061721STPUD QUICK LOG
Day & Date: I KV �;// 1/21
Project: Keller Heavenly Improvements Phase 1 (KLHV1)
Contractor: White Rock Construction Company
Today's Weather Forecast: Chance of Precipitation: %
Transcribe: Yes _x.,No
Inspector: Matthew Mendoza
Crews and Eauir)ment on site:
i Project Manager ^4--f-r = Operator ,Truck Driver
1 Foreman Lcss 3 Laborer
EQUIPMENT » .
Excavator 328 Loader 938M Water Truck
2 10 Wheel Dump Truck _ Loader 928M Z Work Truck
Mini Excavator CAT 304 Mini Excavator CAT 309GR I TC Truck
Skip Loader Case 570MXT _ Forklift CAT TL642D
Contractor Requests (shutdowns, pours, etc.):
Nb't i 14P WAt_yK OP F24p*,y GIi%
Tests: _ _
P ?_6S$ ✓R.e 'VGS r 6 a .� ✓ �r�
Service/Utility Hits:
N (.A -
Potential Chance Order Items/T&M:
`rt r.. D"
Work Completed Today:
'fEs � 6- o N :5*Oer
eyc k r'(d op.) L O * GK tAAZ C0 L L O &-V Z-90� 'eD G � e� SG' 7'O
30�,ad oa teL"
Notes: (Visitors, Incidents, Accidents):