101222STPUD QUICK LOG Day & Date: LoED i of I Z.! L L Project: Tahoe Keys Pump Station Replacement Contractor: T&S Construction Today's Weather Forecast: Chance of Precipitation: % Crews and Equipment on site: 1 Foreman 0E Operator ��'RRY. R06ta c Truck Driver Welder ao, .Jk� E'3 EQUIPMENT / VOLVO ECR220 Excavator 1 10 Wheel Dump Truck Ditch Witch Vac Trailer 4_ CASE 621 E Loader John Deere 6b; Mini Ex(o�WHW Corr Transcribe: Yes X No Inspector: A46APADzy, .�-aCr EL Laborer -:re) �A Electrician Work Truck -- 1 Ton Prima Contractor Requests (shutdowns, pours, etc.): Sf�Pz�G- STEaS�cg� Cow'tk�trA 6.1 ir y oTi Sc,T swa7 sKoA Tests Performed: i A Service/Utility Hits: A.) I Ar Potential Change Order Items/T&M: t.,# t Ar Work Completed Today: 6.Rk D106, 14r0D P 2LP F-+oR- AM.*�-� CL6k-A-) OP Notes: (Visitors --Incidents , Accidents): 1