070721Date:  Wednesday, 7/7/2021  Project: Keller Heavenly Phase 1  Inspector: Aaron Zook, STPUD    Crew on Site: Matt (Project Manager), Les (Operator), German (Laborer), Waggy (Laborer), Ricardo  (Laborer)    Equipment on Site: CAT 304C Loader, Work Truck, Work Truck w/Trailer, Dump Truck    Daily Log:  8‐9:30am: I was not on site. Contractor prepped for the days work and additional excavation in  Herbert/Warr to expose unrestrained barrel couplers on both sides of tee.  9:30am: I arrive on site at Herbert and Warr. Chuck from STPUD heavy maintenance is on site welding  tabs to restrain barrel coupler.  10:45am: Welding restraints complete. Chuck cleans up and leaves site.  10:50am: Contractor removing portion of concrete thrust block that is covering the flange.  11am: Concrete removal complete. Valves are closed and contractor cuts into existing main and begins  dewatering at lower excavation in Herbert/Warr.  11:15am: Dewatering complete. Contractor cuts existing main to be abandoned at excavation in  Herbert/Pioneer Trail.  11:20am: Begins unbolting flange on tee.  11:40am: Contractor installing blind flange on tee.  Noon: Abandonment complete. Blind flanges are installed on tee at Herbert/Warr and on abandoned  gate valve in Herbert/Pioneer Trail.  12:15‐12:45pm: Contractor takes lunch  1pm: Begin backfilling excavation in Herbert/Pioneer Trail. Abandoned main has been capped with  concrete plug.  1:30pm: Begins backfilling excavation in Herbert/Warr.  4:10pm: Contractor has completed backfill and temporary AC in both excavations. Herbert has been  reopened. Contractor is moving traffic control materials to Janet/Pioneer Trail for abandoning valve  tomorrow.  4:30pm: Contractor finished for the day.