Loading...
Quick Log TKSPSR_062823STPUD QUICK LOG Day & Date: Wednesday 062823 Transcribe: Yes No Project: Tahoe Keys Pump Station Replacement Contractor: T&S Construction Inspector: M. Mendoza Today’s Weather Forecast: Chance of Precipitation: 30%, Isolated showers and thunderstorms after 11am Sunny, highs near 72°, north winds 5mph Crews and Equipment on site: Crew: Offsite by 5pm 1 Foreman: Joe Operator: 2 Laborers: Devon, John Truck Driver: Welder : Electrician: Equipment: 1 Work Truck – 1 Ton 1 Crane Broderson IC-80 1 Mini Ex Contractor Requests (shutdowns, pours, etc.): Tests Performed: Service/Utility Hits: Potential Change Order Items/T&M: Work Completed Today: Finished installing nonshrink grout at the pipe penetrations at the valve vault and the wet well Installed 2 sack sand slurry (dry) in and around the piping between the vault and wet well and under the building where the water service left a void Started excavation for the odor scrubber and the drain line exiting the existing wet well to the new wet well Notes: (Visitors, Incidents, Accidents): At about 9:40am the backflow device inside the building on the freshwater line started leaking, I contacted Mike Chieffo to let him know.