070722STPUD QUICK LOG
Day & Date: N v r7 7 1. Transcribe: Yes X No
Project: Tahoe Keys Pump Station Replacement
Contractor: T&S Construction Inspector: Mendoza
Today's Weather Forecast: Chance of Precipitation: %
ik*7_6 &V'' 'Ctf- -TPtA S 0N.9 i AX&.H r7E)' S.W.--_q.o,pS Io-LS'hP
Crews and Equipment on site:
l Foreman 3 s C
_ Truck Driver
Electrician
EQUIPMENT
VOLVO ECR235EL Excavator
r Work Truck — 1 Ton
1 Kobelco CK1100G Crane
Operatorpa
L Welder AAA How y
C
110 Wheel Dump Truck
_JDitch Witch Vac Trailer
! M.t.0s
Contractor Requests shutdowns. pours. etc.):
N(t4�
Tests Performed.
.k)I A--
Service/Utility„ Hits:
A" (A
Potential Change Order Items/T&M:
A) /A
Laborer SOK.4j
Pile Driver
SoilMec Drill Rig SR-30
VOLVO L60G Loader
Work Completed Today:
.—TA)S hf-C 14)6 L'_)eI✓A " 44A,LCA54' ?_L4_-)M)2eL-°'RC ^' O� Tv pc cgF7,5f/C6
%1- (_ L S
Notes: (Visitors, Incidents, Accidents):
- )0 (-P�'
1