082421STPUD QUICK LOG
Day & Date: fu b S ISO I't 1
Project: Keller Heavenly Improvements Phase 1 (KLHV1)
Contractor: White Rock Construction Company
Todav's Weather Forecast: Chance of Precipitation: %
Apr � �F-eA�i7 µ �S a �, s✓�+.. y 9,T&A 79
Crews and Eauioment on site:
1 Project Manager M*e-( _ Operator
Foreman Laborer
JrG 1 FORa+A'+'A) * 3 µµk-'WA) -kLkKoR-
EQUIPMENT Fr�4�wi�cr�.
F o Loader 928M
Mini Excavator CAT 304 Skip Loader Case 570MXT
Mini Excavator CAT 309 End Dump Truck
Loader 938M 10 Wheel Dump Truck
Contractor Reauests (shutdowns. r)ours. etc.):
AJc0�--
-r^ .+e
iv I't,
Service/Utility Hits:
N (Ai
Potential Change Order Items/T&M:
.J (A'
Work Com0eted Todav:
V l C 3705-(4tu66 Jr e/l ", rxe5
U4Asfa UcK "oMaPt.. PoV LgfkFPS ,J ,vE&.' 4t.JCr
Notes: (Visitors. Incidents. Accidents):
$7-1-<G)L no R. K.P.FvS I;bJL.. ,5 0. X1 1.( e✓i� K
Transcribe: Yes x No
Inspector: Matthew Mendoza
S. G • whop 1.1r- to -,c Pif
Truck Driver
Water Truck
Work Truck
TC Truck
1