082922STPUD QUICK LOG
Day & Date: - thO A� 8 ZQ [ vLt
Project: Tahoe Keys Pump Station Replacement
Contractor: T&S Construction
Today's Weather Forecast: Chance of Precipitation:_%
L,p .,ay VtUH 8511 N , LIrz..P s1-..P4
Crews and Equipment on site:
1 Foreman ?�
_ Truck Driver
Electrician
EQUIPMENT
VOLVO ECR235EL Excavator
Ditch Witch Vac Trailer
L John Deere 17c Mini Ex
Transcribe: Yes X No
Inspector: M og--+4Tta.
Operator cAVY FPt,,VJe,
_ Welder
10 Wheel Dump Truck
1 CASE 621E Loader
Contractor Requests (shutdowns, pours, etc.):
C-SAJcf-e"Q5 Tour. weep (91,511Z7-) MA.�Nac-1
Tests Performed:
Service/Utility Hits -
A) (_,k-
Potential Change Order Items/T&M:
N ['-
Work Completed Today:
&0pe fait' LAN [ h5r ,w.6a'f �100 S+� Yo �6Z UPCCL
Cx c AV k C; CV, ,A.H "i K I orA#d rt 6-r1&7 5 KoJt.t.vL--
Notes:_(Visitors, Incidents. Accidents):
3 Laborer .7_; ee y
_ Pile Driver
Z Work Truck — 1 Ton
Kobelco CK110OG Crane
1