070121STPUD QUICK LOG
Day & Date: �Hd 7/
Project: Keller Heavenly Improvements Phase 1 (KLHV1)
Contractor: White Rock Construction Company
Todav's Weather Forecast: Cha ce of Precipitation: 5%> %
$ r.Aef-1 a"V S r{ 0w &J-S i+ �-- -rm J..44.5 t� V R- �..•L
Crews and Eauicment on site: ,
I Project Manager M AY*(rs; _ Operator
I ForemanL66s 3 Laborer
ED��Do
EQUIPMENT
_ Excavator 328
1 10 Wheel Dump Truck
1 Mini Excavator CAT 304
Loader 938M
Loader 928M
j_ Skip Loader Case 570MXT
Contractor Reauests (shutdowns, pours, etc.): 1
PO --�aP ,�ic1z�, C'RB�[� �vGs 0 k y (7/C,
Tests:
TZZ
Service/Utility Hits:
S6L06P_ LhT LID E41 CX S-f
Potential Chanae Order Items/T&M:
Co KoL C;' D ky "l//-,
Transcribe:
Yes _x_No
Inspector: Matthew Mendoza
—Truck Driver
Water Truck
Z Work Truck
TC Truck
1 a Pe 2-
Work Comcleted Todav: 1)? sYt"t L � 7 WA 1,
`CT� T, J N6V 8? PSG ro c s ,
o 1J if 6A 8c"2`f
Notes: (Visitors, Incidents, Accidents):
1