Project: Keller Heavenly Improvements Phase 1 (KLHV1)
Contractor: White Rock Construction Company
Transcribe: Yes x No
Inspector: Matthew Mendoza
Todav's Weather Forecast: Chance of Precipitation: � %
k):�b GS PSt M ❑ KAIL9'/S p-'�C gC Ca 1 AJ AJ y A rtLH qZ'
Crews and Eauioment on site:
/ Project Manager 4k4 't _ Operator I Truck Driver Dos.740T
Foreman LESS Laborer o
EQUIPMENT
Excavator 316F Loader 928M I Water Truck
Mini Excavator CAT 304 Skip Loader Case 570MXT Work Truck
Mini Excavator CAT 309 R End Dump Truck TC Truck
I Loader 938M A 10 Wheel Dump Truck
Contractor Reauests (shutdowns, pours, etc.):
AJ (Ar
Tests:
a it,
Service/Utility hits:
iV ('ff
Potential Chance Order Items/T&M:
Al
Work Completed Todav:
Ev C*vT'rr AWL tr't.gG 4m.).0gV75 PA&A4 PALP (k*PA IAa"u6A) To
Pa...;,,EX Foci k.ad NEv CA,8r,,e-r
' •� ���. S�2v..�. � I f.ZO �LECCG R,
'Visitors. Incidents. Accidents):
IP R.0 -�a re(.e%scdA a KC Rr'rec