOG Day & Date: Thursday 6-1-2023 Transcribe: ____Yes __x__No Project: Keller Heavenly Improvements Phase 3 (KLHV3) – 2022 Work Contractor: White Rock Construction Company Inspector: Buck McLelland Today’s Weather Forecast: Chance of Precipitation:__20___% Partly cloudy with a chance of PM thunderstorms Crews and Equipment on site: _1_ Project Manager _3_ Operator _1_Truck Driver _1_ Foreman _4_ Laborer EQUIPMENT __ Excavator 328 _1_ Loader 928 __ End Dump Truck _3_ Work Truck _2_ 10 Wheel Dump Truck __ Skip Loader __ Water Truck _1_ Mini Excavator CAT 304 __ TC Truck _1_CAT 304.5 Mini Excavator Contractor Requests (shutdowns, pours, etc.): Tests: Service/Utility Hits: Potential Change Order Items/T&M: Work Completed Today: Contractor installed saddles for hot taps on both lines One 6X10 Tapping Saddle and one 6x6 tapping saddle Pressure tested both saddles Drilled and tested two unmarked steel water lines both pipes were dead Ran a 25 foot tape down pipe to check for any valves and was clear concreted the ends of the pipes in both ditches after cutting them out of the way Notes: (Visitors, Incidents, Accidents):