Loading...
Notice of Completion Recorded 2022 1109 (LF)Recorded in Official Records _ County of E1 Dorado RECORDING REQUESTED BY: Jane 11 e K . Horne Recorder -Clerk SOUTH TAHOE PUBLIC UTILITY DISTRICT 2022-0043122 ATTN: STARLET GLAZE 11/09/2022 Titles: 1 Pages: 3 WHEN RECORDED MAIL TO: 11 SLT29.27 AM Fees: $$0.00 Taxes: $0.00 .00 ICP CA tal:Fee: $$$0.00 SOUTH TAHOE PUBLIC UTILITY DISTRICT 1275 Meadow Crest Drive ,III�1♦trf�l ���; +���r�5NVIR, `��1�1�5tir`�'�1 �IIII South Lake Tahoe, CA 96150 � SPACE ABOVE THIS LINE FOR RECORDER'S USE APN: N/A NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described. 2. The FULL NAME of the OWNER is South Tahoe Public Utility District 3. The FULL ADDRESS of the OWNER is 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 4. The NATURE OF THE INTEREST or ESTATE of the undersigned is: In fee. (If other than fee, strike "in fee" and insert here, for example, "purchaser under contract of purchase," or "lessee." 5. The FULL NAMES and FULL ADDRESSES of ALL PERSONS, if any, WHO HOLD SUCH INTEREST or ESTATE with the undersigned as JOINT TENANTS or as TENANTS IN COMMON are: Name & Address Name & Address 6. The FULL NAMES of FULL ADDRESSES OF THE PREDECESSORS in INTEREST of the undersigned if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Name & Address Name & Address 7. A work of improvement on the property hereinafter described was COMPLETED on September 16, 2022. 8. The work of improvement completed is described as follows: Keller -Heavenly Water System Improvements Project, Phase 1-REBID 9. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is White Rock Construction, Inc. 10. The street address of said property is: See Exhibit "A" attached. 11. The property on which said work of improvement was completed is in the City of South Lake Tahoe, County of El Dorado, State of California, and is described as follows: As shown in Exhibit "A" attached hereto and made a part hereof. I�ellv>a IfI S4P.6�I" DATE: October6,2022 echanIGa6.n;?21?:W0T) SIGNATURE OF OWNER OR AGENT OF OWNER Kelly Sheehan, Board President VERIFICATION FOR INDIVIDUAL OWNER: I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the owner of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and the facts stated therein are true and correct. DATE AND PLACE SIGNATURE OF OWNER NAMED IN PARAGRAPH 2 VERIFICATION FOR NON -INDIVIDUAL OWNER: SOUTH TAHOE PUBLIC UTILITY DISTRICT I, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the Board President of the aforesaid interest or estate in the property described in the above notice; that I have read the said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct. October 6, 2022 at South Lake Tahoe, California x ly�i ech,nso�es.� D Dl: DATE AND PLACE SIGNATURE OF PERSON SIGNING ON BEHALF OF OWNER Kelly Sheehan, Board President EXHIBIT "A" Notice of Completion Keller -Heavenly Water System Improvements Project, Phase 1- REBID The site of the work is in the Heavenly Valley neighborhood of the City of South Lake Tahoe and adjoining unincorporated land in the County of El Dorado, California, including work on District property, US Forest Service land, private property, and adjacent right-of-way. The work to be performed consists of: installation of approximately 945 LF of 8" PVC waterline, transfer of domestic water services, fire hydrant installations, demolition of an existing water tank, grading and structural fill for a new tank pad, rockfall fencing installation, roadway grading, construction of a concrete water tank foundation, tank site piping, abandonment of existing piping, removal and replacement of a pressure reducing valve and vault, instrumentation and communication equipment, paving and curb restoration, contaminated soil removal, implementation of permanent erosion control measures at the tank site, and other related activities described in the plans and specifications. Notice of Completion Keller -Heavenly Water System Improvements Project, Phase 1- REBID EXHIBIT "A" ■_,� wae� South Tahoe Fublic Utility District 1275 Meadow Crest Drive - South Lake Tahoe • CA 96150-7401 Phone 530 54446474 - Fax 530 541-00-14- www.stpud.us CERTIFICATION I hereby certify that the foregoing is a full, true, and correct copy of the Notice of Completion that was approved by the Board of Directors of the South Tahoe Public Utility District, County of El Dorado, State of California, and executed by Board President, Kelly Sheehan. rr[ j 1,rry�``44'+ Date Approved: 11-3-2022 SF AL IkT i��••.... ....'~ County Certified by: �rrrrrq,,,iiiiiint,„ t,,,'• Melonie Guttry, Clerk of the Board