061021STPUD QUICK LOG
Day & Date: k/12" 01101V
Project: Keller Heavenly Improvements Phase 1 (KLHV1)
Contractor: White Rock Construction Company
Todav's Weather Forecast: Chance of Precipitation:—P—°Io
'S vAom Y 4dw GO'
Crews and Equiament on site:
Project Manager /Lv*r'f
1 Foreman c 0_4
EQUIPMENT
_ Excavator 328
10 Wheel Dump Truck
I Mini Excavator CAT 304
Skip Loader Case 570MXT
Transcribe: Yes x No
Inspector: Matthew Mendoza
_ Operator _Truck Driver
Laborer G-i'+!^-,'4X --)
L- 0w.h"0 K;2H*9,.P
/ Loader 938M I Water Truck
Loader 928M 3 Work Truck
Mini Excavator CAT 309GR i TC Truck
I Forklift CAT TL642D
Contractor Reauests (shutdowns. pours, etc.): ,�,ta,�•d.� es /yzJ
GJ0cs r Kor T*P5 /r-a�:. �, r, gi4.�t r ,,Gs bA-Y o�.-rxr
✓P T �•dA�s aG �L�.!
Tests:
�I IT---
Service/Utility Hits:
•v Pt
Potential Chance Order Items/T&M:
/V 14--
Work Completed Today:
C&._.i e,V r p E M p a.A4) K w*c, L SJ •+--but cv k *z�G- Fig r� T � Ec �� o�/L
Notes: [Visitors. incidents. Accidents]:
NI4'
1